Skip to the record
The only place to find full transcripts.

Original source · versioned page text

RECOR Preliminary Stormwater Management Report - 20220130

of 15

Page text shows just the words. Original shows the document exactly as it was published.

     2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
        minimise sediment being transported to and from the site.

     3. Diversion of upstream catchments around any exposed areas using diversion drains around the site.

     4. Ensuring any loose material tracked from the construction site onto the road is swept and removed prior to
        the end of the day.


     4.2. Operational Phase
The development consists of a small lot duplex consistent in character with the existing residential dwelling. The
proposed development is not considered to significantly alter the pollutant generation potential of the site, and
therefore no additional stormwater quality treatment is proposed for the development.




Project number 20220130
File RECOR Preliminary Stormwater Management Report - 20220130, 2022-11-08                                       Page 11 of 15
Revision 3


P +61 7 5211 1003                          A 75 Noosa Drive, Noosa Heads Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220130.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.