Council archive · source document
Attachment 5 - Stormwater Managment Plan · 132007.12.8
Attached to the e-mail 132007.12.8 - Changes Application - Noosaville Medical and Professional Centre 90 Goodchap Street , Noosaville.
Plans and drawings: the text below has words only, no drawings.
2.5 Results
MUSIC modelling of the proposed treatment train for the developable area of the
subdivision at Lot 4 Goodchap Street, Noosaville was performed to ensure the load
based Water Quality Objectives was achieved. Table 6 presents the load-based
outputs that are represented by this Material Change of Use application.
Table 6: MUSIC Results – Load-Based Pollutant Outputs
Unmitigated Mitigated Reduction Target
Pollutant Compliance
(kg/yr) (kg/yr) Achieved (%) Reduction
TSS 163 31.9 80.4 80% ✓
TP 0.658 0.17 74.1 60% ✓
TN 8.79 3.35 61.9 45% ✓
GP 61.1 0 100 90% ✓
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.