Landscape Plans
Notes: Notes: Notes:
- Thoroughly water the root ball - Place the rootball on a firmed base to achieve required FSL. - Place the rootball on a firm base.
immediately after planting. - Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting.
Tree guard only required - Number of stakes will vary with pot size. Refer plant schedule. - Cultivate sides of excavated hole 50mm deep.
when specified in Materials - Cultivate sides of excavated hole 50mm. - Do not disturb kerb, road pavement or road side drainage works.
& Finishes Schedule - Tease out roots on side of rootball when planting.
Marker stake: - Ensure top of rootball is not buried; expose and set flush with finished level.
Hardwood Stake Size:
12 x 12 x 75mm 140mm = 25 x 25 x 90mm
Form an earthen basin Hardwood Stake Size:
200mm = 25 x 25 x 90mm 45ltr = 2 x (38 x 38 x 1800mm)
around the base of the plant. 25ltr = 38 x 38 x 1800mm 75ltr = 2 x (50 x 50 x 1800mm)
Mulch: Pull away from 250 100ltr = 2 x (50 x 50 x 1800mm)
base of plant. Hardwood Stake: 25 x 25 x 200ltr = 2 x (50 x 50 x 2400mm) 90mm∅ capped slotted pipe
90mm. Place 600mm into
25
the ground. Do not place Hardwood stake: Place 600mm 75mm below top of planter
through rootball. Secure with into the ground. Do not place connected to drainage system
Fertiliser: Do not allow River stone to per Hydraulic Engineer
ties by looping in a figure through rootball. Secure with
contact with roots. top of pipe
eight pattern. ties by looping in a figure eight Mulch
pattern. - refer to plans for organic or
Topsoil blend Mulch - pull away
Raise plant 50mm above inorganic locations
from base of plant.
finished surface level. Podium soil
Water retention additive
Form an earthen basin - refer to Specification
Mulch: Pull away from
around base of plant. UrbanScape 20mm Green Roll, where
varies
base of plant.
soil depth is less than 200mm.
Form an earthen basin
Geotextile fabric
1 TUBESTOCK PLANTING Topsoil blend
around base of plant.
30mm Atlantis drainage cell
CD-300 1:10@A1, 1:20@A3 or similar approved
Fertiliser: Do not allow
contact with roots.
Topping slab - If required.
Depth varies to achieve falls
Water retention additive Topsoil blend
to drain.
min 300
Water retention additive
Waterproofing and protection
1 - to Architect's Specification.
Fertiliser: Do not allow
fertiliser to come in 1
2 140-300mm PLANTING contact with roots.
Podium / basement slab
- refer Engineer's detail.
CD-300 1:10@A1, 1:20@A3
width (w)
10 - 20mm Drainage gravel
2xw 4 PODIUM PLANTER
CD-300 1:10@A1, 1:20@A3
varies
3 45-200ltr PLANTING
CD-300 1:10@A1, 1:20@A3 Loose end cap over pipe.
Raised garden bed, refer materials
and finishes schedule.
Mulch - refer to Specification.
Mulch as per landscape plans.
FSL Brick Paver - laid on side. Set in
and join bricks with mortar 100mm∅ PVC pipe, for water inlet.
Mulch
- to 100mm depth slurry. 15mm x 150mm Poly Irrigation Rigid
Cut-Off Riser for water overflow.
varies
Turf - refer to Specification.
Soil blend or site topsoil Podium soil - refer to Specification.
Topsoil - refer to Specification
- to 300mm depth Geotextile fabric.
Cultivated subgrade - refer to 20mm drainage aggregate, minimum 300mm
Specification. depth.
Cultivated subgrade 100mm∅ Aggi pipe with holes.
- to 150mm depth Compacted roadbase to be
300
Nom. 200mm thickness. Waterproofing and protection cover entire base
Notes: and side, with some overhang of garden bed.
-Refer Materials & Finishes Existing subgrade End cap to close the Aggi pipe up.
Schedule for fertiliser
application requirements
5 GARDEN BED PROFILE 6 EDGE TYPE 1 7 WICKING PLANTING BED
CD-300 1:10@A1, 1:20@A3 CD-300 1:5@A1, 1:10@A3 CD-300 1:10@A1, 1:20@A3
Brick Garden Edge
Planting area to finish 20mm
below top of wall and mounded.
Refer to Landscape Plans
Artificial turf to be glued to Second bolder where
required supported by
700 MAX
compacted subgrade as per
manufacturer's specifications. lower boulder
Turf as specified Igneous landscape
Apply washed and dried silica sand
boulder with smooth
if required by manufacturer's
edges set 1/4 below
Topsoil specifications.
F.S.L finished level
- to 100mm depth 20mm compacted crusher dust.
Compacted road
Cultivate subgrade 80mm of comapcted roadbase. base. 75mm deep.
Sub-grade
- to 150mm depth
Sub-soil drainage
Existing subgrade. and geofabric behind
Existing subgrade wall
Note. Turf to be rolled down at
edges and glue fixed to face of
edging or patio slab
10 LANDSCAPE BOULDER RETAINING WALL
8 TURF TYPE 2 9 TURF TYPE 1 CD-300 1:10@A1, 1:20@A3
CD-300 1:5@A1, 1:10@A3 CD-300 1:5@A1, 1:10@A3
Natural Turf Synthetic Turf
Revision Date Amendment Drawn Checked
CONSTRUCTION DETAILS
APPROVAL ONLY A 10.04.2026 For Approval CS CS
NOT FOR CONSTRUCTION
CD-300 scale as noted
62 LAKE MACDONALD DRIVE, COOROY
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Landscape Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.