Attachment 5 - Stormwater Managment Plan · 132007.12.8

Attached to the e-mail 132007.12.8 - Changes Application - Noosaville Medical and Professional Centre 90 Goodchap Street , Noosaville.

of 34

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
3.1.2 Developed Scenario
The proposed development has been incorporated into the WBNM model by adjusting
the site fractions impervious values. Area and fraction impervious values for the
developed scenario are provided in Table 9 below. The impervious percentage of this
scenario are reflective of the development being proposed.
Table 9: Sub-Catchment Area and Fraction Impervious Values – Developed Scenario
                                                              Developed Scenario
   WBNM Sub-Catchment                 Area (ha)
                                                                Impervious (%)
           SUB1                            0.262                     56
           SUB2                            0.202                     90
           TOTAL                           0.464

As the development, will direct all flows from the site to the outlet reported as
‘Easement’ in Figure 4 and Table 8, peak flows in the developed scenario will be
compared to flows at this outlet. A comparison of the existing and developed is
presented below in Table 13.
Table 10: Developed Scenario Outlet Peak Flow Comparison – Easement Outlet
                      Existing Peak Flow      Developed Peak Flow   Change in Peak Flow
                             (m3/s)                  (m3/s)               (m3/s)
       1 year               0.101                    0.107                   0.006
       2 year               0.142                    0.146                   0.004
       5 year               0.192                    0.195                   0.003
       10 year              0.220                    0.223                   0.003
       20 year              0.259                    0.261                   0.002
       50 year              0.279                    0.280                   0.001
      100 year              0.314                    0.315                   0.001

It can be seen that the peak flows have increased slightly to the catchment outlet.
This is a result of the development site increasing the impervious area. Mitigation
within the catchment will be required. The developed catchment is the same as the
existing catchment shown in Figure 4.




                                                                                     13

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Stormwater Managment Plan.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.