Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

nc_an25_digital

of 108

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (20.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

Noosa Council Annual Report 24/25
Annual Report 24 25




noosa.qld.gov.au

                   1

as —> Zs =e ; , ‘ na ee art a a - aS as nee Ee ee i er 4 , ~ ‘’ \ ‘ x : | J tea e f _Jeaeee ~ al eS ‘ oe ! ; e- rN ~ bien ne 4 & san? 4 NS iP, > - —_ = YY, J - > ee ee i, -f | ‘ Li h\"\? y ra * a aa, ie — aa, Vie wu a A\e7 eg ont ora so ie if ~ 2 WA a SS cate ‘4 x 0 Se ae oe VA Sa 22. - = ae Se Se BS SAY a ee eee ae VE ~ ox -_= ‘\ = + i =, SS — ans a ——) Ss == es. — fh = Se . = eS eS SSS SS — A v SS — | = ai = SS — ae = —— as = = ee eee ann Se SS Se eee Se eS : ; ae — . = Se eS = eS ee Ss 0 Se ae Oe a ae a %y “3) \ 5	1	1	1	27	6	400	1105	2	3	11	:
5	1	1	1	27	7	459	1101	41	36	0	——
5	1	1	1	27	8	532	1102	23	28	30	=
5	1	1	1	27	9	569	1099	113	28	25	SS
5	1	1	1	27	10	793	1092	51	58	33	ss
5	1	1	1	27	11	969	1093	12	8	25	5
5	1	1	1	27	12	1035	1094	173	43	13	=
5	1	1	1	27	13	1321	1122	5	4	45	=
5	1	1	1	27	14	1345	1098	21	34	25	os
5	1	1	1	27	15	1457	1103	20	14	0	<
5	1	1	1	27	16	1545	1095	27	38	25	=
5	1	1	1	27	17	1644	1105	115	22	62	==
5	1	1	1	27	18	1930	1096	39	28	6	=
5	1	1	1	27	19	1983	1110	32	24	90	=
5	1	1	1	27	20	2090	1094	102	43	14	es
5	1	1	1	27	21	2207	1112	16	17	51	=
5	1	1	1	27	22	2256	1102	15	31	80	=
5	1	1	1	27	23	2293	1131	8	2	0	-
4	1	1	1	28	0	315	1130	1971	37	-1	
5	1	1	1	28	1	315	1137	113	22	46	See
5	1	1	1	28	2	743	1135	57	9	76	—
5	1	1	1	28	3	855	1145	13	5	26	=
5	1	1	1	28	4	1169	1130	175	28	0	=v.e
5	1	1	1	28	5	1615	1135	79	21	45	“|
5	1	1	1	28	6	1962	1144	8	4	35	Pe
5	1	1	1	28	7	2057	1140	229	22	57	oo
4	1	1	1	29	0	1	1197	2291	43	-1	
5	1	1	1	29	1	1	1199	12	19	70	|
5	1	1	1	29	2	165	1197	251	43	35	oe
5	1	1	1	29	3	497	1225	20	8	33	Sa
5	1	1	1	29	4	656	1235	6	1	19	a
5	1	1	1	29	5	1210	1229	4	1	19	.
5	1	1	1	29	6	1304	1216	2	4	29	:
5	1	1	1	29	7	1434	1237	4	2	33	.
5	1	1	1	29	8	2282	1228	10	3	36	=
4	1	1	1	30	0	163	1296	2150	140	-1	
5	1	1	1	30	1	163	1371	21	9	87	~
5	1	1	1	30	2	532	1376	141	48	13	FT
5	1	1	1	30	3	712	1324	45	69	74	tr
5	1	1	1	30	4	785	1325	29	94	0	.
5	1	1	1	30	5	882	1336	92	75	19	Teer
5	1	1	1	30	6	995	1382	61	20	39	ry
5	1	1	1	30	7	1109	1392	18	5	38	~
5	1	1	1	30	8	1184	1401	7	7	77	>
5	1	1	1	30	9	1232	1337	37	62	50	a
5	1	1	1	30	10	1322	1333	69	103	28	Ph
5	1	1	1	30	11	1407	1337	77	95	41	a]
5	1	1	1	30	12	1509	1296	346	137	44	“et
5	1	1	1	30	13	2085	1360	67	49	33	ere
5	1	1	1	30	14	2258	1390	5	4	0	:
5	1	1	1	30	15	2288	1345	25	60	60	3
4	1	1	1	31	0	184	1389	2116	66	-1	
5	1	1	1	31	1	184	1400	264	36	0	rans
5	1	1	1	31	2	726	1404	4	10	3	Pe
5	1	1	1	31	3	894	1400	57	36	17	ye
5	1	1	1	31	4	1133	1400	308	38	30	ee
5	1	1	1	31	5	1733	1408	355	42	8	ra
5	1	1	1	31	6	2141	1389	159	66	43	ee
4	1	1	1	32	0	1347	1423	968	70	-1	
5	1	1	1	32	1	1347	1423	50	29	24	we}
5	1	1	1	32	2	1673	1437	11	9	0	-
5	1	1	1	32	3	1760	1444	5	2	41	.
5	1	1	1	32	4	1785	1424	11	44	27	A
5	1	1	1	32	5	1945	1448	1	4	0	'
5	1	1	1	32	6	2100	1424	13	51	47	Ny
5	1	1	1	32	7	2216	1424	99	69	0	oFy
4	1	1	1	33	0	1717	1512	596	28	-1	
5	1	1	1	33	1	2051	1506	69	39	13	TT
5	1	1	1	33	2	2220	1512	39	28	39	Ra
4	1	1	1	34	0	1130	1756	265	45	-1	
5	1	1	1	34	1	1130	1756	8	34	17	}
5	1	1	1	34	2	1238	1772	21	24	23	SRT
5	1	1	1	34	3	1332	1762	63	39	25	hie
4	1	1	1	35	0	783	1888	171	74	-1	
5	1	1	1	35	1	783	1914	25	48	58	4
5	1	1	1	35	2	920	1888	34	51	0	.
4	1	1	1	36	0	788	1955	1352	89	-1	
5	1	1	1	36	1	788	1955	180	86	0	ts
5	1	1	1	36	2	1939	1973	201	71	15	et
4	1	1	1	37	0	671	2018	1398	29	-1	
5	1	1	1	37	1	671	2022	4	6	0	.
5	1	1	1	37	2	872	2029	32	18	39	“
5	1	1	1	37	3	1950	2018	6	11	58	\
5	1	1	1	37	4	1988	2019	2	2	52	5
5	1	1	1	37	5	2060	2029	9	11	0	¥
4	1	1	1	38	0	650	2039	1422	28	-1	
5	1	1	1	38	1	650	2056	7	4	40	7
5	1	1	1	38	2	930	2040	57	27	35	a
5	1	1	1	38	3	2063	2039	9	12	41	7
4	1	1	1	39	0	840	2046	1254	64	-1	
5	1	1	1	39	1	840	2072	44	31	27	iP
5	1	1	1	39	2	1159	2046	168	41	35	YS
4	1	1	1	40	0	594	2082	438	81	-1	
5	1	1	1	40	1	594	2082	46	55	76	W
5	1	1	1	40	2	846	2107	20	30	6	7
5	1	1	1	40	3	905	2095	26	52	55	vl
5	1	1	1	40	4	991	2100	41	63	23	tA
4	1	1	1	41	0	632	2133	524	65	-1	
5	1	1	1	41	1	632	2148	20	24	0	.
5	1	1	1	41	2	821	2143	16	16	0	Tse
5	1	1	1	41	3	986	2133	72	65	44	YA’
5	1	1	1	41	4	1134	2137	22	44	79	é
4	1	1	1	42	0	524	2163	425	47	-1	
5	1	1	1	42	1	524	2163	64	47	36	“ae
5	1	1	1	42	2	609	2180	6	5	9	.
5	1	1	1	42	3	648	2168	26	38	37	wt
5	1	1	1	42	4	947	2186	2	5	18	4
4	1	1	1	43	0	949	2150	208	110	-1	
5	1	1	1	43	1	949	2150	51	110	10	on
5	1	1	1	43	2	1002	2180	31	76	81	|
5	1	1	1	43	3	1115	2183	42	50	63	ry
4	1	1	1	44	0	577	2274	813	81	-1	
5	1	1	1	44	1	577	2274	75	49	0	~
5	1	1	1	44	2	923	2298	217	57	0	sepa
5	1	1	1	44	3	1354	2306	8	17	90	/,
5	1	1	1	44	4	2053	2278	62	33	65	=
4	1	1	1	45	0	166	2340	862	62	-1	
5	1	1	1	45	1	166	2349	14	49	23	/
5	1	1	1	45	2	518	2359	53	38	25	ate
5	1	1	1	45	3	901	2340	5	3	0	—
4	1	1	1	46	0	163	2365	1874	100	-1	
5	1	1	1	46	1	163	2391	3	21	42	I
5	1	1	1	46	2	198	2391	39	42	34	'G,
5	1	1	1	46	3	307	2428	1	5	32	1
5	1	1	1	46	4	470	2389	86	76	23	aa ae = mh /| “ i KX i | Ny ad 5	1	1	1	47	8	719	2471	14	41	37	i,
5	1	1	1	47	9	791	2449	15	50	34	‘
5	1	1	1	47	10	900	2434	60	80	28	My
5	1	1	1	47	11	975	2429	134	90	32	SOA
5	1	1	1	47	12	1529	2488	10	8	33	,
4	1	1	1	48	0	239	2481	898	81	-1	
5	1	1	1	48	1	239	2494	191	46	22	ZX)
5	1	1	1	48	2	432	2475	46	91	30	|)
5	1	1	1	48	3	993	2481	67	81	2	SY
5	1	1	1	48	4	1529	2497	23	31	59	/
4	1	1	1	49	0	181	2492	1603	122	-1	
5	1	1	1	49	1	241	2529	250	77	32	aie
5	1	1	1	49	2	926	2513	307	101	41	NAC
5	1	1	1	49	3	1782	2579	2	5	48	|
4	1	1	1	50	0	164	2588	1613	61	-1	
5	1	1	1	50	1	207	2596	68	37	6	1
5	1	1	1	50	2	414	2588	55	61	0	yo
5	1	1	1	50	3	1014	2593	138	38	17	Bose
5	1	1	1	50	4	1199	2592	50	32	64	We
5	1	1	1	50	5	1531	2591	97	26	14	a.
5	1	1	1	50	6	1685	2593	2	15	18	I
5	1	1	1	50	7	1770	2593	7	12	45	ae
4	1	1	1	51	0	176	2590	1592	133	-1	
5	1	1	1	51	1	176	2636	37	33	0	.
5	1	1	1	51	2	267	2666	29	17	0	-
5	1	1	1	51	3	928	2598	89	85	11	kA
5	1	1	1	51	4	1110	2600	84	88	41	Hy
5	1	1	1	51	5	1285	2590	167	133	35	aly
5	1	1	1	51	6	1570	2660	13	13	52	/
5	1	1	1	51	7	1757	2642	11	19	0	)
4	1	1	1	52	0	361	2666	1792	178	-1	
5	1	1	1	52	1	361	2722	5	9	0 a4 F) | NW y slo La J Do i. . r tf ae 4 a bof ae “ . i MSOC Wy ar Pr) . ‘ y . B P| 1 \ MN ad 7 — — 7 ‘ , sf
Log in to download the original file

nc_an25_digital.pdf · 20.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

Full text of sections 2 to 37 (of 108)

Section 2

                                                                                                  noosa.qld.gov.au


Where to get a copy
The Noosa Shire Council Annual Report can be downloaded via the Council’s
website (www.noosa.qld.gov.au/ about-council/councillors-meetings/council-
reports) and is accessible in PDF format.

In line with Council’s ongoing commitment to sustainability, a limited number of
hard copies of the Annual Report are produced. These can be viewed by the
public at the Customer Service Counter, Tewantin Administration Building.



Audience for this report
This report informs the community and stakeholders including residents,
ratepayers, local businesses, visitors, prospective staff, government agencies
and other interested parties.

It also provides council staff with organisational performance information and



                                                                                         Building
how their efforts have contributed to achieving the vision and what to expect in
the coming year.



Acknowledgements
Noosa Shire Council would like to acknowledge and thank all staff                        a brighter
                                                                                         future.
and stakeholders who have contributed to the completion of the Report.
Design and Creative Direction: Jaime Kiss



Photography
Photographs and images featured in the Report include contributions from
members of the community and staff. Thank you to all photographers.
Front cover image: Photography by Justine Bath.

Connect with us



noosa.qld.gov.au


© Noosa Shire Council 2025

Noosa Shire Council supports the dissemination and exchange of information.
However, copyright protects this publication. Noosa Shire Council has no objection
to this material being reproduced, made available online or electronically but only if
it is recognised as the owner of the copyright and this material remains unaltered.

                                                                                                     Noosa Council
                                                                                                Different by nature.
                                          2

Section 3

​Acknowledgement of Country           07   ​​ ​Councillors’ Expenses and Facilities           98
Contents   Welcome                               09   ​​ ​Overseas Travel                                99
           ​Message from the Mayor               10   ​​ ​Councillor Conduct                             99
           ​Message from the CEO                 11   ​​ ​Governance Framework                           101
           ​1 Our Shire                          13   ​​ ​Ethics and Integrity                           101
              ​Discover                         14   ​​ ​Risk and Opportunity Management                102
              ​Our Location                      15   ​​ ​Audit and Risk Committee                       102
           ​ ​Shire Facts                       16   ​​ ​Internal Audit                                 103
           ​ ​Environment                       19   ​ ​​Information Access                             103
           ​ ​Liveability                       21   ​ ​Council Registers                               104
           ​ ​Prosperity                        23   ​​ ​Administrative Action Complaints               105
           ​2 Our Council                        25   ​​ ​Privacy Complaints                             106
           ​ ​Elected Members                   26   ​​ ​Human Rights Complaints                        106
           ​ ​Services                          29   ​​ ​Executive Remuneration                         107




                                                                                                                Noosa Council Annual Report 24/25
           ​ ​Customer Service                  35   ​​ ​Resolutions                                    108
           ​ ​Engaging with our community       36   ​​ ​Community Grants                               108
              ​Council in Focus                 39   ​​ ​Discretionary Funds                            115
           ​ ​Mission, Principles & Values      40   ​ ​​Beneficial Enterprises                         115
           ​ ​Corporate Planning                42   ​​ ​Business Activities                            116
              ​Organisational Structure         44   ​​ ​Competitive Neutrality                         116
           ​ ​Our People                        46   ​​ ​Special Rates and Charges                      116
           ​3 Our Performance                    53   ​​ ​Summary of Concessions for Rates and Charges   117
           ​ ​​Year in Review                   54   ​ ​​Procurement                                    118
              Theme 1 – Environment              56   ​​ ​I​​nvitations to Change Tender                121
           ​​ ​Theme 2 – Liveability            60   5 Financial Performance                             123
           ​​ ​Theme 3 – Prosperity             66   ​ ​​Community Financial Report                     124
           ​​ ​Theme 4 – Future                 70   ​​ ​Financial Statements 2024 – 2025               138
           ​​ ​Theme 5 – Excellence             74   ​6 Appendices                                       203
           ​​ ​Key Performance Indicators       86   ​​ ​Legislative Compliance                         204
           ​4 Disclosures                        95   ​​ ​Index of Figures and Tables                    206
           ​ ​Council Meetings and Attendance   96   ​​ ​Glossary and Index​                            209
           ​​ ​Councillor Remuneration          97

                                           4                                                 5

Acknowledgement of Country Or 4 Councillors’ Expenses and Facilities STs} Welcome 09 Overseas Travel bese Message from the Mayor 10 Councillor Conduct 1S )] Message from the CEO 11 Governance Framework 101 1 Our Shire 13 Ethics and Integrity 101 Discover 7 Risk and Opportunity Management ley Our Location 15 Audit and Risk Committee ley Shire Facts 16 Internal Audit sles) Environment 19 Information Access sles) MWV(=¥-10)] [187 21 Council Registers (074) Prosperity 23 Administrative Action Complaints alle) 2 Our Council 25 Privacy Complaints 106 Elected Members 26 Human Rights Complaints 106 Services 29 Executive Remuneration 107 Customer Service 35 Resolutions 108 xX Engaging with our community 36 Community Grants 108 TAN Council in Focus 39 Discretionary Funds 115 Mission, Principles & Values 40 Beneficial Enterprises 115 Corporate Planning cA Business Activities 116 Organisational Structure a Competitive Neutrality 116 Our People 46 Special Rates and Charges 116 3 Our Performance 53 Summary of Concessions for Rates and Charges anv Year in Review oe Procurement 118 Theme 1 - Environment 56 Invitations to Change Tender 4 Theme 2 - Liveability o10) 5 Financial Performance 123 Theme 3 - Prosperity 66 Community Financial Report Vea Theme 4 - Future (0) Financial Statements 2024 - 2025 138 Theme 5 - Excellence 74 6 Appendices 203 86 yer Key Performance Indicators Legislative Compliance 4 Disclosures 95 206 Index of Figures and Tables 96 209 Council Meetings and Attendance Glossary and Index Councillor Remuneration ste

Section 4

                                                                                                                                                                    Acknowledgment of Country
                                                                                    Acknowledgement
                                                                                    of Country




                                                                                                                                                                    Noosa Council Annual Report 24/25
                                                                                    Noosa Council proudly acknowledges and respects Australia’s First Nations
                                                                                    people and their deep and abiding connection to this country. We recognise
                                                                                    the Kabi Kabi people as the Traditional Owners of the lands and waters of the
                                                                                    Noosa area and offer gratitude for their careful custodianship of this unique
                                                                                    environment over thousands of years. We pay respect to the Kabi Kabi people,
                                                                                    past, present and emerging.




