Original source · versioned page text
Attachment C - Stormwater Management Plan - 30-32 Doonella Street_SMP-revA_full (00016826)
Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.
TABLES Table 1: Table 2: Table 3: Table 4: Table 5: Table 6: Table 7: Table 8: Table 9: Table 10 Table 11 Table 12 Table 13 Table 14 Site stormwater quality objectives (operational phase) MUSIC Base and Storm Flow Concentration Parameters — Urban MUSIC Runoff Generation Parameters - Urban Catchment Areas MUSIC Rainwater Tank Parameters Bioretention Basin Design Parameters MUSIC Results — Load-Based Pollutant Outputs Existing Scenario WBNM Outlet Peak Flows Rational Method Calibration Summary (Total Catchment) : Rational Method Peak Flows Versus WBNM Peak Flows : WBNM Sub-Catchment Fraction Impervious Values — Developed Scenario : Developed Scenario WBNM Outlet Peak Flows : Storage and Outlet Details of Underground Detention System : Comparison of Existing, Developed and Mitigated WBNM Outlet Peak Flows aqua WOON OHH HRW PRPRPRPPR NNPRPRPOO
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.