Original source · versioned page text
Attachment C - Stormwater Management Plan - 30-32 Doonella Street_SMP-revA_full (00016826)
Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.
aqua Contents EXECUTIVE SUMMARY I 1 INTRODUCTION 1 1.1 SITE CHARACTERISTICS 1 2 STORMWATER QUALITY 3 2.1 DESIGN OBJECTIVES 3 2.2 STORMWATER QUALITY TREATMENT 3 2.2.1 STRATEGY 3 2.3. MODELLING APPROACH 3 2.3.1 MUSIC PARAMETERS 3 2.3.2. CATCHMENT AREAS 4 2.3.3. MUSIC MobEL LAYOUT 5 2.4 TREATMENT MEASURES 6 2.4.1 RAINWATER TANKS 6 2.4.2 BIORETENTION SYSTEM 7 2.5 RESULTS 8 3 STORMWATER QUANTITY 9 3.1 EXISTING SCENARIO 9 3.2 RATIONAL METHOD CALIBRATION 10 3.3. DEVELOPED SCENARIO 11 3.4 MITIGATED SCENARIO 12 4 CONSTRUCTION PHASE STORMWATER MANAGEMENT 13 5 OPERATIONAL PHASE STORMWATER MANAGEMENT 14 6 CONCLUSIONS 15 7 REFERENCES 16 APPENDICIES Appendix 1: Site Layout 17 Appendix 2: Rational Method and WBNM Output 18 FIGURES Figure 1: Locality Plan 2 Figure 2: WSUD Catchment and Locality Plan 5 Figure 3: Model Layout 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.