Noosa Shire Council signs the historic Kabi Kabi Commitment in a moving ceremony.
                                                    6                                                                         7

Section 5

                      Welcome
Noosa Shire Council
                      The Annual Report is a comprehensive summary of our
                      performance for the period 1 July 2024 to 30 June 2025.




is proud to present
                      The Report also presents Noosa Shire Council’s (Council)
                      audited Annual Financial Statements as well as governance and
                      statutory information with the aim of providing comprehensible




                                                                                       Noosa Council Annual Report 24/25
                      information to our community.


our Annual Report     This Report also provides the disclosure requirements relating
                      to the Queensland Local Government Act 2009 (LG Act) and


for 2024 – 2025
                      associated Local Government Regulation 2012 (LG Regulation),
                      and other statutory reporting requirements.




to the Noosa Shire
                      The Report aligns to five key Corporate Plan themes and
                      highlights a range of achievements made in delivering services
                      to our community.



community.            This Annual report is part of our commitment to open,
                      transparent and accountable governance.




         8                                         9

Section 6

                                                 Message                                                                                                                              Message
                                                 from the Mayor                                                                                                                       from the CEO
The 2024-25 Noosa Council Annual Report reflects a year              Council facilitated the biggest single investment in social    Our 2024/25 Annual Report recaps a productive year                   The biggest and most challenging construction contract
of continued dedication to serving our community and                 housing in the Noosa Shire. This subdivision at 62 Lake        delivering for our community.                                        ever was the completion of the $40 million landslide repair
improving the liveability and resilience of this exceptional         Macdonald Drive in Cooroy will include an architect-                                                                                works on Black Mountain Road at Black Mountain.
place that we all love.                                              designed 25-unit social housing project. It’s a clear          We addressed challenges facing our community in areas
                                                                     commitment to helping deliver affordable housing               such as housing and state planning regulations, while                We’re grateful to Australian and Queensland Governments
Over the past 12 months, Council has delivered over $45              for those most in need and a key action of the Noosa           overseeing vital infrastructure delivery, repair and renewal.        through the Disaster Recovery Funding Arrangements
million worth of capital works, a testament to the hard work         Housing Strategy.                                              These pages illustrate, too, our commitment to genuine               for covering the cost of this repair work also, following the
and commitment of our infrastructure services team.                                                                                 community engagement and advocacy on the issues that                 2022 floods.
                                                                     Council endorsed revised planning scheme amendments            matter most.




                                                                                                                                                                                                                                                                         Noosa Council Annual Report 24/25
This is in addition to an existing $100 million flood                reflecting community feedback, which aim to deliver greater                                                                         We restored the popular Doggy Beach at Noosa Spit, which
reconstruction program, which has resulted in a total of             choice of housing, increase housing supply for residents and   One of our most significant achievements has been the                earned a Coastal Engineering Award from IPWEA QNT.
$145 million directed to building and renewing infrastructure        key workers and help meet state-imposed dwelling targets.      Noosaville Foreshore Infrastructure Master Plan. More than
and repairing damaged assets in hinterland communities                                                                              2000 community members contributed to shaping this                   We approved a new funding agreement with Tourism
impacted by the 2022 floods.                                         These proactive measures are designed to allow us to have      long-term vision for one of Noosa’s most cherished public            Noosa and continued to finalise the next draft of a
                                                                     autonomy over the future planning of Noosa, rather than        spaces. The plan will guide improvements over the next 20            Destination Management Plan for Noosa Shire. This plan,
Roads, bridges, transport and stormwater infrastructure              waiting for the state to mandate more drastic measures to      years, ensuring the foreshore remains accessible, climate-           being developed with our community, will guide future
were a major focus. Council also spent $6.4 million                  achieve the targets through the SEQ planning process.          resilient, and true to Noosa’s character.                            tourism funding, and help balance Noosa’s popularity with
improving our parks, community facilities and                                                                                                                                                            the need to protect liveability.
sportsgrounds and a further $2.3 million upgrading                   Our planning team assessed 525 development applications,       We endorsed the Pomona Place Plan. Another community-
pathways, boardwalks and trails.                                     approving 508 (97%), ensuring thoughtful and sustainable       led initiative, that sets out actions to support the local           The year has presented several challenges, including a
                                                                     growth across the shire.                                       economy, protect Pomona’s character, improve transport               significant fraud incident, a period of protected industrial
Completing major projects like the second stage of Ed                                                                               and connectivity, and strengthen the arts and environment.           action, and natural disasters. Despite these obstacles,
Webb Park at Sunshine Beach, the Peregian Beach                      Despite challenges such as labour shortages, material                                                                               Council has responded decisively, strengthening processes
Skate Park, upgrading Noosaville’s Pirate Playground and             supply constraints, rising construction costs, the             We’ve advanced our housing strategy with new financial               and procedures, where needed, to enhance resilience and
improving sports field lighting at Sel Bonnel Oval, Cooroy           unprecedented protected industrial action and being            incentives to encourage smaller, more affordable homes.              reinforce its overall capability for the future.
Sports Complex were other significant achievements.                  targeted by an international crime syndicate, Council
                                                                     has remained steadfast in its mission to deliver for our       We also submitted our planning scheme amendments –                   This summary from the past 12 months shows the
Council signed a historic commitment to joint custodianship          community and remain in a financially strong position.         developed with the community - to the state for approval.            dedication and commitment of Council staff, who
of the lands and waters of Noosa in partnership with Kabi                                                                           These changes aim to improve housing diversity, limit short-         continually put the community first. Our people are
Kabi Peoples Aboriginal Corporation (KKPAC).                         Many of the achievements are a credit to our dedicated         stay accommodation in our residential areas, while ensuring          our most important asset and their dedication helps
                                                                     CEO, Directors and staff who continually contribute to         we meet state housing targets in a way that protects the             our organisation to continue to meet and exceed the
This Commitment is a recognition of the role that residents,         making Noosa a special place to live, work, and visit.         landscape and way of life our community knows and loves.             expectations of our community.
businesses and visitors share as custodians and reminds us
that we all rely on nature to thrive.                                                                                               Our staff have worked tirelessly on a range of projects
                                                                                                                                    and initiatives during the year.


                                                                       Frank Wilkie                                                                                                                      Larry Sengstock
                                                                       Mayor                                                                                                                             Chief Executive Officer



                                                                10                                                                                                                                  11

