Council archive · source document
07/0616 - Response to Information Request [As Published] · 132007.616
® Page3 Comment: Item 7: “Comment: item 8: Comment: ftem 9: Comment: The proposal plans detail the location of significant vegetation within proximity to the access driveway. These plans also detail the proposed removal or retention of each species. Photographs and details of the existing vegetation are provided below. African Tulip in foreground and Pandanus, Two Bribie Island Pines in foreground Umbrella Trees, Golden Cane & Bribie Island Pine in background As can be seen in these photographs, the vegetation located within the road reserve has been heavily pruned due the overhead powerlines. It is noted that in order to construct the proposed basement carparking area that substantial excavation works are required and that the proposed basement carparking area and access driveway will be constructed adjacent to the northem and southern property boundaries. Please provide detail on the proposed methods to be used to construct the basement and stabilise the adjoining buildings, structures, land and Council services. The amended Site Plan included as Attachment 1 details that the proposed. basements have been ‘pulled back’ from the side boundaries. SCG Consulting Engineers have prepared a report based upon these amended plans. This report details the proposed methods to be used to construct the basements and stabilise the adjoining buildings, structures, land and Council services. A copy is included as Attachment 2. Please provide comment from a suitably qualified RPEQ with regard to the proposed construction/stabilised methods. The report included as Attachment 2 has been prepared by a suitably qualified RPEQ. It is noted that the proposed works will alter the natural overland flow of stormwater through the subject site. Please provide a preliminary stormwater disposal design for the site. The preliminary design should include the measures to be undertaken to address the overland flow of stormwater from the upstream properties the location of the rainwater tanks, the run- off from the access driveway and carparking area and the connection point to Council's existing drainage system on Attunga Heights. The report included as Attachment 2 provides a preliminary stormwater disposal design for the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0616 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.