 CONCLUSION

This Stormwater Management Report has outlined how the stormwater run-off from the site is to be managed to
comply with the relevant requirements and minimise any adverse impacts to the downstream catchments.

         The proposed site stormwater run-off is captured internally and discharge by kerb adaptors into Safari Street
          as the lawful point of discharge. Field inlet pits are provided within the development to capture upstream
          run-off and subsoil drainage from retaining walls to convey it to the point of discharge.

         Provision of 3kL tank per dwelling complies with the Sustainable Building Design code for reuse.

         The existing and proposed development site have been modelled for the critical design storm events for the
          site, which found there would be only a minor increase to peak flows that is unlikely to impact downstream
          properties or infrastructure. No attenuation is therefore proposed for the development.

         During construction, erosion and sediment control measures are to be implemented to minimise potential
          contaminants impacting the downstream receiving environment in line with the objectives of Appendix 2 of
          the SPP. An erosion and sediment control plan shall be developed as part of a submission for Operational
          Works approvals.

         As the development is a small residential site that does not significantly alter the pollutant generating
          characteristics of the site, stormwater quality treatment is not proposed for the development.

         The proposed stormwater solution is considered to minimise any adverse impacts to the downstream
          environment arising from the stormwater run-off while also meeting the stormwater quantity targets required
          for the development.




Project number 20220130
File RECOR Preliminary Stormwater Management Report - 20220130, 2022-11-08                                       Page 12 of 15
Revision 3


P +61 7 5211 1003                          A 75 Noosa Drive, Noosa Heads Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220130.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.