Section 7

12
13




     Noosa Council Annual Report 24/25

x A ae on Cam, at he, Lalas prs = a ~~ <2 a Po ao Para ue ia ee te — + _— a 7 al ey ae oe < ne) a> TA ' = Se are — e 1 an) -% a ~~ aS aed Ll oo a ie Ri an ee i = <= a LAS ~ ot 62 ST — and ‘= = ht = ot a “a tae ahd o ~ > a Ad i ro aa) Pee a e Ren es or ~~ ay, J ——- + : —? aoe sy P< a“ nt id ae Pa =f A es Sd aed a a ci ed rh 7 - w w = ~“ ir. Ss > eet ed 4 Sy) as ard Ses: S —* at ae. eee ral pe) “ ay l os »~ 2 ee SS th a ea! Nb ae = rin’s A See ce ee 4 ws “2 a x oa ay ary iJ es is Sh ne a Pee Sages a = ead eee Pe Sz ad 1% ~_— oe eo ie es ae oy ey —~ or Se. om Pat a “es ao eal Sn — pan — Xr 7 / rs Eda! se i 3 i) ae i e,4 mw a os —< 5 be A ap eZ M3 ig im) / —. £t as nal \ ae — th Pe vn > WE . U bs _ a aoe \ 'S 7 Pea a. ie Ys a >> yo aS 2	1	230	0	0	0	833	2494	29	25	-1	
3	1	230	1	0	0	833	2494	29	25	-1	
4	1	230	1	1	0	833	2494	29	25	-1	
5	1	230	1	1	1	833	2494	29	25	35	asd
2	1	231	0	0	0	1025	2486	28	11	-1	
3	1	231	1	0	0	1025	2486	28	11	-1	
4	1	231	1	1	0	1025	2486	28	11	-1	
5	1	231	1	1	1	1025	2486	28	11	0	-
2	1	232	0	0	0	1941	2482	30	19	-1	
3	1	232	1	0	0	1941	2482	30	19	-1	
4	1	232	1	1	0	1941	2482	30	19	-1	
5	1	232	1	1	1	1956	2482	15	19	17	7
2	1	233	0	0	0	2167	2492	61	21	-1	
3	1	233	1	0	0	2167	2492	61	21	-1	
4	1	233	1	1	0	2167	2492	61	21	-1	
5	1	233	1	1	1	2167	2492	61	21	44	mae
2	1	234	0	0	0	2230	2478	21	21	-1	
3	1	234	1	0	0	2230	2478	21	21	-1	
4	1	234	1	1	0	2230	2478	21	21	-1	
5	1	234	1	1	1	2230	2478	21	21	26	ot}
2	1	235	0	0	0	1413	2509	41	35	-1	
3	1	235	1	0	0	1413	2509	41	35	-1	
4	1	235	1	1	0	1413	2509	41	35	-1	
5	1	235	1	1	1	1413	2509	41	35	28	tha
2	1	236	0	0	0	2456	2517	43	14	-1	
3	1	236	1	0	0	2456	2517	43	14	-1	
4	1	236	1	1	0	2456	2517	43	14	-1	
5	1	236	1	1	1	2456	2517	8	9	0	~z
2	1	237	0	0	0	836	2550	17	11	-1	
3	1	237	1	0	0	836	2550	17	11	-1	
4	1	237	1	1	0	836	2550	17	11	-1	
5	1	237	1	1	1	836	2550	17	11	3	es
2	1	238	0	0	0	2068	2528	45	45	-1	
3	1	238	1	0	0	2068	2528	45	45	-1	
4	1	238	1	1	0	2068	2528	45	45	-1	
5	1	238	1	1	1	2068	2528	45	45	22	TA.
2	1	239	0	0	0	2360	2518	71	48	-1	
3	1	239	1	0	0	2360	2518	89	48	-1	
4	1	239	1	1	0	2360	2518	71	48	-1	
5	1	239	1	1	1	2360	2518	27	31	52	af
5	1	239	1	1	2	2414	2544	17	22	36	Le
2	1	240	0	0	0	1547	2558	49	30	-1	
3	1	240	1	0	0	1535	2558	61	30	-1	
4	1	240	1	1	0	1547	2558	49	30	-1	
5	1	240	1	1	1	1547	2558	49	30	2	so
2	1	241	0	0	0	178	2563	150	68	-1	
3	1	241	1	0	0	178	2563	150	68	-1	
4	1	241	1	1	0	178	2563	150	68	-1	
5	1	241	1	1	1	178	2583	31	41	28	Ps
5	1	241	1	1	2	233	2563	56	63	44	if
5	1	241	1	1	3	309	2592	19	39	0	s
2	1	242	0	0	0	1584	2599	49	33	-1	
3	1	242	1	0	0	1584	2599	49	33	-1	
4	1	242	1	1	0	1584	2599	49	33	-1	
5	1	242	1	1	1	1584	2599	49	33	0	Yfi
2	1	243	0	0	0	1719	2633	9	5	-1	
3	1	243	1	0	0	1719	2633	9	5	-1	
4	1	243	1	1	0	1719	2633	9	5	-1	
5	1	243	1	1	1	1719	2633	9	5	7	*
2	1	244	0	0	0	1825	2630	41	10	-1	
3	1	244	1	0	0	1825	2630	41	10	-1	
4	1	244	1	1	0	1825	2630	41	10	-1	
5	1	244	1	1	1	1857	2630	9	9	41	Ad
2	1	245	0	0	0	1825	2564	72	64	-1	
3	1	245	1	0	0	1825	2564	72	64	-1	
4	1	245	1	1	0	1825	2564	72	64	-1	
5	1	245	1	1	1	1825	2564	72	64	55	4
2	1	246	0	0	0	2344	2614	43	10	-1	
3	1	246	1	0	0	2344	2614	43	10	-1	
4	1	246	1	1	0	2344	2614	43	10	-1	
5	1	246	1	1	1	2380	2614	7	10	15	ud
2	1	247	0	0	0	1966	2632	24	19	-1	
3	1	247	1	0	0	1966	2632	24	19	-1	
4	1	247	1	1	0	1966	2632	24	19	-1	
5	1	247	1	1	1	1966	2632	24	19	80	4%
2	1	248	0	0	0	2033	2623	29	20	-1	
3	1	248	1	0	0	2033	2623	29	20	-1	
4	1	248	1	1	0	2033	2623	29	20	-1	
5	1	248	1	1	1	2033	2623	29	20	0	*
2	1	249	0	0	0	2114	2560	82	104	-1	
3	1	249	1	0	0	2114	2560	82	104	-1	
4	1	249	1	1	0	2114	2560	82	104	-1	
5	1	249	1	1	1	2114	2560	82	104	29	‘G
2	1	250	0	0	0	2235	2635	57	24	-1	
3	1	250	1	0	0	2235	2635	57	24	-1	
4	1	250	1	1	0	2235	2635	57	24	-1	
5	1	250	1	1	1	2235	2635	57	24	32	ae
2	1	251	0	0	0	276	2677	22	11	-1	
3	1	251	1	0	0	276	2677	22	11	-1	
4	1	251	1	1	0	276	2677	22	11	-1	
5	1	251	1	1	1	276	2677	22	11	45	ad
2	1	252	0	0	0	1274	2645	52	38	-1	
3	1	252	1	0	0	1274	2645	52	38	-1	
4	1	252	1	1	0	1274	2645	52	38	-1	
5	1	252	1	1	1	1274	2645	52	38	38	3
2	1	253	0	0	0	1373	2653	76	27	-1	
3	1	253	1	0	0	1373	2653	76	27	-1	
4	1	253	1	1	0	1373	2653	76	27	-1	
5	1	253	1	1	1	1373	2653	76	27	0	+4
2	1	254	0	0	0	1678	2679	28	13	-1	
3	1	254	1	0	0	1678	2679	28	13	-1	
4	1	254	1	1	0	1678	2679	28	13	-1	
5	1	254	1	1	1	1678	2679	28	13	61	>
2	1	255	0	0	0	1780	2670	17	7	-1	
3	1	255	1	0	0	1780	2670	17	7	-1	
4	1	255	1	1	0	1780	2670	17	7	-1	
5	1	255	1	1	1	1780	2670	17	7	2	nh
2	1	256	0	0	0	2100	2660	57	19	-1	
3	1	256	1	0	0	2100	2660	57	19	-1	
4	1	256	1	1	0	2100	2660	57	19	-1	
5	1	256	1	1	1	2100	2660	57	19	12	*%
2	1	257	0	0	0	1376	2690	55	17	-1	
3	1	257	1	0	0	1376	2690	55	17	-1	
4	1	257	1	1	0	1376	2690	55	17	-1	
5	1	257	1	1	1	1376	2690	55	17	0	eft
2	1	258	0	0	0	178	2708	55	26	-1	
3	1	258	1	0	0	178	2708	55	26	-1	
4	1	258	1	1	0	178	2708	55	26	-1	
5	1	258	1	1	1	178	2708	55	26	17	Pe
2	1	259	0	0	0	285	2726	33	23	-1	
3	1	259	1	0	0	285	2726	33	23	-1	
4	1	259	1	1	0	285	2726	33	23	-1	
5	1	259	1	1	1	285	2726	33	23	66	>
2	1	260	0	0	0	1494	2691	65	54	-1	
3	1	260	1	0	0	1494	2691	65	54	-1	
4	1	260	1	1	0	1494	2691	65	54	-1	
5	1	260	1	1	1	1494	2691	65	54	21	abe’
2	1	261	0	0	0	1831	2729	37	9	-1	
3	1	261	1	0	0	1831	2729	37	9	-1	
4	1	261	1	1	0	1831	2729	37	9	-1	
5	1	261	1	1	1	1861	2730	7	7	25	ae
2	1	262	0	0	0	2090	2722	96	25	-1	
3	1	262	1	0	0	2090	2722	96	25	-1	
4	1	262	1	1	0	2090	2722	96	25	-1	
5	1	262	1	1	1	2090	2722	96	25	42	tle
2	1	263	0	0	0	185	2758	51	16	-1	
3	1	263	1	0	0	185	2758	51	16	-1	
4	1	263	1	1	0	185	2758	51	16	-1	
5	1	263	1	1	1	185	2767	7	7	23	7
5	1	263	1	1	2	217	2754	19	27	17	be)
2	1	264	0	0	0	1387	2717	53	41	-1	
3	1	264	1	0	0	1387	2717	53	41	-1	
4	1	264	1	1	0	1387	2717	53	41	-1	
5	1	264	1	1	1	1387	2717	53	41	27	a
2	1	265	0	0	0	210	2777	31	15	-1	
3	1	265	1	0	0	210	2777	31	15	-1	
4	1	265	1	1	0	210	2777	31	15	-1	
5	1	265	1	1	1	210	2777	31	15	3	“
2	1	266	0	0	0	180	2800	56	16	-1	
3	1	266	1	0	0	180	2800	56	16	-1	
4	1	266	1	1	0	180	2800	56	16	-1	
5	1	266	1	1	1	180	2800	56	16	22	ee
2	1	267	0	0	0	284	2795	31	27	-1	
3	1	267	1	0	0	284	2795	31	27	-1	
4	1	267	1	1	0	284	2795	31	27	-1	
5	1	267	1	1	1	284	2795	31	27	39	=)
2	1	268	0	0	0	1934	2806	33	17	-1	
3	1	268	1	0	0	1934	2806	33	17	-1	
4	1	268	1	1	0	1934	2806	33	17	-1	
5	1	268	1	1	1	1934	2806	33	17	27	ae
2	1	269	0	0	0	301	2857	22	9	-1	
3	1	269	1	0	0	301	2857	22	9	-1	
4	1	269	1	1	0	301	2857	22	9	-1	
5	1	269	1	1	1	301	2857	22	9	0	»*
2	1	270	0	0	0	1182	2811	83	49	-1	
3	1	270	1	0	0	1182	2811	83	49	-1	
4	1	270	1	1	0	1182	2811	83	49	-1	
5	1	270	1	1	1	1182	2811	83	49	58	a4
2	1	271	0	0	0	2124	2838	32	18	-1	
3	1	271	1	0	0	2124	2838	32	18	-1	
4	1	271	1	1	0	2124	2838	32	18	-1	
5	1	271	1	1	1	2144	2838	12	18	24	7
2	1	272	0	0	0	2304	2826	114	40	-1	
3	1	272	1	0	0	2304	2826	114	40	-1	
4	1	272	1	1	0	2304	2826	114	40	-1	
5	1	272	1	1	1	2304	2829	5	9	7	2
5	1	272	1	1	2	2325	2822	39	51	25	Sp
5	1	272	1	1	3	2332	2826	86	40	0	hty,
2	1	273	0	0	0	179	2844	39	32	-1	
3	1	273	1	0	0	179	2844	39	32	-1	
4	1	273	1	1	0	179	2844	39	32	-1	
5	1	273	1	1	1	179	2844	39	32	55	Es
2	1	274	0	0	0	319	2882	35	16	-1	
3	1	274	1	0	0	319	2882	35	16	-1	
4	1	274	1	1	0	319	2882	35	16	-1	
5	1	274	1	1	1	319	2882	12	15	22	yr
2	1	275	0	0	0	1433	2844	103	49	-1	
3	1	275	1	0	0	1433	2844	103	49	-1	
4	1	275	1	1	0	1433	2844	103	49	-1	
5	1	275	1	1	1	1433	2844	62	49	44	tet
5	1	275	1	1	2	1510	2844	26	49	35	ad
2	1	276	0	0	0	1659	2865	135	33	-1	
3	1	276	1	0	0	1659	2865	135	33	-1	
4	1	276	1	1	0	1659	2865	135	33	-1	
5	1	276	1	1	1	1659	2869	63	19	37	wae
5	1	276	1	1	2	1759	2865	35	33	44	_*
2	1	277	0	0	0	178	2884	51	19	-1	
3	1	277	1	0	0	178	2884	51	19	-1	
4	1	277	1	1	0	178	2884	51	19	-1	
5	1	277	1	1	1	178	2884	51	19	21	re
2	1	278	0	0	0	1549	2907	32	13	-1	
3	1	278	1	0	0	1549	2907	32	13	-1	
4	1	278	1	1	0	1549	2907	32	13	-1	
5	1	278	1	1	1	1549	2907	32	13	27	i
2	1	279	0	0	0	1863	2885	44	21	-1	
3	1	279	1	0	0	1863	2885	44	21	-1	
4	1	279	1	1	0	1863	2885	44	21	-1	
5	1	279	1	1	1	1863	2885	44	21	17	ik
2	1	280	0	0	0	196	2908	25	41	-1	
3	1	280	1	0	0	196	2908	57	41	-1	
4	1	280	1	1	0	196	2908	25	41	-1	
5	1	280	1	1	1	196	2908	25	41	0	bb
2	1	281	0	0	0	1646	2928	34	22	-1	
3	1	281	1	0	0	1646	2928	34	22	-1	
4	1	281	1	1	0	1646	2928	34	22	-1	
5	1	281	1	1	1	1646	2928	34	22	48	vg
2	1	282	0	0	0	2111	2914	54	23	-1	
3	1	282	1	0	0	2111	2914	54	23	-1	
4	1	282	1	1	0	2111	2914	54	23	-1	
5	1	282	1	1	1	2111	2917	22	20	31	to
2	1	283	0	0	0	178	2957	87	24	-1	
3	1	283	1	0	0	178	2957	87	24	-1	
4	1	283	1	1	0	178	2957	87	24	-1	
5	1	283	1	1	1	180	2953	51	38	11	han
5	1	283	1	1	2	234	2953	29	38	47	en
2	1	284	0	0	0	231	2944	38	18	-1	
3	1	284	1	0	0	231	2944	38	18	-1	
4	1	284	1	1	0	231	2944	38	18	-1	
5	1	284	1	1	1	231	2944	38	18	39	an
2	1	285	0	0	0	1629	2944	27	26	-1	
3	1	285	1	0	0	1629	2944	27	26	-1	
4	1	285	1	1	0	1629	2944	27	26	-1	
5	1	285	1	1	1	1629	2944	27	26	29	ty
2	1	286	0	0	0	2218	2925	43	43	-1	
3	1	286	1	0	0	2218	2925	44	43	-1	
4	1	286	1	1	0	2218	2925	43	43	-1	
5	1	286	1	1	1	2218	2925	43	43	10	Pas
2	1	287	0	0	0	2296	2955	57	17	-1	
3	1	287	1	0	0	2296	2955	57	17	-1	
4	1	287	1	1	0	2296	2955	57	17	-1	
5	1	287	1	1	1	2296	2955	57	17	19	Faas
2	1	288	0	0	0	181	2985	86	20	-1	
3	1	288	1	0	0	181	2985	86	20	-1	
4	1	288	1	1	0	181	2985	86	20	-1	
5	1	288	1	1	1	181	2985	86	20	57	==
2	1	289	0	0	0	321	2959	54	40	-1	
3	1	289	1	0	0	321	2959	54	40	-1	
4	1	289	1	1	0	321	2959	54	40	-1	
5	1	289	1	1	1	321	2959	54	40	32	“3
2	1	290	0	0	0	1351	2996	40	21	-1	
3	1	290	1	0	0	1351	2996	40	21	-1	
4	1	290	1	1	0	1351	2996	40	21	-1	
5	1	290	1	1	1	1351	2996	40	21	22	eS
2	1	291	0	0	0	1461	2958	164	51	-1	
3	1	291	1	0	0	1461	2958	164	51	-1	
4	1	291	1	1	0	1461	2958	164	51	-1	
5	1	291	1	1	1	1461	2958	164	51	26	2
2	1	292	0	0	0	1941	2973	48	19	-1	
3	1	292	1	0	0	1941	2973	48	19	-1	
4	1	292	1	1	0	1941	2973	48	19	-1	
5	1	292	1	1	1	1941	2973	48	19	0	*.
2	1	293	0	0	0	2136	2964	154	46	-1	
3	1	293	1	0	0	2136	2964	154	46	-1	
4	1	293	1	1	0	2136	2964	154	46	-1	
5	1	293	1	1	1	2136	2964	154	46	20	Pe
2	1	294	0	0	0	1119	3016	43	27	-1	
3	1	294	1	0	0	1119	3016	43	27	-1	
4	1	294	1	1	0	1119	3016	43	27	-1	
5	1	294	1	1	1	1119	3016	43	27	0	, z= a4 a ca a e ri Tae \/ ei 2	1	306	0	0	0	1251	3038	137	91	-1	
3	1	306	1	0	0	1251	3038	137	91	-1	
4	1	306	1	1	0	1251	3038	137	91	-1	
5	1	306	1	1	1	1251	3038	137	91	6	5
2	1	307	0	0	0	2131	3109	13	24	-1	
3	1	307	1	0	0	2131	3109	13	24	-1	
4	1	307	1	1	0	2131	3109	13	24	-1	
5	1	307	1	1	1	2131	3109	13	24	3	0
2	1	308	0	0	0	248	3087	25	53	-1	
3	1	308	1	0	0	248	3087	25	53	-1	
4	1	308	1	1	0	248	3087	25	53	-1	
5	1	308	1	1	1	248	3087	25	53	0	E
2	1	309	0	0	0	1909	3134	17	16	-1	
3	1	309	1	0	0	1909	3134	17	16	-1	
4	1	309	1	1	0	1909	3134	17	16	-1	
5	1	309	1	1	1	1909	3134	17	16	50	le
2	1	310	0	0	0	2060	3130	26	14	-1	
3	1	310	1	0	0	2060	3130	26	14	-1	
4	1	310	1	1	0	2060	3130	26	14	-1	
5	1	310	1	1	1	2068	3119	8	29	16	eS
2	1	311	0	0	0	178	3123	57	45	-1	
3	1	311	1	0	0	178	3123	57	45	-1	
4	1	311	1	1	0	178	3123	57	45	-1	
5	1	311	1	1	1	178	3123	57	45	0	eS.
2	1	312	0	0	0	181	3164	52	24	-1	
3	1	312	1	0	0	181	3164	52	24	-1	
4	1	312	1	1	0	181	3164	52	24	-1	
5	1	312	1	1	1	181	3168	5	7	32	>
2	1	313	0	0	0	1300	3165	59	21	-1	
3	1	313	1	0	0	1300	3165	59	21	-1	
4	1	313	1	1	0	1300	3165	59	21	-1	
5	1	313	1	1	1	1300	3165	59	21	41	war
2	1	314	0	0	0	1542	3177	41	11	-1	
3	1	314	1	0	0	1542	3177	41	11	-1	
4	1	314	1	1	0	1542	3177	41	11	-1	
5	1	314	1	1	1	1542	3177	41	11	34	a!
2	1	315	0	0	0	2650	3160	24	8	-1	
3	1	315	1	0	0	2650	3160	24	8	-1	
4	1	315	1	1	0	2650	3160	24	8	-1	
5	1	315	1	1	1	2650	3161	4	7	0	wZ
2	1	316	0	0	0	2701	3178	15	10	-1	
3	1	316	1	0	0	2701	3178	15	10	-1	
4	1	316	1	1	0	2701	3178	15	10	-1	
5	1	316	1	1	1	2701	3178	15	10	24	ao
2	1	317	0	0	0	2777	3085	154	85	-1	
3	1	317	1	0	0	2777	3085	155	85	-1	
4	1	317	1	1	0	2777	3085	154	85	-1	
5	1	317	1	1	1	2777	3148	8	8	0	-
5	1	317	1	1	2	2828	3085	103	85	26	ov
2	1	318	0	0	0	937	3203	50	17	-1	
3	1	318	1	0	0	937	3203	50	17	-1	
4	1	318	1	1	0	937	3203	50	17	-1	
5	1	318	1	1	1	937	3203	50	17	10	a.
2	1	319	0	0	0	1895	3153	63	64	-1	
3	1	319	1	0	0	1895	3153	63	64	-1	
4	1	319	1	1	0	1895	3153	63	64	-1	
5	1	319	1	1	1	1895	3153	63	64	8	£3
2	1	320	0	0	0	1981	3197	32	24	-1	
3	1	320	1	0	0	1981	3197	32	24	-1	
4	1	320	1	1	0	1981	3197	32	24	-1	
5	1	320	1	1	1	1981	3197	32	24	42	sy
2	1	321	0	0	0	2310	3204	55	14	-1	
3	1	321	1	0	0	2310	3204	55	14	-1	
4	1	321	1	1	0	2310	3204	55	14	-1	
5	1	321	1	1	1	2310	3204	55	14	24	Lae
2	1	322	0	0	0	2460	3208	32	10	-1	
3	1	322	1	0	0	2460	3208	32	10	-1	
4	1	322	1	1	0	2460	3208	32	10	-1	
5	1	322	1	1	1	2460	3208	32	10	28	<
2	1	323	0	0	0	667	3210	18	24	-1	
3	1	323	1	0	0	667	3210	18	24	-1	
4	1	323	1	1	0	667	3210	18	24	-1	
5	1	323	1	1	1	667	3210	18	24	29	in
2	1	324	0	0	0	1388	3144	103	88	-1	
3	1	324	1	0	0	1388	3144	103	88	-1	
4	1	324	1	1	0	1388	3144	103	88	-1	
5	1	324	1	1	1	1388	3144	103	88	49	a
2	1	325	0	0	0	2070	3233	27	7	-1	
3	1	325	1	0	0	2070	3233	27	7	-1	
4	1	325	1	1	0	2070	3233	27	7	-1	
5	1	325	1	1	1	2070	3233	9	6	16	ai
2	1	326	0	0	0	2197	3227	30	17	-1	
3	1	326	1	0	0	2197	3227	30	17	-1	
4	1	326	1	1	0	2197	3227	30	17	-1	
5	1	326	1	1	1	2197	3227	30	17	28	Pas
2	1	327	0	0	0	2776	3208	31	17	-1	
3	1	327	1	0	0	2776	3208	31	17	-1	
4	1	327	1	1	0	2776	3208	31	17	-1	
5	1	327	1	1	1	2776	3208	31	17	49	7)
2	1	328	0	0	0	3000	3204	69	27	-1	
3	1	328	1	0	0	3000	3204	69	27	-1	
4	1	328	1	1	0	3000	3204	69	27	-1	
5	1	328	1	1	1	3023	3200	21	41	54	ee
2	1	329	0	0	0	178	3243	42	20	-1	
3	1	329	1	0	0	178	3243	42	20	-1	
4	1	329	1	1	0	178	3243	42	20	-1	
5	1	329	1	1	1	174	3239	6	35	28	|
5	1	329	1	1	2	178	3243	42	20	7	eh
2	1	330	0	0	0	1018	3239	36	29	-1	
3	1	330	1	0	0	1018	3239	36	29	-1	
4	1	330	1	1	0	1018	3239	36	29	-1	
5	1	330	1	1	1	1018	3239	36	29	33	Yj
2	1	331	0	0	0	1538	3229	45	28	-1	
3	1	331	1	0	0	1538	3229	45	28	-1	
4	1	331	1	1	0	1538	3229	45	28	-1	
5	1	331	1	1	1	1538	3229	45	28	16	«J
2	1	332	0	0	0	2019	3257	37	15	-1	
3	1	332	1	0	0	2019	3257	37	15	-1	
4	1	332	1	1	0	2019	3257	37	15	-1	
5	1	332	1	1	1	2019	3257	37	15	46	wre
2	1	333	0	0	0	2371	3252	89	30	-1	
3	1	333	1	0	0	2371	3252	89	30	-1	
4	1	333	1	1	0	2371	3252	89	30	-1	
5	1	333	1	1	1	2371	3252	15	30	0	r.
5	1	333	1	1	2	2451	3257	9	15	0	A
2	1	334	0	0	0	2813	3240	60	22	-1	
3	1	334	1	0	0	2813	3240	60	22	-1	
4	1	334	1	1	0	2813	3240	60	22	-1	
5	1	334	1	1	1	2813	3240	60	22	28	ae
2	1	335	0	0	0	247	3268	98	39	-1	
3	1	335	1	0	0	247	3268	98	39	-1	
4	1	335	1	1	0	247	3268	98	39	-1	
5	1	335	1	1	1	247	3268	98	39	18	ee
2	1	336	0	0	0	1349	3267	57	18	-1	
3	1	336	1	0	0	1349	3267	57	18	-1	
4	1	336	1	1	0	1349	3267	57	18	-1	
5	1	336	1	1	1	1349	3267	57	18	28	~~
5	1	336	1	1	2	1390	3259	20	30	5	=
2	1	337	0	0	0	2031	3277	52	27	-1	
3	1	337	1	0	0	2031	3277	52	27	-1	
4	1	337	1	1	0	2031	3277	52	27	-1	
5	1	337	1	1	1	2031	3277	52	27	0	ey?
2	1	338	0	0	0	2778	3287	44	7	-1	
3	1	338	1	0	0	2778	3287	44	7	-1	
4	1	338	1	1	0	2778	3287	44	7	-1	
5	1	338	1	1	1	2778	3287	44	7	34	y+
2	1	339	0	0	0	193	3296	25	24	-1	
3	1	339	1	0	0	193	3296	25	24	-1	
4	1	339	1	1	0	193	3296	25	24	-1	
5	1	339	1	1	1	193	3296	25	24	42	3
2	1	340	0	0	0	1017	3285	34	42	-1	
3	1	340	1	0	0	1017	3285	34	42	-1	
4	1	340	1	1	0	1017	3285	34	42	-1	
5	1	340	1	1	1	1017	3285	34	42	0	‘'
2	1	341	0	0	0	1443	3276	190	59	-1	
3	1	341	1	0	0	1443	3276	190	59	-1	
4	1	341	1	1	0	1443	3276	190	59	-1	
5	1	341	1	1	1	1443	3276	190	59	18	ae
2	1	342	0	0	0	1875	3267	104	62	-1	
3	1	342	1	0	0	1875	3267	104	62	-1	
4	1	342	1	1	0	1875	3267	104	62	-1	
5	1	342	1	1	1	1875	3267	104	62	2	cd
2	1	343	0	0	0	178	3333	15	13	-1	
3	1	343	1	0	0	178	3333	15	13	-1	
4	1	343	1	1	0	178	3333	15	13	-1	
5	1	343	1	1	1	178	3333	15	13	15	int
2	1	344	0	0	0	1742	3339	63	24	-1	
3	1	344	1	0	0	1742	3339	63	24	-1	
4	1	344	1	1	0	1742	3339	63	24	-1	
5	1	344	1	1	1	1742	3339	63	24	14	a
2	1	345	0	0	0	2818	3319	61	38	-1	
3	1	345	1	0	0	2818	3319	61	38	-1	
4	1	345	1	1	0	2818	3319	61	38	-1	
5	1	345	1	1	1	2818	3319	61	38	14	ie
2	1	346	0	0	0	181	3351	33	25	-1	
3	1	346	1	0	0	181	3351	33	25	-1	
4	1	346	1	1	0	181	3351	33	25	-1	
5	1	346	1	1	1	181	3351	33	25	31	and
2	1	347	0	0	0	1437	3329	92	40	-1	
3	1	347	1	0	0	1437	3329	92	40	-1	
4	1	347	1	1	0	1437	3329	92	40	-1	
5	1	347	1	1	1	1437	3329	92	40	25	ae
2	1	348	0	0	0	1671	3378	41	14	-1	
3	1	348	1	0	0	1671	3378	41	14	-1	
4	1	348	1	1	0	1671	3378	41	14	-1	
5	1	348	1	1	1	1671	3378	41	14	22	ae
2	1	349	0	0	0	1961	3337	140	47	-1	
3	1	349	1	0	0	1961	3337	140	47	-1	
4	1	349	1	1	0	1961	3337	140	47	-1	
5	1	349	1	1	1	1961	3337	140	47	28	oe!
2	1	350	0	0	0	2741	3363	27	10	-1	
3	1	350	1	0	0	2741	3363	27	10	-1	
4	1	350	1	1	0	2741	3363	27	10	-1	
5	1	350	1	1	1	2741	3363	27	10	17	es
2	1	351	0	0	0	2932	3339	61	28	-1	
3	1	351	1	0	0	2932	3339	61	28	-1	
4	1	351	1	1	0	2932	3339	61	28	-1	
5	1	351	1	1	1	2932	3351	15	16	10	Pe
2	1	352	0	0	0	306	3386	29	17	-1	
3	1	352	1	0	0	306	3386	29	17	-1	
4	1	352	1	1	0	306	3386	29	17	-1	
5	1	352	1	1	1	306	3386	29	17	47	3
2	1	353	0	0	0	1245	3414	38	10	-1	
3	1	353	1	0	0	1245	3414	38	10	-1	
4	1	353	1	1	0	1245	3414	38	10	-1	
5	1	353	1	1	1	1271	3417	12	7	0	=
2	1	354	0	0	0	1658	3400	37	19	-1	
3	1	354	1	0	0	1658	3400	37	19	-1	
4	1	354	1	1	0	1658	3400	37	19	-1	
5	1	354	1	1	1	1658	3400	37	19	8	Bia
2	1	355	0	0	0	1717	3381	73	44	-1	
3	1	355	1	0	0	1717	3381	73	44	-1	
4	1	355	1	1	0	1717	3381	73	44	-1	
5	1	355	1	1	1	1717	3381	73	44	11	Psy
2	1	356	0	0	0	178	3401	24	63	-1	
3	1	356	1	0	0	178	3401	24	63	-1	
4	1	356	1	1	0	178	3401	24	63	-1	
5	1	356	1	1	1	178	3401	24	63	34	H
2	1	357	0	0	0	1573	3445	43	19	-1	
3	1	357	1	0	0	1573	3445	43	19	-1	
4	1	357	1	1	0	1573	3445	43	19	-1	
5	1	357	1	1	1	1573	3445	43	19	71	4
2	1	358	0	0	0	1680	3426	82	50	-1	
3	1	358	1	0	0	1680	3426	82	50	-1	
4	1	358	1	1	0	1680	3426	82	50	-1	
5	1	358	1	1	1	1680	3426	63	50	31	Lon
5	1	358	1	1	2	1752	3455	10	7	0	~
2	1	359	0	0	0	1565	3468	74	35	-1	
3	1	359	1	0	0	1565	3468	74	35	-1	
4	1	359	1	1	0	1565	3468	74	35	-1	
5	1	359	1	1	1	1565	3468	74	35	19	Fae
2	1	360	0	0	0	1931	3491	22	9	-1	
3	1	360	1	0	0	1931	3491	22	9	-1	
4	1	360	1	1	0	1931	3491	22	9	-1	
5	1	360	1	1	1	1931	3491	22	9	6	an
2	1	361	0	0	0	2769	3469	42	26	-1	
3	1	361	1	0	0	2769	3469	42	26	-1	
4	1	361	1	1	0	2769	3469	42	26	-1	
5	1	361	1	1	1	2769	3469	42	26	22	Td
2	1	362	0	0	0	396	3485	45	47	-1	
3	1	362	1	0	0	396	3485	45	47	-1	
4	1	362	1	1	0	396	3485	45	47	-1	
5	1	362	1	1	1	401	3480	29	56	7	re
2	1	363	0	0	0	1720	3514	26	22	-1	
3	1	363	1	0	0	1720	3514	26	22	-1	
4	1	363	1	1	0	1720	3514	26	22	-1	
5	1	363	1	1	1	1720	3514	26	22	0	*y
2	1	364	0	0	0	1409	3538	69	24	-1	
3	1	364	1	0	0	1409	3538	69	24	-1	
4	1	364	1	1	0	1409	3538	69	24	-1	
5	1	364	1	1	1	1409	3538	18	24	10	vs
5	1	364	1	1	2	1457	3543	21	12	91	~
2	1	365	0	0	0	2849	3551	40	11	-1	
3	1	365	1	0	0	2849	3551	40	11	-1	
4	1	365	1	1	0	2849	3551	40	11	-1	
5	1	365	1	1	1	2849	3551	40	11	35	i
2	1	366	0	0	0	1597	3568	52	29	-1	
3	1	366	1	0	0	1597	3568	52	29	-1	
4	1	366	1	1	0	1597	3568	52	29	-1	
5	1	366	1	1	1	1597	3568	52	29	23	Beda
2	1	367	0	0	0	1381	3594	42	10	-1	
3	1	367	1	0	0	1381	3594	42	10	-1	
4	1	367	1	1	0	1381	3594	42	10	-1	
5	1	367	1	1	1	1381	3594	42	10	9	~-+
2	1	368	0	0	0	2653	3587	45	14	-1	
3	1	368	1	0	0	2653	3587	45	14	-1	
4	1	368	1	1	0	2653	3587	45	14	-1	
5	1	368	1	1	1	2653	3587	45	14	62	fue
2	1	369	0	0	0	1358	3610	58	21	-1	
3	1	369	1	0	0	1358	3610	58	21	-1	
4	1	369	1	1	0	1358	3610	58	21	-1	
5	1	369	1	1	1	1358	3610	25	12	0	~
5	1	369	1	1	2	1393	3611	23	20	48	>
2	1	370	0	0	0	1592	3647	54	29	-1	
3	1	370	1	0	0	1592	3647	54	29	-1	
4	1	370	1	1	0	1592	3647	54	29	-1	
5	1	370	1	1	1	1588	3643	24	47	23	ne
2	1	371	0	0	0	1180	3664	39	27	-1	
3	1	371	1	0	0	1180	3664	39	27	-1	
4	1	371	1	1	0	1180	3664	39	27	-1	
5	1	371	1	1	1	1180	3664	39	27	17	m2
2	1	372	0	0	0	1230	3658	74	52	-1	
3	1	372	1	0	0	1230	3658	74	52	-1	
4	1	372	1	1	0	1230	3658	74	52	-1	
5	1	372	1	1	1	1230	3673	18	33	34	7
5	1	372	1	1	2	1247	3658	57	52	30	ed
2	1	373	0	0	0	1463	3707	45	16	-1	
3	1	373	1	0	0	1463	3707	45	16	-1	
4	1	373	1	1	0	1463	3707	45	16	-1	
5	1	373	1	1	1	1463	3707	45	16	43	ad
2	1	374	0	0	0	2054	3707	32	13	-1	
3	1	374	1	0	0	2054	3707	32	13	-1	
4	1	374	1	1	0	2054	3707	32	13	-1	
5	1	374	1	1	1	2054	3707	32	13	35	my.
2	1	375	0	0	0	1621	3753	25	17	-1	
3	1	375	1	0	0	1621	3753	25	17	-1	
4	1	375	1	1	0	1621	3753	25	17	-1	
5	1	375	1	1	1	1621	3753	25	17	13	+.
2	1	376	0	0	0	1016	3667	138	114	-1	
3	1	376	1	0	0	1016	3667	138	114	-1	
4	1	376	1	1	0	1016	3667	138	114	-1	
5	1	376	1	1	1	1016	3667	138	114	10	€
2	1	377	0	0	0	1016	3795	29	30	-1	
3	1	377	1	0	0	1016	3795	29	30	-1	
4	1	377	1	1	0	1016	3795	29	30	-1	
5	1	377	1	1	1	1016	3795	29	30	0	rr
2	1	378	0	0	0	1484	3808	22	14	-1	
3	1	378	1	0	0	1484	3808	22	14	-1	
4	1	378	1	1	0	1484	3808	22	14	-1	
5	1	378	1	1	1	1484	3808	22	14	0	-
2	1	379	0	0	0	1722	3786	51	26	-1	
3	1	379	1	0	0	1722	3786	51	26	-1	
4	1	379	1	1	0	1722	3786	51	26	-1	
5	1	379	1	1	1	1722	3788	23	24	0	r
5	1	379	1	1	2	1758	3786	15	16	44	+
2	1	380	0	0	0	2741	3834	18	14	-1	
3	1	380	1	0	0	2741	3834	18	14	-1	
4	1	380	1	1	0	2741	3834	18	14	-1	
5	1	380	1	1	1	2741	3834	18	14	34	bh
2	1	381	0	0	0	2752	3820	18	18	-1	
3	1	381	1	0	0	2752	3820	18	18	-1	
4	1	381	1	1	0	2752	3820	18	18	-1	
5	1	381	1	1	1	2752	3820	18	18	19	4 e° Salad es UN PS a ae , ae Fe y = —— Fee a rl a rr. ca ms J = » “We ed oa og © he) iit ioe \3 ed ie = ey AX a = 7% ae | — a $< ce = a _ PI ¥ AY ee - a “7 i: ra = & s ee oa — as a --* = bat ad “ yl we I Fs “ff Z Sd hee" i > Pe Re ae - Pe ra) . — 4° syes a afi a ns e ry. swe es a P A oo ~) = z eos ‘Aas —— 7, -—— Ps 4 _——— w a7 ss Noosa Council Annual Report 24/25

