Council archive · source document
Attachment 5 - Stormwater Managment Plan · 132007.12.8
Attached to the e-mail 132007.12.8 - Changes Application - Noosaville Medical and Professional Centre 90 Goodchap Street , Noosaville.
Plans and drawings: the text below has words only, no drawings.
3 Stormwater Quantity
The objective of this component of the study is to investigate the potential impact
that the proposed development will have on peak flows discharging downstream of
the site. Where any increases of peak flows are found, potential mitigation options
will be investigated in the form of a detention system.
Hydrologic modelling of the catchment has been carried out using WBNM software
developed jointly by the University of Wollongong, Rienco Consulting and Balance
R&D. The January 2012 version has been used for this investigation.
Modelling has been carried out for the 1, 2, 5, 10, 20, 50 and 100 year ARI storm
events. The following scenarios have been investigated:
1. Existing Scenario
2. Developed Scenario
3. Mitigated Scenario
3.1.1 Existing Scenario
Sub-catchment fraction impervious values have been calculated based on aerial
imagery data and consistent to with existing Telstra site to the north and the existing
unsealed carpark. The existing carpark could be considered 100% impervious,
however, as there is likely to be slightly more runoff from a roofed surface, the existing
carpark has been assigned a fraction impervious of 80%. The existing scenario sub-
catchment areas and fraction impervious values for each sub-catchment are tabulated
below in Table 7. The existing catchment plan is shown below in Figure 4.
Table 7: Sub-Catchment Area and Fraction Impervious Values – Existing Scenario
Existing Scenario
WBNM Sub-Catchment Area (ha)
Impervious (%)
SUB1 0.262 56
SUB2 0.202 80
TOTAL 0.464
In the existing scenario, there is one outlet, with all flows reporting to the bushland
park downstream of the site. Peak flows reporting to this outlet are presented
below in Table 8.
Table 8: Peak Flows at Each Outlet
1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Catchment (m3/s)
(m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s)
Outlet 0.101 0.142 0.192 0.220 0.259 0.279 0.314
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.