Section 8

Discover                                                                                                                        Our Location
Located in South-East Queensland, Noosa Shire is                  areas. It is made up of 18 hinterland villages and 11
situated at the northern tip of Queensland’s Sunshine             coastal towns and has an economy that is diversifying
Coast and it is approximately 120 kilometres north of             beyond a thriving tourism industry. Noosa’s economy
Brisbane. Noosa Shire covers an area of 869.9 km²                 relies significantly on the health, professional services,
with more than 800 kilometres of roads and nearly                 tourism, retail and construction sectors. It is home to
450 kilometres of bikeways. The region is bound by                more than 7,000 businesses, predominately small and
the Gympie local government area in the north and                 micro, including successful entrepreneurs and skilled
west, and the Sunshine Coast local government area                business people.
in the south.
                                                                                                                                                  Kin Kin
                                                                  It is the natural landscape that attracts visitors to Noosa
Noosa Shire is home to more than 56,000 people.                   Shire. The coastal landform of shallow lakes, river
                                                                                                                                                                                                            Teewah
The region enjoys a sub-tropical climate, beautiful               systems and coastal escarpment provide a stunning                                                            Boreen Point
beaches, mountains and forests, which makes it one of             backdrop to our community. Noosa Shire has a proud




                                                                                                                                                                                                                                       Noosa Council Annual Report 24/25
Australia’s most desirable places to live, work and visit.        history of preserving its natural environment with 35%
                                                                  of the Shire protected as either national park, reserve
The traditional owners and original custodians of the             or conservation area.
land are the Kabi Kabi people. The Kabi Kabi First                                                                              Cooran

Nation covers over 11,500 km² of Country up along                 Since 2007, the Noosa Shire has held UNESCO
the Sunshine Coast from north of Brisbane to the                  Biosphere Reserve status. It recognises the ongoing
Gregory and Isis Rivers south of Bundaberg. Kabi                  efforts of the Noosa community to manage the                           Pomona
Kabi land takes in the eastern part of the coastal                region’s land, waters and wildlife sustainably, in
ranges including the volcanic Glasshouse Mountains                balance with its urban population and visitors from
and the great Mary River valley which flows from the              across the globe. Together, with more than 700                                                                              Tewantin          Noosa Heads
Conondale Ranges to the sea near Maryborough.                     biosphere reserves around the world, we are working
                                                                                                                                                                                                         Noosaville
                                                                  towards the global sustainability goals of the Man and
Noosa Shire is a growing residential and tourist area,            the Biosphere Program and Lima Action Plan.                                               Cooroy                                                    Sunshine Beach

with substantial rural, rural-residential and parkland
                                                                                                                                                                                                                      Sunrise Beach



                                                                                                                                                                                                                Marcus Beach

                                                                                                                                                                                                             Peregian Beach



                                                                                                                                                                          N



                                                                                                                                                            QLD   Noosa               0        2.5km


                                                                                                                                                                          Noosa Council boundary




                                                             14                                                                                                           15

Section 9

Shire Facts

         Area and landscape                            Rivers catchment cover                       Households                             Employment and industry




                                                                                                   23,755                                 $4.02 Billion
   872km2                      45km
                               Coastline
                                                                       Mary River   36%                                                          Gross Regional Product
        Total area                                                                                    Households
        of the Shire



                                                63%      Noosa River                               $1,482                                         28,965
                                                                                                                                                  Employed residents




                                                                                                                                                                          Noosa Council Annual Report 24/25
   >70%          216km²     56km²                                             1%                Median household income
   Vegetated     National   State
   area          Park       Forest
                                                                          Maroochy River
                                                                                                    $880                                          28,686
                                                                                                                                                       Local jobs
                                     Population                                                   Median house rental




                                                                                                $1,350,000                                          7,965
                                                                                                                                                    Local businesses
                                                                                                  Median house price


                                                                              of residence

                                 59,274
                                                                              identify as                                 Health and wellbeing
 Median age     50                                                 1.5%       Aboriginal
                                 Resident population                          and/or Torres
                                                                              Strait Islander      Largest sector employer                           Liveability



                                                                                                  Health Care and
                                                                                                 Social Assistance                               Index Score 70



                                           16                                                                                      17

Section 10

Kabi Kabi Commitment



On 19 September 2024, Council signed                 Country, protecting, sustainably managing,
a historic commitment to sustainable                 and regenerating natural systems that we


                                                                                                         Environment
custodianship of the lands and waters of             rely on for healthy food, clean water, fresh air,
Noosa, in partnership with Kabi Kabi People’s        medicine, culture, shelter and recreation.
Aboriginal Corporation (KKPAC).
                                                     This Commitment between Noosa Council
As part of the world’s oldest continuing             and the Kabi Kabi People acknowledges
culture, the Kabi Kabi have been living              Noosa’s First Nations people and their deep
sustainably in the Noosa Shire for over              cultural and spiritual connection to the            We are committed to protecting and enhancing Noosa’s
30,000 years, caring for the lands and waters        natural systems that sustain us.                    environmental assets and our Biosphere. Our flora and fauna,
that we all call home.                                                                                   oceans and coasts, waterways and wetlands, atmosphere
                                                     The Kabi Kabi Commitment is available for           and climate are all highly valued for both their intrinsic worth
Kabi Kabi Peoples’ relationship with the land        view on Council’s website.                          and the ecosystem services they provide. Noosa’s diverse
is based on the notion for custodianship of                                                              ecosystems attract people to live, work, invest and play in the
                                                                                                         Shire. The evolution and advancement of the Noosa Design




                                                                                                                                                                            Noosa Council Annual Report 24/25
                                                                                                         Principles and The Noosa Planning Scheme helps ensure
                                                                                                         our built environment responds sensitively to our natural
                                                                                                         environment, climate, cultural heritage and enhances the
                                                                                                         liveability of the community.


                                                                                                         The principles of ecologically sustainable development
                                                                                                         are integrated into decision making to help secure the
                                                                                                         continued availability of natural resources for present
                                                                                                         and future generations. Careful management of growth
                                                                                                         and development are underpinned by a commitment to
                                                                                                         maintaining a sustainable population. Our development
                                                                                                         footprint is limited by the need to protect significant
                                                                                                         environmental values, avoid natural hazards, provide
                                                                                                         necessary infrastructure and preserve the desired lifestyle.
                                                                                                         This approach is intrinsic to our Biosphere and the key to
                                                                                                         Noosa’s success.




                                                18                                                                                        19

Section 11

     Liveability
     People highly value Noosa’s unique lifestyle which balances
     health, wellbeing, recreation and opportunity within our
     renowned natural and built environment. Our residents enjoy
     the benefit of towns, villages, and rural areas with distinct
     characteristics. They live within a connected, supportive,
     and inclusive community linked by shared values. People’s
     individual needs are assisted through appropriate services




                                                                        Noosa Council Annual Report 24/25
     and infrastructure to maximise wellbeing and resilience.
     Council’s objective is to retain and enhance these aspects
     that underpin our prized lifestyle.


     Our thriving community, arts, cultural, sporting and leisure
     sectors facilitate a rich community life.


     A diverse range of services, facilities and amenities are well
     maintained and accessible to cater for our broad range
     of community needs, regardless of age, ability, or budget.
     Our aim is to maintain and improve these into the future.
     Council is proactively seeking to address the housing crisis
     in our community and manage impacts on liveability, with an
     increase in resourcing, commitment, and investment. Council
     cannot do this alone and will look to partner with all levels of
     government, industry, and the housing sector to create an
     inclusive Noosa community where everybody has access to
     safe, secure housing they can afford. Noosa Shire is striving
     to have an efficient, free flowing, innovative transport system
     that enhances resident and visitor experiences, and results in
     sustainable environmental outcomes. Our movement system
     facilitates the movement of people and goods – it prioritises
     pedestrians, cyclists, and public transport rather than cars.




20                                    21

Section 12

     Prosperity
     Council is committed to a robust, diverse, and resilient
     local economy that recognises the importance of skilled
     and talented people; has the necessary infrastructure to
     accelerate employment growth; supports the sustainability
     of businesses, industries and technologies; and creates a
     sustainable business environment that provides a range of
     diverse employment opportunities.




                                                                      Noosa Council Annual Report 24/25
     Our artisan and niche industries form a small but important
     part of our visitor economy. Building on our emerging
     local food and drink industry and our established arts and
     cultural sector is key to creating an authentic experience for
     residents and visitors alike.


     The success of our economy is driven by our reputation for
     ecological sustainability and nature conservation, and this
     attracts green business opportunities that provide innovative
     solutions to climate risk and biodiversity protection. We are
     focused on our economy transitioning to a more circular
     economy, focused on reducing, re-using and recycling the
     valuable resources through progressive waste management
     practices.




22                                   23

Section 13

24
25




     Noosa Council Annual Report 24/25

aa x4 Ae a mi F ig + 0 BA r\ =! ie 3 iat W ne 4 ‘ Fe aH i! | | a B ! Tale sant iA | ) i} Vi ni sy yd i “if s / § i . i B 7 : a Wa ra a os ay : i , a} 174 P _—— ff cf We ‘bd See es G i} MH By 83 er yee a r = tha! fi —-a Ome =! s ss ba ai pow re ay X 4 a Ik a nN ite aaa Fi g a 4 | 49 8 | A | eae } r A | 5 a iv v a f ) a Wt a | Ly he Noosa Council Annual Report 24/25

Section 14

Elected Members                                                                                                           Mayor Frank Wilkie
                                                                                                                          Elected member since 2014
                                                                                                                          07 5329 6103
                                                                                                                          [email protected]
Elected members (councillors) are members of a                  As well as being a Councillor, the Mayor has additional
team, elected by their constituents to work collectively        responsibilities for:
in the best interests of the whole community.
                                                                                                                          Cr Brian Stockwell (Deputy Mayor)
                                                                — leading and managing meetings of the
                                                                                                                          Elected member since 2016
Our Council is represented by the Mayor and                       local government at which the Mayor is the
                                                                                                                          07 5329 6120
six Councillors who were elected at the Local                     Chairperson, including managing the conduct of
                                                                                                                          [email protected]
Government elections held on 16 March 2024 and                    the participants at the meetings
made Declarations of Office on 3 April 2024.                    — leading, managing and providing strategic
                                                                  direction to the Chief Executive Officer (CEO) in
Residents have the opportunity to elect the Mayor                 order to achieve the high quality administration of     Cr Karen Finzel
and the Councillors every four years with the next                the local government                                    Elected member since 2020
election scheduled to be held in 2028.                          —d  irecting the CEO in accordance with local            07 5329 6279
                                                                  government policies                                     [email protected]
Our Councillors represent all areas of the Shire as             —c  onducting a performance appraisal of the CEO




                                                                                                                                                              Noosa Council Annual Report 24/25
Noosa is an undivided local government area.                      at least annually in a manner determined by the
                                                                  local government                                        Cr Nicola Wilson
Elected members have specific roles and                         —e  nsuring the local government promptly provides       Elected member since 2024
responsibilities to ensure that they have effective               the Minister with the information about the local       07 5329 6115
control over the management and operation of our                  government area, or the local government as             [email protected]
local government area. Councillors are responsible for:           requested
                                                                —b  eing a member of each standing committee of
—p
  roviding leadership to the local government and                the local government, and
                                                                                                                          Cr Amelia Lorentson
 the community                                                  — r epresenting the local government at ceremonial
                                                                                                                          Elected member since 2020
—p
  lanning for the delivery of services and strategic             or civic functions.
                                                                                                                          07 5329 6385
 planning for the future
                                                                                                                          [email protected]
—e
  nsuring Council discharges its responsibilities              The Councillor that is nominated by resolution to be
 under legislation, achieves its Corporate Plan,                the Deputy Mayor can act for the Mayor during an
 and complies with all laws that apply to local                 absence or temporary incapacity of the Mayor.
 governments                                                                                                              Cr Tom Wegener
—b
  eing accountable to the community for the local              The roles and responsibilities of our elected             Elected member since 2020
 government’s performance                                       members are underpinned by the Code of Conduct            07 5329 6545
—p
  articipating in Council meetings and decision-               for Councillors in Queensland which is a public           [email protected]
 making for the benefit of our local government area            declaration of the principles of good conduct and
—d
  eveloping policy and making local laws, and                  standards of behaviour that councillors must display
—c
  omplying with legislation.                                   when carrying out their duties.                           Cr Jessica Phillips
                                                                                                                          Elected member since 2024
                                                                                                                          07 5329 6109
                                                                                                                          [email protected]




                                                           26                                                                   27

Section 15

     Services
     Council delivers a wide and varied range of services to our
     community. Service activities are supported by service
     level targets captured in Council’s Service Level Catalogue,
     which is adopted through the budget process and is
     available on our website. The Service Catalogue currently
     lists 36 Service Profiles covering external and internal
     services:




                                                                    Noosa Council Annual Report 24/25
     —E  xternal services are those services which deliver
       specific outcomes to customers, stakeholders, and
       the community (e.g., Aged and Disability Support,
       Development Services and Economic Development).
     — Internal Services are those of a more corporate nature
       that enable the delivery of external services (e.g.,
       Procurement, Information Communication Technology,
       Financial & Revenue Services).




28                                  29

Section 16

Services                                         Service Activity                               Services                    Service Activity
Aged & Disability Support (Noosa Seniors)        Day Respite Centre operations and programs     Disaster Management         Disaster Planning / Preparedness
                                                 In-home Care                                                               Disaster Co-ordination
                                                 Home Maintenance and Modifications                                         Disaster Response
                                                 Transport                                                                  Disaster Recovery
                                                 Information Sessions

                                                                                                Economic Development        Strategy and Service Delivery
Asset Management                                 Asset Management                               & Destination Management    Capacity Building and Leadership
                                                                                                                            Communications and Information
                                                                                                                            Tourism Noosa support
Beaches and Coastal Foreshores                   Maintenance and Operations
                                                                                                                            Noosa Junction Association support


Canals and Waterways                             Waterways Management
                                                                                                Elected Council             Elections
                                                 Maintenance and Operations
                                                                                                                            Meetings
                                                                                                                            Councillor Support and Registers
Cemeteries                                       Maintenance and Operations




                                                                                                                                                                                        Noosa Council Annual Report 24/25
                                                                                                Financial                   Financial Accounting
Community Development                            Community Development – Planning and Support                               Treasury and Investment Management
                                                 Community Buildings and Facilities                                         Management Accounting
                                                                                                                            Capital Project Financial Management and Asset
                                                                                                                            Accounting
Customer Service                                 Customer Contact
                                                                                                                            Accounts Payable
                                                 Cashiering

                                                                                                Revenue                     Property Records Management
Council Buildings                                Maintenance
                                                                                                                            Property Rates and Charges
                                                                                                                            Property Searches
Council Property Management                      Council Property Management                                                Receipting
                                                                                                                            Accounts Receivable and Debt Recovery

Arts and Culture                                 Cultural Planning and Support
                                                 Visual Arts Venues and Programs                Fleet                       Fleet Management
                                                 The J Entertainment and Community Venue                                    Fleet Operations
                                                 Heritage Protection and Preservation
                                                 Libraries                                      Governance                  Corporate Governance Framework
                                                                                                                            Enterprise Risk and Opportunity Management
Development                                      Development Assessment and Compliance                                      Insurance Management
                                                 Building and Pool Compliance                                               Complaints Management
                                                 Plumbing                                                                   Right to Information & Information Privacy
                                                                                                                            Public Interest Disclosures, Fraud and Corruption Control
                                                                                                                            Delegations and Authorisations




                                            30                                                                             31

Section 17

Services                             Service Activity                                  Services                         Service Activity
Holiday Parks                        Contract Management and Administration            Public Health                    Food Premises
                                     Operations                                                                         Infection Control for Personal Appearance Services
                                                                                                                        Mosquito and Vermin Control
                                                                                                                        Environmental Health Issues
Information Communication            ERP System
                                                                                                                        General Public Health Compliance
Technology (ICT)                     ICT Operations
                                     Records and Data Management
                                     Spatial Services                                  Public Lighting                  Maintenance and Operations


Infrastructure Planning              Infrastructure Planning                           Recreational Parks               Maintenance and Operations
Design Delivery                      Infrastructure Design
                                     Infrastructure Delivery
                                                                                       Road Network                     Sealed Roads
                                                                                                                        Gravel Roads
Land and Habitat Conservation        Bushland Reserve Management                                                        Bridges
                                     Environmental Partnership Programs                                                 Road Landscaping and Mowing
                                     Pest Management                                                                    Car Parks




                                                                                                                                                                                Noosa Council Annual Report 24/25
                                     Environmental Management Services

                                                                                       Sport and Recreation             Planning, Programs and Support
Lifeguards                           Maintenance and Operations                                                         Community Swimming Pools
                                     Support Services                                                                   Noosa Leisure Centre


Local Laws & Public Safety           Local Laws Education & Compliance                 Stormwater Drainage              Stormwater System Maintenance and Operations
                                     Public Security – Security Patrols and CCTV       and Flood Mitigation             Flood Alert and Mitigation Maintenance and Operations
                                     Permits – Use of Public Land for Commercial and
                                     Community Activities
                                                                                       Strategy                         Planning Scheme
                                                                                                                        Advocacy, Place and Housing Programs
Pathways, Boardwalks                 Pathways and Boardwalks                                                            Sustainability and Climate Change
& Recreational Trails                Noosa Trail Network

                                                                                       Traffic and Transport            Traffic Management and Operations
People & Culture                     Human Resource Management and Advisory Services                                    Public Transport Infrastructure and Programs
                                     Payroll                                                                            Noosa North Shore Ferry
                                     Workplace Health and Safety

                                                                                       Waste and Resource Management    Waste Collections
Procurement                          Procurement Strategy and Governance                                                Waste Disposal
                                     Procurement Operations                                                             Waste Resource Recovery and Education


Public Amenities                     Maintenance and Operations




                                32                                                                                     33

Section 18

                                                                                      Customer Service
Service Locations
                                                                                      Council is committed to providing excellent customer           Customers can seek our assistance online, over
We work from various service locations.                                               service to its community.                                      the phone, in person, by email or letter. A consistent
                                                                                                                                                     approach to customer service means we attend to
Administrative Offices                                                                Our Customer Service Charter describes Council’s               enquiries accurately, promptly, and professionally.
                                                                                      customer-centric approach and the standards our
Main Office - 9 Pelican Street, Tewantin                                              community can expect when engaging with Council.               Council’s Pulse Survey allows our customers to rate
Pelican Place – 3 Pelican Street, Tewantin                                                                                                           their customer service experience with Council out
Goodchap Office - 90 Goodchap Street, Noosaville                                      During all interactions, we are committed to:                  of five stars. For this period, Council achieved an
                                                                                       — Considering customers’ needs first                          Average Rating score of 4.87 which is an increase of
Cooroy Library Customer Service Desk                                                   — Focusing on continuous service improvement                  0.06 from previous financial year.
                                                                                       — Promoting opportunities for participation
9 Maple Street, Cooroy, Phone: 5329 6555                                               — Achieving high levels of customer satisfaction
                                                                                       — Optimising ‘value for money’ for our community
Libraries                                                                              — Respecting your privacy by treating all information
                                                                                          you provide confidentially and in accordance with
Noosaville Library - 7 Wallace Drive, Noosaville, Phone: 5329 6555                        the Information Privacy Act 2009, and




                                                                                                                                                                                                              Noosa Council Annual Report 24/25
Cooroy Library - 9 Maple Street, Cooroy, Phone: 5329 6555                              — Consulting with the community on major issues
Mobile Library – various locations                                                        that may affect them.


Arts and Culture

                                                                                         Customer Service Interactions
Noosa Regional Gallery – Riverside, 9 Pelican Street, Tewantin
Butter Factory Arts Centre – 11A Maple Street, Cooroy                                    Customer service requests created                              28,489
The J – 60 Noosa Drive, Noosa Junction
Peregian Beach Community House – 5 – 7 Rufous Street, Peregian Beach                     Front counter interactions                                     9,199


Innovation                                                                               Online chat interactions                                       2,326

                                                                                         Inbound calls to Council                                       44,285
Peregian Digital Hub – 253 – 255 David Low Way, Peregian Beach
                                                                                         Top three requests raised by customers                         1. Domestic bin waste
Works Depot                                                                                                                                             2. Roads
                                                                                                                                                        3. Trees
Noosaville Depot – 183 Eumundi Noosa Road, Noosaville


Waste and Resource Recovery Centres


Noosa Resource Recovery Centre – 561 Eumundi Noosa Road, Doonan
Cooroy Waste Transfer Station – Mary River Road, Cooroy
Pomona Waste Transfer Station – 14 Pomona Kin Kin Road (Cnr Louis Bazzo Dr), Pomona




                                            34                                                                                                  35

Section 19

Engaging with
                                                                                                                          Community stalls at events                                    Coffee chats with councillors

                                                                                                                          We may set up council stalls at major events to               Our councillors offer coffee chats with the community,


our community
                                                                                                                          maximise the opportunities to let the community know          where residents can discuss their ideas and thoughts
                                                                                                                          about open consultations. The stalls are managed              about matters that are important to them. They are
                                                                                                                          by a diverse range of staff to allow for answers to be        located in various cafes and locations across our Shire.
                                                                                                                          provided by relevant staff.

Council is committed to keeping the community engaged and informed of its projects, plans, initiatives, and
activities across the Shire. Furthermore, Council recognises that community engagement is a vital part of
                                                                                                                          Community engagement highlights
effective democracy. Quality engagement between Council and residents is not only good business practice but
                                                                                                                          For this reporting period, three significant engagement projects were delivered.
is also critical to good governance.

                                                                                                                          The most notable engagement project, generating extensive community interest was the second phase of
Our Community Engagement Policy outlines Council’s commitment to the Community Engagement Framework
                                                                                                                          engagement for the Noosaville Foreshore Infrastructure Master Plan and Concept Designs for Resilience project.
and associated principles of engagement. Council will continue to engage with the community to collaboratively
                                                                                                                          The project was finalised in the 2024/25 financial year following a third round of community engagement.
address local issues and achieve better outcomes together.


How we engage                                                                                                                   Noosaville Foreshore Infrastructure Master Plan and Concept Designs for Resilience (Phase 3)
Council uses a range of community engagement techniques and communication methods depending on the
                                                                                                                                — 162 respondents to Phase 3 online survey
issue or project, its goals, its circumstance and the level of influence the community have on decision-making.
                                                                                                                                — 5 stakeholder workshops




                                                                                                                                                                                                                                                   Noosa Council Annual Report 24/25
                                                                                                                                — 32 written submissions
                                                                                                                                — Approximately 125 engaged at pop-up sessions
Your Say Noosa                                                   Submissions                                                    — 60 engaged at two community coffee chats
Our online engagement tool. Registered guests can                We may request formal submissions to capture                   — 1 business workshop
provide feedback and ideas on helping to shape the               community interest and input on various topics.                — 1 meeting with Kabi Kabi Peoples Aboriginal Corporation (KKPAC)
future of our Shire.
                                                                 e-newsletters
Surveys                                                                                                                         Noosa Botanic Gardens Master Plan 2024, Phase 1 –
                                                                 We deliver various community e-newsletters to
                                                                                                                                — 3 meetings with the Stakeholder Reference Group
Common method for obtaining information from                     subscribers with the latest information on Council’s
                                                                                                                                — 8 targeted stakeholder meetings
the community, available electronically through our              projects, events, and activities.
                                                                                                                                — 1 workshop with Tourism Noosa Information Centre Volunteers
websites, such as Your Say Noosa.
                                                                                                                                — Approximately 48 attendees at two community pop-up sessions at the Botanic Gardens
                                                                 Your Noosa Publication
                                                                                                                                — 101 respondents to Phase 1 online survey
Facilitated sessions and workshops                               We regularly publish a lift-out spread in local
We hold online and face-to-face workshops and                    community newspapers, highlighting the latest
sessions to exchange information, involve the                    Council news and updates for residents.                        Pomona Place Pilot Program, Phase 3 –
community and obtain feedback on our plans, ideas                                                                               — 40 respondents to Phase 3 survey  
in a more personal way. Community members can                    Letters                                                        — 1 community workshop
interact directly with staff and have their questions and                                                                       — 1 community pop up at Joe Bazzo Park
                                                                 We post information to members of our community
concerns listened to, answered, and considered.                  likely to be directly affected by a decision, project,
                                                                 or upgrade.
Roundtables and working groups                                                                                            The Your Say Noosa community engagement platform recorded 14,200 visits during the reporting period,
Discussions with community groups, stakeholders                  Social media                                             including an additional 240 new registrations to the platform.  
and community members may be facilitated through                 We inform the community and stakeholders of
developed roundtables and work groups that focus on                                                                       A total of 1,111 people were actively engaged by completing surveys or contributing to forums, while 5,500 were
                                                                 engagement opportunities through social media,
a particular issue or topic.                                                                                              informed through activities such as viewing videos or photos, downloading documents, or visiting FAQ and key
                                                                 providing links to information on Your Say Noosa.
                                                                                                                          dates pages.

                                                            36                                                                                                                     37

Section 20

                                                                                                               Council in Focus
Media and communications coverage
The reporting period saw continued growth in both our social media reach and fortnightly Your
Noosa eNewsletter.

Subscribers to the fortnightly eNewsletter, Your Noosa, grew by five per cent to 9,891, with an
average open rate of 25%. Council’s Facebook, LinkedIn and Instagram platforms recorded double-
                                                                                                                                 1 Entertainment
digit percentage growth over the 12-month period.                                                        571 Employees
                                                                                                                                 Centre / Theatre
Engagements were down on Council’s Instagram platform. This could be attributed to a combination
of our publishing frequency, algorithm changes and the use of static posts over video content.

In early 2025, Council’s corporate website transitioned to a new content management system called
Open Cities. It is a more interactive and user-friendly content management system helping to improve        7 Elected            1 Noosa Regional
the customer experience.                                                                                    Members                   Gallery
Website visitation grew 7.8 per cent during the reporting period.

Council delivered another 15 Your Noosa monthly printed publications in local newspapers for the
                                                                                                          53% Female                 2 Libraries




                                                                                                                                                      Noosa Council Annual Report 24/25
urban and hinterland parts of the Shire, to communicate with residents and raise awareness of
council’s programs, initiatives, and activities.                                                           Workforce             & 1 Mobile Library
Council continues to have a strong engagement and growth in our digital media audience.



                                                                                                           3 Tourist /            48 Median Age
                                                                                                          Caravan Parks            of Workforce



                                                                                                       3 Waste Management            1 Noosa
                                                                                                             Facilities           Leisure Centre



                                                                                                                                   1 Day Respite
                                                                                                          1 Digital Hub
                                                                                                                                      Centre



                                                                                                            1 Noosa              1 Noosa Botanic
                                                                                                         Aquatic Centre              Gardens


                                                  38                                                                        39

Section 21

Mission, Principles & Values
Our Mission                                                      Noosa’s Seven Sustainability Principles are:
We are Noosa – Different by Nature.
                                                                 1. Resources are sustainably managed so that
Our communities celebrate our culture, heritage, and                 the lifestyle and wellbeing of the community is
place. We are connected, engaged, and inspired                       enhanced whilst safeguarding our natural systems
by our unique environment, resilient economy, and                    and without compromising the ability of future
sustainable future. We are committed to maintaining                  generations to meet their own needs.
our point of difference.
                                                                 2. N
                                                                     oosa’s environment is protected, preserved,
                                                                    and managed in a manner that is nature positive,
Legislative Principles
                                                                    low carbon and climate resilient and respects our
The principles of the LG Act underpin our Council to
                                                                    traditional owners spiritual and cultural connection
ensure that we are accountable, effective, efficient, and
                                                                    to Country.
sustainable. They include:
 — Transparent and effective processes, and                     3. Noosa’s economy is prosperous, resilient, circular,
    decision-making in the public interest                           diverse, and protective of its unique environment,
 — Sustainable development and management of




                                                                                                                                                                                                                   Noosa Council Annual Report 24/25
                                                                     culture and heritage.
                                                                                                                                          We care for each other and consider the ‘we’ before ‘me’.
    assets and infrastructure, and delivery of effective                                                                     Supportive
    services                                                     4. Noosa residents belong to a community                                We collaborate, listen and encourage one another to achieve our goals.
 — Democratic representation, social inclusion and                  that values and respects its diversity, accessibility
    meaningful community engagement                                  and affordability.                                                   We are proud of what we do. We are inspired to learn,
                                                                                                                             Passionate
 — Good governance of, and by, local government, and,                                                                                    change and grow, and bring our very best to work every day.
 — Ethical and legal behaviour of councillors and local         5. Noosa’s community is inclusive, safe, connected,
                                                                     and resilient and encourages participation and
    government employees.
                                                                                                                                          We walk the talk. We are honest, genuine and
                                                                     involvement across all life stages.                     Authentic
                                                                                                                                          are not afraid to think differently.
The values of the Queensland Public Sector Ethics Act
                                                                 6. Noosa’s community benefits from quality places,
1994 guide our Council behaviours and underpin our
                                                                     good asset management, services and programs                         We are united and back each other. We listen to each other
Annual Report. These values include:                                                                                         Respectful
                                                                     that enhance wellbeing, and support creative,
 — Integrity and impartiality                                                                                                            to understand different perspectives and embrace diversity.
                                                                     active, and healthy lifestyles.
 — Promoting the public good
 — Commitment to the system of government, and                  7. Good governance and policy is achieved                               We aim high and go the extra mile. We focus
 —A  ccountability and transparency.
                                                                                                                             Committed
                                                                     through forward planning, effective, efficient                       on solutions and are responsible for our actions.
                                                                     and collaborative decision making, made in the
Sustainability Principles                                            interests of the community.
We are proud of our seven sustainability principles                                                                                                     Different by nature.
which underpin all that we do – from planning and                Our Values
decision-making through to delivery of services and              Noosa Council is a values driven organisation.
infrastructure. These principles guide the development           We are proud of our organisational values and strive
of our strategic documents - to ensure consideration             to demonstrate these values in everything we do.
of sustainability across all areas of Council business.




                                                            40                                                                                                   41

Mission, Principles & Values Our Mission Noosa’s Seven Sustainability Principles are: We are Noosa - Different by Nature. 1. Resources are sustainably managed so that Our communities celebrate our culture, heritage, and the lifestyle and wellbeing of the community is place. We are connected, engaged, and inspired enhanced whilst safeguarding our natural systems and without compromising the ability of future by our unique environment, resilient economy, and generations to meet their own needs. sustainable future. We are committed to maintaining our point of difference. 2. Noosa’s environment is protected, preserved, and managed in a manner that is nature positive, NOOSA Legislative Principles The principles of the LG Act underpin our Council to low carbon and climate resilient and respects our traditional owners spiritual and cultural connection ensure that we are accountable, effective, efficient, and to Country. sustainable. They include: este [a falc — Transparent and effective processes, and 3. Noosa’s economy is prosperous, resilient, circular, decision-making in the public interest diverse, and protective of its unique environment, — Sustainable development and management of culture and heritage. We care for each other and consider the ‘we’ before ‘me’. assets and infrastructure, and delivery of effective Supportive services We collaborate, listen and encourage one another to achieve our goals 4. Noosa residents belong to a community zo — Democratic representation, social inclusion and that values and respects its diversity, accessibility oa meaningful community engagement and affordability. We are proud of what we do. We are inspired to learn, Passionate — Good governance of, and by, local government, and, change and grow, and bring our very best to work every day. 5. Noosa’s community is inclusive, safe, connected, — Ethical and legal behaviour of councillors and local government employees. and resilient and encourages participation and involvement across all life stages. We walk the talk. We are honest, genuine and Authentic are not afraid to think differently. The values of the Queensland Public Sector Ethics Act 6. Noosa’s community benefits from quality places, 1994 guide our Council behaviours and underpin our good asset management, services and programs Annual Report. These values include: We are united and back each other. We listen to each other that enhance wellbeing, and support creative, Respectful — Integrity and impartiality to understand different perspectives and embrace diversity. active, and healthy lifestyles. — Promoting the public good — Commitment to the system of government, and 7. Good governance and policy is achieved Committed We aim high and go the extra mile. We focus — Accountability and transparency. through forward planning, effective, efficient on solutions and are responsible for our actions. and collaborative decision making, made in the Sustainability Principles interests of the community. We are proud of our seven sustainability principles * Different by nature. which underpin all that we do - from planning and Our Values decision-making through to delivery of services and Noosa Council is a values driven organisation. infrastructure. These principles guide the development We are proud of our organisational values and strive of our strategic documents - to ensure consideration to demonstrate these values in everything we do. of sustainability across all areas of Council business. 40

Section 22

Corporate Planning
Framework
Our Corporate Planning Framework connects the various components of our corporate planning process                                                                                  Plans, Strategies and Budget                                     planning and regular reviews to ensure the effective
to illustrate how our teams contribute to the success of our organisation. Each year Council will focus on its                                                                                                                                       and efficient delivery of council services.
                                                                                                                                                                                    Our planning is underpinned by key enablers and
Corporate Plan, Operational Plan and Budget to ensure that:
                                                                                                                                                                                    strategies:
 — the key focus areas identified in the Corporate Plan are prioritised during Council’s annual budget process                                                                                                                                      All branches (teams) within Council are required to
 — resources are identified to bring the key focus areas to fruition, and,                                                                                                                                                                          have a current detailed Branch Plan and supporting
                                                                                                                                                                                    Corporate Plan
 — performance measures are identified to monitor progress.                                                                                                                                                                                         operational risk register to ensure service and project
                                                                                                                                                                                    The Corporate Plan 2023 - 2028 outlines our vision for           deliverables are met in accordance with service
To prioritise and identify various projects, initiatives, and services to be funded and delivered by Council on behalf                                                              the Shire, our strategic direction for Council and our           standards and project plans.
of the community each year, Council undertakes a robust review process to ensure all proposed initiatives align                                                                     priorities. It also outlines the role the community can
with Council’s long-term goals and strategies. The process also involves identifying the risks and opportunities                                                                    play in achieving the aspirational outcomes.                     Annual Budget
associated with pursuing or not pursing a specific initiative leading to informed decision-making. This risk-based
                                                                                                                                                                                                                                                     On 28 June 2024, Council adopted its annual budget.
approach enables Council to appropriately prioritise spending and the allocation of resources each year, whilst at                                                                  The Corporate Plan has been structured around five
                                                                                                                                                                                                                                                     Our annual budget provides the financial framework
the same time informing possible future resourcing priorities.                                                                                                                      strategic pillars, namely the Environment, Liveability,
                                                                                                                                                                                                                                                     for our Council to deliver outcomes for our community.
                                                                                                                                                                                    Prosperity, Future and Excellence. Each theme outlines




                                                                                                                                                                                                                                                                                                                  Noosa Council Annual Report 24/25
                                                                                                                                                                                                                                                     In accordance with the LG Act and LG Regulation, the
                                                                                                                                                                                    long-term objectives, strategies, and plans. Importantly,
                                                                                                                                                                                                                                                     annual budget sets out the funding parameters for
                                                                                                                                                                                    signature projects and key actions are identified that
                                                 Integrated Planning and Governance Framework Corporate Plan 2023-2028                                                                                                                               both the significant projects and initiatives contained
                                                                                                                                                                                    will advance us towards our goals over the next five
                                                                                                                                                                                                                                                     in the Corporate Plan, Operational Plan, as well as our
                                                                                                                                                                                    years. Finally, performance measures will enable us to
                                                                                                                                                                                                                                                     core Council services.
                                                 Long -Term                                                                                                           Reporting     track our success.
                                                 Enabling Plans
                                                                                                             High Level Strategies                                                                                                                   This process ensures every activity undertaken by
                                                                                                                                                                                    Operational Plan
                                                                                                                                                                                                                                                     the organisation is appropriately funded and carefully
                                                                                                                                                                      Annual
  Integrated Planning and Governance Framework




                                                                                              Proposed Environment Economic Movement Proposed                                       On 28 June 2024, Council adopted the Operational                 planned. Our annual budget also assists Council in
                                                                                                                                                                      Report
                                                                                              Community Strategy   Strategy Strategy   Resilience                                   Plan 2024 – 2025. This Plan forms an important part of           achieving its long-term financial goals as set out in
                                                                                              Strategy                      (Transport Strategy                       ↑             Council’s strategic planning framework and sets out
                                                 Long -Term                                                                                                                                                                                          Council’s Financial Sustainability Policy. Progress
                                                                                                                            Strategy)                                 Annual
                                                 Financial Plan                                                                                                                     the work Council planned to deliver over the 12 months           in implementing the annual Operational Plan is
                                                                                                                                                                      Operational
                                                                                                                                                                                    towards the achievement of our Corporate Plan
                                                                  Sustainability Principles




                                                                                                                                                                      Report                                                                         reported to Council quarterly while Council’s financial
                                                                                                                                                    Planning Scheme




                                                                                                                                                                                    objectives and the delivery of a wide range of council           performance is reported monthly.
                                                                                                                                                                      ↑
                                                                                                     Supporting Plans and Programs                                                  services and activities.
                                                                                                                                                                      Quarterly
                                                                                                                                                                      Operational                                                                    Long-Term Financial Plan
                                                 Long -Term                                                                                                                         Progress in implementing the Operational Plan is
                                                                                                                                                                      Plan                                                                           This plan is supported by the Financial Sustainability
                                                 Asset Plan                                                                                                                         reviewed by Council quarterly and an annual review is
                                                                                                                                                                      ↑                                                                              Policy, and includes financial projections for resourcing,
                                                                                                     Annual Budget and Operational Plan                                             undertaken to assess progress in implementing the
                                                                                                                                                                      Annual                                                                         and planning the long-term (10 year) delivery of
                                                                                                                                                                      Branch        Corporate Plan.
                                                                                                                                                                                                                                                     strategies, programs, projects, infrastructure and
                                                                                                                                                                      Plan                                                                           investments in environment and sustainability
                                                                                                                                                                                    Branch Plans
                                                 Council                                                                                                              ↑                                                                              initiatives. This ensures a financially sustainable
                                                 Capability and                                      Service Plan, Policies, Guidelines,                              Individual    Whilst the Operational Plan specifies the significant            Council that has the resources now and into the future
                                                 Workforce                                           Standards and Local Laws                                         and Team      initiatives and projects which Council will undertake            to achieve its strategic objectives and provide levels
                                                 Plan                                                                                                                 Performance   over the next 12 months, ‘business as usual’ services,           of service that are both affordable and considered
                                                                                                                                                                                    activities and projects must also be subject to careful          appropriate by the community.


                                                                                                                   42                                                                                                                           43

Section 23

Organisational
Long-Term Asset Management Plans

These plans provide the blueprint for sustainable                                                                                                                                Elected Council


                                                                     Structure
planning for and management of our assets, including                                                                                                                             Mayor & Councillors
roads, infrastructure, technology, buildings, and
services. They ensure we can maintain existing assets
to a satisfactory standard and provide for changing
and emerging needs.


Council Capability and Workforce Plan                                Council’s organisational structure sets the overall
                                                                     structure, departments, and functions to enable the
This plan will outline the capability requirements of
                                                                     delivery of services to our community.
our organisation to deliver against the Corporate
Plan including securing and retaining the key roles,                                                                                                                         Chief Executive Officer
                                                                     Executive Team
people, skills, and knowledge to deliver on projects,                                                                                                                             Larry Sengstock
undertake necessary change management and                            The Executive Team is led by the Chief Executive Officer,
direct resources to priority areas. It will outline an agile,        Mr Larry Sengstock, and includes five Directors. The                 Internal Audit                  Office of the Mayor & CEO
future-focused, and community-driven council while                   team provides clear and consistent leadership and                                                Communications & Community Engagement
ensuring the safety, health and wellbeing of our staff.              decision-making which supports the delivery of the                                               Governance
The completion of the Capability and Workforce Plan                  strategic priorities and direction of operational business                                       Executive Officer
is essential to achieving Council’s strategic vision and is          for Council.
identified as a key action in the Excellence Theme.


Long-term Strategies

Council’s 10-year strategies are significant elements of
the Integrated Planning and Governance Framework,
and each strategy incorporates many subject specific
plans, studies, and action plans.

                                                                                                                                  Director Corporate          Director               Director                    Director                   Director
The 10-year strategies include:
                                                                                                                                       Services              Community            Infrastructure                 Strategy                 Development
 — Community Strategy (to replace current Social
                                                                                                                                       (Acting)               Services               Services                and Environment             and Regulation
    Strategy)
                                                                                                                                     Margaret Gatt           Kerri Contini         Shaun Walsh                 Kim Rawlings            Richard MacGillivray
 —E  nvironment Strategy
 —E  conomic Strategy
                                                                                                                                   - Financial Services    - Customer           - Infrastructure           - Economic                - Development
 — Smart Biosphere Plan
                                                                                                                                   - Revenue Services         Experience            Planning, Design            Development,               Assessment
 — Transport Strategy & Cycling and Walking Strategy
                                                                                                                                   - Procurement           - Sport & Active        & Delivery                  Major Events            - Building &
    and Implementation Plan 2020- 2040 & Noosa
                                                                                                                                   - Fleet                    Lifestyles         - Civil Operations             & Destination              Plumbing
    Trails Master Plan 2020
                                                                                                                                   - Information,         - Community          - Asset Management            Management              - Local Laws &
 — Resilience Strategy (alignment of Disaster
                                                                                                                                      Communications          Connection         -B  uilding & Facilities   - Innovation / Digital       Environmental
    Management Plans and Climate Response)
                                                                                                                                      & Technology         - Arts & Culture      - Special Projects &          Hub                        Health
                                                                                                                                   - People & Culture     - Disaster Recovery      Transport                - Strategic               - Property
The Noosa Shire Planning Scheme - The Noosa Plan -
                                                                                                                                                                                 - Disaster                    Planning, Climate
is Council’s key document that guides development in
                                                                                                                                                                                    Management                  Change
our Shire. Council will continue to uphold and maintain
                                                                                                                                                                                 - Waste                     - Environment
the planning scheme to ensure it continues to reflect
                                                                                                                                                                                                             - Commercial
community aspirations and is responsive to social,
                                                                                                                                                                                                                Business Services
environment and economic changes.


                                                                44                                                                                                                         45

Long-Term Asset Management Plans These plans provide the blueprint for sustainable Elected Council Organisational planning for and management of our assets, including Mayor & Councillors roads, infrastructure, technology, buildings, and Structure services. They ensure we can maintain existing assets to asatisfactory standard and provide for changing and emerging needs. “Y ™” Council Capability and Workforce Plan Council's organisational structure sets the overall structure, departments, and functions to enable the This plan will outline the capability requirements of Ps delivery of services to our community. our organisation to deliver against the Corporate Plan including securing and retaining the key roles, Executive Team Chief Executive Officer people, skills, and knowledge to deliver on projects, Larry Sengstock undertake necessary change management and The Executive Team is led by the Chief Executive Officer, direct resources to priority areas. It will outline an agile, Mr Larry Sengstock, and includes five Directors. The Office of the Mayor & CEO Internal Audit future-focused, and community-driven council while team provides clear and consistent leadership and Communications & Community Engagement Governance ensuring the safety, health and wellbeing of our staff. decision-making which supports the delivery of the The completion of the Capability and Workforce Plan strategic priorities and direction of operational business Executive Officer is essential to achieving Council's strategic vision and is for Council. identified as a key action in the Excellence Theme. I _— Long-term Strategies . oa zo Council's 10-year strategies are significant elements of 7 Lo \ the Integrated Planning and Governance Framework, ee and each strategy incorporates many subject specific = plans, studies, and action plans. ,.) s Director Corporate Director Director Director Director The 10-year strategies include: Services Infrastructure Community Strategy Development — Community Strategy (to replace current Social (Acting) Services Services and Environment and Regulation Strategy) Margaret Gatt Kerri Contini Shaun Walsh Kim Rawlings Richard MacGillivray — Environment Strategy — Economic Strategy - Financial Services - Customer - Infrastructure - Economic - Development — Smart Biosphere Plan - Revenue Services Experience Planning, Design Development, Assessment — Transport Strategy & Cycling and Walking Strategy - Procurement - Sport & Active & Delivery Major Events - Building & and Implementation Plan 2020- 2040 & Noosa - Fleet Lifestyles - Civil Operations & Destination Plumbing Trails Master Plan 2020 - Information, - Community - Asset Management Management -Local Laws & — Resilience Strategy (alignment of Disaster Communications Connection - Building & Facilities - Innovation / Digital Environmental Management Plans and Climate Response) - Arts & Culture Hub Health & Technology - Special Projects & - People & Culture - Disaster Recovery Transport - Strategic - Property The Noosa Shire Planning Scheme - The Noosa Plan - - Disaster Planning, Climate is Council's key document that guides development in Management Change our Shire. Council will continue to uphold and maintain - Waste - Environment the planning scheme to ensure it continues to reflect - Commercial community aspirations and is responsive to social, Business Services environment and economic changes. 44 ate)

Section 24

Our People




                                                                                                                                                                                                                                                          Our Council
                                                               Organisational Establishment for period 1 July                  Diversity in Leadership Roles   Executive                 Manager                    Coordinator/Supervisor
                                                               2024 to 30 June 2025
                                                                                                                               Gender                          Percentage of Total (%)   Percentage of Total (%)    Percentage of Total (%)   Total (%)

                                                               Department                        Full Time Equivalent (FTE)    Female                          1.83                      5.50                       38.53                     45.87

                                                               Chief Executive Officer           1.00                          Male                            3.67                      12.84                      37.61                     54.13

                                                               Office of Mayor & CEO             27.10                         Total                           5.50                      18.35                      76.15                     100
As an Employer of Choice, Council offers a
diverse range of employment opportunities and                  Corporate Services                51.10
is committed to ensuring Council has the capacity              Community Services                109.82
and capability within its workforce to deliver positive                                                                       Volunteers                                                      Code of Conduct
                                                               Infrastructure Services           152.15
outcomes for our community. Our workforce
includes planners, engineers, tradespeople,                    Strategy and Environment          36.74                        Volunteering allows individuals to give back to their           Our employees are bound by the Council Employee
and specialists in various disciplines including                                                                              community and make a positive impact on the lives               Code of Conduct (the Code) which plays an important
                                                               Development and Regulation        67.30
information technology, law, business, accounting,                                                                            of others, which can be a rewarding and fulfilling              part in helping Council operate to the highest
public administration, asset management and                    Total                             445.21                       experience. Volunteering can also help people to                standards. It is based on a “best practice” model
human resource management.                                                                                                    develop new skills, build relationships with others, and        developed by the Local Government Association
                                                                                                                              gain a sense of purpose and belonging.                          of Queensland, and it brings together a range of
                                                               Employee type as at 30 June 2025                                                                                               obligations, requirements and expectations that are
Council’s establishment comprises of permanent,
temporary, and casual positions. Although not a                Employee Type                    Count                         Over 170 volunteers helped Council to deliver a                 set out in other pieces of legislation and puts them into
statutory requirement, changes to the organisational                                                                          range of programs and services for this reporting               a single document. The Code states and reinforces




                                                                                                                                                                                                                                                          Noosa Council Annual Report 24/25
                                                               Full Time                        358
structure are presented to Council for consideration                                                                          period, including assisting with Bushland Care, library         the principles by which Council conducts itself and
and adoption annually because it is considered                 Part Time                        104                           services, Noosa Botanic Gardens and gallery services.           while our Council’s business practices may evolve
good management practice for Council to                                                                                                                                                       over time, our commitment to these principles will
                                                               Casual                           109
review its corporate structure and organisational                                                                             We value the involvement of volunteers in assisting us          remain constant.
                                                               Total                            571                           to deliver a wide range of programs that enhance the
establishment at the time it adopts its Operational
Plan and Budget. This ensures that resources                                                                                  services to our community.                                      The Code applies to all Council employees regardless
are allocated within the budget and that there                                                                                                                                                of their employment status, role or position. This
                                                               Tenure of employment with Council
is alignment with the priorities and objectives of                                                                            International Volunteers Day 2024                               includes permanent and temporary (full-time or
Council’s Operational Plan, Capital Program, and               Tenure                       Percentage (%)                    On 6 December 2024, Council proudly supported                   part-time) and casual employees, temporary agency
standards of service delivery.                                                                                                International Volunteers Day to raise awareness of              supplied staff, contractors, and volunteers.
                                                               0 – 2 years                  46
                                                                                                                              the important role volunteers play in our community
                                                               3 – 10 years                 32                                and to say thank you to all our dedicated volunteers.           The Code was updated and refreshed in April 2025.
On 28 June 2024, Council adopted the following
organisational structure indicating an overall                 11 – 20 years                13                                This year, Council held a morning tea event for our             The changes included new branding in line with
increase in the total number of Full Time Equivalent                                                                          volunteers and reflected on the International Volunteer         Council’s corporate brand, a greater focus on SPARC
                                                               21+ years                    9
(FTE) positions from last financial year of 433.52 to                                                                         Day theme of emphasising how volunteers contribute              Values, inclusion of additional practical examples,
445.21, excluding temporary positions. This increase                                                                          to achieving the Sustainable Development Goals.                 and alignment to new organisational policies and
of 11.69 FTE allows Council to expand overall                                                                                                                                                 procedures. All employees were issued Employee
                                                               Employee Gender Ratio (%) – 30 June 2025
capacity to meet demand and provide greater                                                                                   Council offers people interested in various                     Code of Conduct training to familiarise themselves
                                                               Female                           52.71                         volunteering roles the opportunity to register their            with the requirements of the updated Code and their
services to the community.
                                                               Male                             47.29                         interest. Further information on how to express an              obligations to uphold these standards.
Additionally, Council monitors and tracks employee                                                                            interest can be found on Council’s website: noosa.
turnover to assess risks, satisfaction and to                                                                                 qld.gov.au/Services-and-Facilities/Get-Involved/
recognise opportunities for retention. For this                                                                               Volunteering
reporting period, Council’s turnover rate for all
staff was 19.44% while Council’s turnover rate for
permanent staff was 15.25%

                                                          46                                                                                                                             47

Section 25

Performance Plans                                              The Employee Awards were presented in various                 and practical learning, this program provides the               Equal Opportunity Employment
                                                               categories, aligning to our SPARC values, to deserving        tools, insights, and hands-on experience to take
During this reporting period, performance planning             finalists and winners. A total of 172 nominations across      on the responsibility of leading a team with greater            Council recognises the importance of workforce
processes; through Performance Agreements for                  Council were received for the various awards.                 confidence.                                                     diversity and promotes a working environment where
Senior Officers and MyPlans for Employees, assisted                                                                                                                                          people are treated on their merits at every stage of
Council to deliver on our Corporate Plan, Operational          Learning and Development                                   — LGMA Australasian Management Challenge                          their employment. At Council, all staff are encouraged
Plan and Branch Plans.                                                                                                       Council participated in the LGMA Australasian                   to embrace equity and diversity at all levels within the
                                                               To complement the technical expertise of our staff            Management Challenge, an innovative                             organisation. Council’s Employee Code of Conduct
These performance planning processes support the               and contractors, Council provides its employees with          development opportunity that is a convergence                   reinforces the standards of behaviours required of
performance and development of our leaders and                 various learning and development opportunities,               of ideas, energy, academic rigour, and practical                employees including non-discriminatory workplace
employees, by cascading performance objectives                 some of which are highlighted below. Our training             application – the elements of which develop great               practices. This is supported by training opportunities
to individual contributors. They also provide the              is focused on compliance, safety, operational and             leadership. This program is the premier forum for               focused on non-discrimination and unconscious bias.
opportunity to identify development goals and                  corporate requirements to ensure the continued                current and emerging local government leaders.
supporting activities that upskill our workforce and           maintenance and development of skills and                                                                                     Positive Duty Prevention Plan
enhance behaviour in-line with our SPARC Values.               knowledge for current roles. Throughout the year, staff    Training                                                           In alignment with our commitment to a fair, respectful
                                                               also attend ad hoc industry seminars and conferences       Employees accessed learning and development                        and inclusive workplace, Council has responded to
Our Culture                                                    to remain current in their area of expertise. Key          training to equip them with the necessary skills, ability,         recent changes to the Sex Discrimination Act 1984
                                                               opportunities are highlighted below:                       and knowledge to effectively perform their roles                   (Cth), which introduced a strengthened Positive Duty
At Council, we recognise our people are our greatest                                                                      whilst growing professionally. Training opportunities              on all employers to take proactive and preventative
asset, and we strive to cultivate an organisational            —L
                                                                 eadership Development Program – LEAD                    were supported via the Learning and Development                    action against workplace sexual harassment and




                                                                                                                                                                                                                                                         Noosa Council Annual Report 24/25
culture that is inclusive, values driven, and community         Our LEAD Program learning objectives aligned              Calendar and/or by individual or team requests                     related conduct.
focused. We believe it is important to recognise                to two key organisational priorities; employee            through our annual performance planning process.
individuals and teams who have made a significant               wellbeing and managing psychosocial hazards                                                                                  During this reporting period, Council commenced
contribution to Council and our community, either               in the workplace. In September 2024, all Council                                                                             the development of a Positive Duty Prevention Plan.
through years of service, by delivering a successful            leaders participated in Psychosocial Masterclasses         Learning and Development Training Types                           This work reflects our commitment to the legislative
outcome, or exhibiting our SPARC Values.                        which introduced the Work Health and Safety                                                                                  reforms arising from the national Respect@Work
                                                                                                                           Training                                             Count
                                                                (Managing Psychosocial Hazards at Work) Code                                                                                 Report and our broader focus on employee wellbeing
                                                                of Practice 2024 and raised awareness of the               Safety training for Induction, Fire and First Aid*   414
Together we SPARC Culture Program                                                                                                                                                            and organisational integrity.
In August 2024, the CEO introduced our Together we              four risk management steps for psychosocial                Corporate Induction Training                         99
SPARC Culture Program to build upon our embedded                hazards; identify, assess, control, and review.                                                                              The Plan aligns with the Australian Human Rights
                                                                                                                           Leadership Development                               104
SPARC Values and Values in Action Framework. The                                                                                                                                             Commission’s seven Standards for Complying with the
purpose of the Program is to improve employee                  —L
                                                                 GMA Propeller Program                                    Training and Development                             480          Positive Duty and will be implemented in stages across
engagement and participation, whilst cultivating our            Council participated in the Local Government                                                                                 the organisation throughout 2025. By embedding
                                                                                                                           Conferences and Seminars                             34
desired culture for a cohesive and united workforce,            Managers Australia (LGMA) Propeller Program. This                                                                            these obligations into everyday practice, Council is not
                                                                is a dynamic professional development program             Note: *Casual and contractor positions included
with performance driven purpose.                                                                                                                                                             only meeting its legal responsibilities but reinforcing a
                                                                offering participants a broad understanding of                                                                               workplace culture where every employee feels safe,
2024 SPARC Employee Awards and Recognition                      local government in Queensland – its nuances,                                                                                valued and respected.
                                                                challenges, and opportunities.                             Learning and Development Training Spend
of Service
On 28 November 2024, the CEO and leadership team                                                                           Training Type                           Training Spend ($)        Traineeships
hosted a SPARC Values reward and recognition event             —L
                                                                 GMA Ignite Program                                                                                                         Council continued its participation in the First
                                                                                                                           Safety and Compliance                   115,374
for all employees. Council celebrated and thanked               Council participated in the LGMA Ignite Programme                                                                            Start Program, one of eight initiatives under the
its staff for their contributions and outstanding work          which is a tailored leadership development                 Learning and Development                319,352                   Skilling Queenslanders for Work strategy led by the
delivered across Noosa Council and the Shire.                   program designed to provide new or aspiring                                                                                  Department of Employment, Small Business and
                                                                managers, supervisors, or team leaders with the                                                                              Training. The program provides wage subsidies
This year, 42 employees were recognised for their               necessary skills to manage and lead themselves                                                                               to local councils to employ trainees, offering
commendable years of service at Noosa Council.                  and their team. Through interactive workshops                                                                                young people and disadvantaged job seekers


                                                          48                                                                                                                            49

Section 26

the opportunity to gain nationally recognised                    Work Health and Safety                                    Wellbeing at Work Project                                    Workplace Injury
qualifications and 12 months of paid employment                                                                            In September 2024, Council launched a Wellbeing              Council continues to experience low numbers of
through a structured traineeship.                                Council has a proactive approach with a strong            at Work Project to comply with the Australian                injuries resulting in workers’ compensation claims
                                                                 focus on work health and safety in our everyday           Government’s approved Work Health and Safety                 as outlined in the table. Council’s Work Health and
During this reporting period, Council expanded                   work. Our procedures and programs outline safety          (Managing Psychosocial Hazards at Work) Code of              Safety Team continue to focus on education, training,
its annual Traineeship Program in recognition that               duties, responsibilities, and guidelines for managers,    Practice 2024 under section 274 of the Work Health           prevention, and injury management to continuously
traineeships offer several benefits to our local                 supervisors, and all other workers to create and          and Safety Act (the WHS Act). The Project was                improve our claims performance and support our
community and economy by increasing workforce                    support a positive safety culture.                        developed to meet psychosocial safety legislation            employees.
participation, driving job growth, and increasing social                                                                   requirements while fostering a workplace culture that
inclusion for disadvantaged job seekers. Council has             Workplace Health and Safety Management                    enhances employee wellbeing, boosts organisational
participated in the First State Program since 2016 and           System Plan                                               performance, and reduces psychosocial hazards to              Workers’ Compensation Claims up to 30 June 2025
has engaged 29 trainees to date.                                 Council has an endorsed Work Health and Safety            better serve the community.
                                                                                                                                                                                         Year                         No. of Claims
                                                                 Management System Plan 2024 – 2026. This Plan sets
Wellbeing                                                        out a strategic framework to support Council’s work       Council’s approach included a Wellbeing at Work               2014                         9

                                                                 health and safety management system and to ensure         Roadmap, designed to guide the organisation                   2015                         28
THRIVE                                                           that Council:                                             through the necessary steps to meet the psychosocial
                                                                                                                                                                                         2016                         30
The Thrive Program continues to be a cornerstone of               — Provides a safe and healthy workplace                 safety standards outlined in the Work Health and
Noosa Council’s strategic commitment to fostering                 — Complies with applicable health and safety            Safety Act and Regulations. This roadmap supports             2017                         19
a progressive, inclusive, and supportive workplace.                  legislation, such as the Queensland Work Health       an integrated strategy to foster a safe, healthy, and
                                                                                                                                                                                         2018                         26
Thrive prioritises employee wellbeing, psychological                 and Safety Act 2011                                   productive workplace by:




                                                                                                                                                                                                                                                Noosa Council Annual Report 24/25
safety, and development, supporting Council’s                                                                               — Identifying hazards                                       2019                         17
                                                                  — Meets the requirements of the Local Government
position as an employer of choice. The program’s                     Workcare “Mutual Risk Obligations” program, and        — Eliminating or minimising risks                           2020                         34
inward focus ensures that initiatives are tailored to the         — Follows the framework set out by the National          — Controlling risks
                                                                                                                                                                                         2021                         25
needs of staff, promoting mental and physical health,                Audit Tool for Self-Insurers.                          — Maintaining and reviewing control measures, and
connection, and engagement across all departments.                                                                          — Consulting with employees throughout the process.         2022                         25

                                                                 Council regards its work health and safety obligations                                                                  2023                         9
During this reporting period, Thrive delivered a range           with the utmost importance and as such, resources         To meet employee consultation requirements, Council
of impactful initiatives including all-staff wellbeing                                                                     conducted a Wellbeing at Work employee survey                 2024                         14
                                                                 will continue to be allocated to ensure compliance with
events, nature-based activities and awareness                    relevant legislation, support continuous improvement      in October 2024. The survey aimed to identify the             2025                         17
campaigns such as RUOK and Movember. It also                     of the work health and safety management system           key factors influencing employee wellbeing, both
strengthened internal communication and visibility               and maintain a safe and healthy work environment.         strengths and areas for improvement, as well as
through Noogle and Viva Engage and sought                                                                                  identifying the psychosocial hazards and risks across
employee feedback via internal surveys to inform                 Workplace Health & Safety Policy                          the organisation.
future needs and opportunities.                                  On 22 January 2025, the CEO approved the updated
                                                                 Workplace Health & Safety Organisational Policy. This     Between November 2024 and June 2025, survey
Mental Health and Building Resilience                            Policy affirms Council’s commitment to continually        debriefs, wellbeing workshops, and action planning
Council continues to offer mental health, resilience             improving our safety culture and behaviour to ensure      sessions were undertaken across the organisation
and employee assistance programs designed to                     the provision of a safe working environment for           to inform targeted actions and controls to build
help employees cope with personal or work-related                its employees, contractors, volunteers, labour hire       a healthier, more supportive workplace for all
problems that could affect their job performance,                employees and visitors to Council premises and            employees. Council will maintain its focus on risk
health, or wellbeing. Council reviewed its employee              worksites.                                                management by implementing various initiatives,
assistance program in consultation with employees,                                                                         programs and awareness opportunities aimed at
to ensure our partner provider delivers the care and                                                                       reducing psychological hazards in the workplace.
responsiveness our employees need and deserve.




                                                            50                                                                                                                     51

Section 27

52
53




     Noosa Council Annual Report 24/25

ue 4 ‘es a ae ry oe om Ney al f . 2 ZNG ne as ae] Te 14 ee ys iM S| Sal
2	1	18	0	0	0	4121	172	104	104	-1	
3	1	18	1	0	0	4121	172	112	104	-1	
4	1	18	1	1	0	4121	172	104	104	-1	
5	1	18	1	1	1	4121	172	104	104	8	eS
2	1	19	0	0	0	1861	248	61	44	-1	
3	1	19	1	0	0	1861	248	61	44	-1	
4	1	19	1	1	0	1861	248	61	44	-1	
5	1	19	1	1	1	1861	248	61	44	7	Fe
2	1	20	0	0	0	2702	177	269	151	-1	
3	1	20	1	0	0	2702	177	269	151	-1	
4	1	20	1	1	0	2702	177	269	151	-1	
5	1	20	1	1	1	2702	177	269	204	54	Ne
2	1	21	0	0	0	491	301	73	29	-1	
3	1	21	1	0	0	491	301	73	29	-1	
4	1	21	1	1	0	491	301	73	29	-1	
5	1	21	1	1	1	491	302	22	28	36	“ee
2	1	22	0	0	0	557	329	73	32	-1	
3	1	22	1	0	0	557	329	73	32	-1	
4	1	22	1	1	0	557	329	73	32	-1	
5	1	22	1	1	1	557	329	73	32	52	oe
2	1	23	0	0	0	936	287	123	72	-1	
3	1	23	1	0	0	936	287	123	72	-1	
4	1	23	1	1	0	936	287	123	72	-1	
5	1	23	1	1	1	936	287	123	72	0	i
2	1	24	0	0	0	2124	256	475	91	-1	
3	1	24	1	0	0	2124	256	475	91	-1	
4	1	24	1	1	0	2124	256	475	91	-1	
5	1	24	1	1	1	2124	246	87	53	0	Ber
5	1	24	1	1	2	2307	264	78	68	18	Ve
5	1	24	1	1	3	2553	256	46	91	30	ae
2	1	25	0	0	0	2904	259	360	208	-1	
3	1	25	1	0	0	2904	259	360	208	-1	
4	1	25	1	1	0	2904	259	360	208	-1	
5	1	25	1	1	1	2904	259	220	86	34	Ok,
5	1	25	1	1	2	3068	269	196	198	55	iS
2	1	26	0	0	0	659	235	243	148	-1	
3	1	26	1	0	0	659	235	243	148	-1	
4	1	26	1	1	0	659	235	243	148	-1	
5	1	26	1	1	1	659	295	4	12	0	.
5	1	26	1	1	2	725	235	177	148	17	Ss
2	1	27	0	0	0	870	352	93	42	-1	
3	1	27	1	0	0	870	352	93	42	-1	
4	1	27	1	1	0	870	352	93	42	-1	
5	1	27	1	1	1	870	352	93	42	9	Leta
2	1	28	0	0	0	2584	359	218	30	-1	
3	1	28	1	0	0	2584	359	218	30	-1	
4	1	28	1	1	0	2584	359	218	30	-1	
5	1	28	1	1	1	2584	359	218	30	6	Se
5	1	28	1	1	2	2720	355	51	40	21	oe
2	1	29	0	0	0	3243	264	221	141	-1	
3	1	29	1	0	0	3243	264	221	141	-1	
4	1	29	1	1	0	3243	264	221	141	-1	
5	1	29	1	1	1	3243	264	221	148	16	ah
2	1	30	0	0	0	1946	401	53	39	-1	
3	1	30	1	0	0	1946	401	53	39	-1	
4	1	30	1	1	0	1946	401	53	39	-1	
5	1	30	1	1	1	1946	401	53	39	0	p ee ae” es- = Py. 7 e ae ale bu eet ~—, oo .h" te A aN ae bis Me “= ee ll 1: Om “a Mae Dy. alta w= A < TI Te uf, 4] i , Var tee a mig a wx Py id xs “ \" be i yh a a ad & # bY ae iy Ltd Py Mg hl f W, 4 jaa FP eee ne we on ili Pa SS ~ A CA > a on is “ rs y er Pe yi a eg aN a ENT Fi erg ad VW ) \ ce ‘ A P oF Fe < ws « ¥ no GelG, s — Tf hoy — a 4h me. rE a a ed vz = >) —— a a ss yA sb yee M > s F me TN 2 os =a a Se a Vex r@ ated ane ee a Ny nae = AA ra TA x4 °F eS i “~ i a fees ows aS yf ko ae Nj $ ep 4g a > Sos iS >t ta ee ee Ke aot so Cx . cs oie a = te ia ing BP a Pa ue a a » {| a oR We eo ye a Ae ~t 2 a te At ie Li ake = - a4 ee - ye nS ee an ce Be Les 3 ee ty ee He 3 ae 2) eee ue Teg ir baa ALG bs od oth, ni A i228 Sy Ves mii = od bs ve ¥N i] ar pie: Ay — Al bpd ="2 ae SE eae t fl T — =r ee ~ —_ a —_——- — |G We rege rr ele: isa ma a Ta = = toed oo rape i rt) 7 ee rey Son ~— a ~ s = T=. — — he ~ > raIFL ~ — be er Ty ae — at -2 —— ss —— — Ur ———— oe Se) — ene y a el mapa A Se - tt So ee a — —* a — ae ae — formance — eee, = — - es r = toy-4 boxe]

Section 28

Year in Review
                                                                                                                             to continue joint efforts in managing tourism               organisational priorities, a congested community
                                                                                                                             and to develop a roadmap outlining the future               engagement calendar, shifts in Council direction, and
                                                                                                                             collaboration and arrangements between the two              rising community expectations and feedback.
                                                                                                                             organisations.
                                                                                                                          — Disaster Recovery Plan: Reconstructed Back                  Initiatives experiencing significant delays are closely
                                                                                                                             Mountain Road after a landslide, restoring access           monitored by the responsible Manager and Director,
This section of the Annual Report considers Council’s            —N
                                                                   oosaville Foreshore Infrastructure                       and incorporating stabilisation, drainage, and              with issues addressed through enhanced project
progress and performance in achieving the goals set               Management Plan: A 20-year strategy to guide               resurfacing to meet safety and durability standards.        planning and strengthened risk management
out in its Corporate Plan.                                        sustainable upgrades, improve amenities and             — Customer Care: Council completed a survey                   practices. Additionally, the Executive Team regularly
                                                                  accessibility, and enhance climate resilience.             to gauge community satisfaction and identified              review the progress of major initiatives to proactively
Council’s Corporate Plan 2023 – 2028 outlines our                —T
                                                                   he iconic story of surfing in Noosa: A                   opportunities to improve service delivery.                  address any emerging challenges.
vision for the Shire, sets the strategic direction for            comprehensive record preserving Noosa’s surfing         — Policy: Council endorsed the Integrated
Council and our priorities over the next five years. In           heritage, highlighting key milestones, personalities,      Compliance and Enforcement Policy to guide                  How are we tracking?
conjunction, Council’s Operational Plan 2024 - 2025               and its cultural impact on the region’s identity.          regulation, investigation, and enforcement across
details the significant initiatives undertaken during the        —F
                                                                   loating Land 2025 Biennale: Completed                    community and environmental matters.                        Council’s Operational Plan 2024 – 2025 comprises
period as we work towards achieving the key focus                 all preparations for Biennale Floating Land             — Safety: The WHS team has reviewed the                       of 107 initiatives that are strategically aligned with the
areas set out in the Corporate Plan.                              2025, coordinating logistics, engaging artists             Workplace Health and Safety Policy and developed            themes outlined in the Noosa Council Corporate Plan
                                                                  and stakeholders, and promoting community                  a new annual Workplace Health and Safety                    2023–2028. Each initiative contributes to Council’s
Throughout the year, the CEO provided Council with                participation to deliver a vibrant cultural event.         Management System Plan.                                     overarching objectives and may represent either a
quarterly reports outlining progress of the Operational          —W
                                                                   astewater treatment system auditing                   — Contract Management: The Contract                           long-term, staged effort aimed at achieving a broader




                                                                                                                                                                                                                                                      Noosa Council Annual Report 24/25
Plan and details of Key Performance Indicators. Both              program: A proactive audit of Kin Kin properties           Management Framework has been completed, and                vision—potentially spanning multiple years—or a
the quarterly and annual reports to Council are publicly          with Wastewater Treatment Plants (WTP) was                 staff training is scheduled for FY25/26.                    discrete project with clearly defined objectives and
available via Council’s website.                                  completed, with further Shire-wide audits                                                                              deliverables.
                                                                  planned to ensure effective operation and protect       However, there have also been delays to several key
For this reporting period, Council reported                       waterways and the community.                            initiatives:                                                   Overall, the majority of initiatives are progressing well
achievements, progress and key performance                       —P
                                                                   athways & Cycleways: Council sustained                 — Noosa River Catchment Management Plan                      with 76 (71%) are either ‘Completed’ or currently ‘On
indicator outcomes aligned to Council’s corporate                 pathway standards through the renewal program            — Destination Management Plan                                Track’ for completion within the scheduled timeframe.
planning framework. With a five-year horizon to deliver           and implemented the Cycling and Walking Plan to          — Community Strategy                                         A further 25 initiatives (23%) are experiencing a ‘Minor
the Signature Projects and Key Actions in its Corporate           guide active transport across the shire.                 — Financial Strategy                                         Disruption’, while 6 initiatives (6%) are facing a ‘Major
Plan, project commencement and completion dates                  —S
                                                                   ustainable Procurement: Embedded sustainable                                                                         Disruption’.
vary accordingly.                                                 procurement practices into Council processes            The disruptions can be attributed to a range of
                                                                  through a formal policy, supported by education,        factors, including resourcing constraints, competing
Performance Summary                                               measurement, and reporting frameworks.
                                                                 —W
                                                                   aste and Resource Recovery: Procurement
The Operational Plan 2024-25 set an ambitious and                 underway for a green waste composting facility;
                                                                                                                           Status of Initiatives by Corporate Theme
comprehensive program of work, encompassing a                     solar farm feasibility and technical enquiries
broad suite of strategic initiatives aimed at advancing           completed; Transfer Station redesign plans and           Status                    Environment      Liveability         Prosperity        Future        Excellence        Total
the objectives of Council’s Corporate Plan. The plan              application submitted.
was intentionally forward-looking, reflecting both the           —E
                                                                   ngagement with Traditional Owners: 41 formal                Complete                   6               8                   3               3                13           33
organisation’s strategic priorities and its commitment            engagements were held with Kabi Kabi People’s
to delivering outcomes of long-term value to the                  Aboriginal Corporation (KKPAC) and the Kabi Kabi              On Track                   8               11                  6               8               10            43
community.                                                        Land & Sea Rangers. Council also finalised the
                                                                  internal Aboriginal Cultural Heritage Act training            Minor Disruptions          6               7                   3               5                4            25
Council initiatives are progressing well, with several            program, which is set for delivery in FY25/26.
key milestones achieved in this reporting period:                —T
                                                                   ourism Noosa: Council approved a revised                    Major Disruptions           1              1                   0               0                4             6
                                                                  12-month agreement with Tourism Noosa
                                                                                                                           Total                           21             27                  12               16              31           107


                                                            54                                                                                                                      55

Section 29

Theme 1 — Environment                                                                                                        Key Actions

                                                                                                                             No.      Description                                           Comment                                             % Complete

                                                                                                                              4       Continued delivery of Community and                   Ongoing delivery of both grants programs.               40
                                                                                                                                      Environment Grants Program.                           Community Grants Policy has been reviewed,
                                                                                                                                                                                            revised and adopted. New grant categories to be
                                                                                                                                                                                            implemented from September 2025.
Highlights
                                                                                                                                      Enhance our understanding of the value of our
                                                                                                                              5                                                             Ongoing.                                                50
                                                                                                                                      natural areas and systems.
— Noosaville Foreshore Infrastructure Management Plan: The master plan is a 20-year strategy to guide                                                                                      Complete and annual monitoring is ongoing -
                                                                                                                              6       Develop integrated water monitoring program.                                                                  100
   sustainable upgrades, improve amenities and accessibility, and enhance climate resilience, while                                                                                         Public dashboard being developed.

   preserving the foreshore’s natural character and reflecting community priorities.                                                  Complete and implement Encroachments into             Complete and implementation is ongoing within
                                                                                                                              7                                                                                                                     100
                                                                                                                                      Public Land Policy.                                   resources.
— The iconic story of surfing in Noosa: A comprehensive record that celebrates and preserves this
   distinctive element of the region’s heritage and lifestyle. The work captures historical milestones, notable
   personalities, and the cultural significance of surfing in shaping Noosa’s identity.
                                                                                                                             Operational Plan 2024 – 2025 Performance Progress
— Council Works: Throughout the Operational Plan year, Council ensured that all capital, civil, and
   maintenance works adhered to Noosa Design Principles, legislative requirements, and environmental
   best practices, including the practical integration of fauna- and flora-sensitive designs to minimise                     Completed Initiatives
   environmental impact.                                                                                                     OP Ref     Initiative                                                        Lead Service Area         Status    Date Delivered

                                                                                                                              1.3.1     Finalise the Noosaville Foreshore Management Plan to              Infrastructure Services              19/06/2025
Corporate Plan 2023 – 2028 Performance Progress                                                                                         provide an asset renewal program for aging infrastructure




                                                                                                                                                                                                                                                               Noosa Council Annual Report 24/25
                                                                                                                                        and in response to increased community expectations and
                                                                                                                                        the increasing risk of climate change.

 Signature Projects                                                                                                           1.3.5     Implement the Noosa Spit Shoreline Erosion Management             Infrastructure Services              31/08/2024
                                                                                                                                        Plan (SEMP) to protect the Noosa Spit and river estuary (incl.
                                                                                                                                        sand and Noosaville foreshores) from major coastal events.
 No.   Description                                          Comment                                             % Complete
                                                                                                                              1.4.1     Prepare Conservation Management Plans for at least two            Community Services                   26/03/2025
  1    Yurol-Ringtail State Forest Conservation Project.    Complete.                                              100                  Council-controlled heritage places to inform decision
                                                                                                                                        making about conserving and managing places of cultural
  2    Completion of the Noosa River Plan.                  Funding and a resource secured through Resilient       50                   significance.
                                                            Rivers Program to deliver the Catchment Action
                                                            Plan in 2025 and 2026.                                            1.4.2     Document the iconic story of surfing in Noosa to capture this     Community Services                  30/06/2025
                                                                                                                                        unique aspect of Noosa’s heritage and lifestyle.
  3    Implementation of Coastal and Foreshore              Underway - implementation ongoing within               20
       Management Plans.                                    allocated resources.
                                                                                                                              1.5.1     Finalise the transition arrangements for the Yurol Ringtail       Strategy and                         01/02/2025
  4    Delivery of Coastal Hazard Adaptation Plan           Various CHAP projects are underway and being           30                   State Forest land for conservation to expand the area             Environment
       (CHAP).                                              delivered. Further information is available on                              protected for conservation in Noosa Shire.
                                                            Council’s website.
                                                                                                                              1.8.3     Ensure all Council capital, civil and maintenance works are       Infrastructure Services             30/06/2025
 Key Actions                                                                                                                            planned, delivered, and maintained in accordance with the
                                                                                                                                        Noosa Design Principles, legislative requirements, and best
  1    Ongoing delivery of Noosa Shire Heritage             Ongoing delivery of heritage program and growth        40
                                                                                                                                        environmental practice. This includes minimising impacts on
       Program, including Heritage Register, Heritage       of heritage portal, stage 3 of heritage register
                                                                                                                                        environmental values and incorporating fauna/flora sensitive
       Overlay and Heritage Portal.                         review complete - awaiting planning amendment
                                                                                                                                        designs into project planning and delivery, where practical.
                                                            process, new structure implemented for heritage
                                                            services.

  2    Refresh, implement and embed the Noosa Design        Draft complete. Feedback is being sought               60
       Principles.                                          in coming months and final document to be
                                                            presented to Council later this year.

  3    Delivery of annual Capital Infrastructure Program.   Solid delivery of $30million worth of Program          80
                                                            consistent with previous years, especially
                                                            considering weather and resource constraints.
                                                            A budget initiative has been profiled for FY25/26
                                                            to better resource the Program to provide more
                                                            proactive delivery.




                                                             56                                                                                                                               57

Section 30

On Track Initiatives                                                                                                      Disrupted Initiatives

OP Ref   Initiative                                     Lead Service Area Status   Comments                               OP Ref   Initiative                                        Lead Service Area Status   Comments

 1.1.1   Continue to deliver the Modern Water Quality   Strategy and               This programme is ongoing.              1.1.2   Enhanced management of bio basins                 Strategy and               Delivery of the maintenance
         Monitoring Program for the Noosa and           Environment                Monitoring was completed as                     in formal asset management systems,               Environment                schedule was delayed in Q3
         Mary River Sub-catchments to monitor the                                  planned for all sites in Q4. A                  including asset management and renewal to                                    due to adverse weather, and the
         environmental health of the catchments and                                six-month trial of Mary River                   reduce harmful stormwater runoff to protect                                  programme was unable to recover
         identify priority areas for management.                                   sub-catchment monitoring has                    and improve waterway health.                                                 these delays in Q4.
                                                                                   commenced with Sunshine Coast
                                                                                   Council. Water quality dashboard       1.2.3    Initiate a review of the Biosecurity Plan 2020    Strategy and               A draft is currently being reviewed;
                                                                                   has been trialled with the Noosa                to manage invasive species which threaten         Environment                however, staff resources have
                                                                                   Waters Residents Association.                   Noosa’s biodiversity values.                                                 been limited due to competing
                                                                                   Council to be briefed on the annual                                                                                          operational demands. Completion
                                                                                   programme in August 2025.                                                                                                    anticipated in Q1/2 FY25/26.

 1.2.1   Continue to deliver the Noosa Bushland         Strategy and               Program planning completed             1.3.3    Identify high-risk erosion prone areas of the     Strategy and               Progress through the High-Risk
         Reserve Strategic Fire Management              Environment                for 2025 burns. Planned burns                   Climate Change Adaption Plan (CHAP) and           Environment                Erosion Prone Area Working Group
         Plan 2021 and deliver planned burns and                                   being undertaken as weather and                 scope an ongoing management program.                                         has stalled due to staff vacancy
         mechanical fuel reduction where conditions                                conditions allow throughout Q4.                                                                                              and changes. A Noosa Eastern
         allow in priority reserves, based on a                                    As we are at the mid-point of the                                                                                            Beaches Creek Erosion Risk study
         comprehensive bushfire risk assessment.                                   programme, we will not have a                                                                                                has been delivered by consultants,
                                                                                   clear picture of completion until Q1                                                                                         covering geotechnical, hydrological
                                                                                   reporting of FY25/26.                                                                                                        & vegetation assessments at the
                                                                                                                                                                                                                nine creeks along the Eastern
1.2.2    Continue to deliver a Community Bushcare       Strategy and               Annual programme for all Volunteer                                                                                           Beaches. Assessments were used
         Program for active volunteers across           Environment                Bushcare groups successfully                                                                                                 to identify slope stability risks,
         bushland care groups and undertake a                                      delivered.                                                                                                                   including urgent, short, medium
         review of the Community Bushland Care                                                                                                                                                                  and long term actions to reduce




                                                                                                                                                                                                                                                       Noosa Council Annual Report 24/25
         Guideline.                                                                                                                                                                                             these risks. Actions vary from
                                                                                                                                                                                                                urgent remediation works through
1.3.2    Initiate the implementation of the Eastern     Strategy and               Education material is complete, and                                                                                          to longer term revegetation and
         Beaches Foreshore Management Plan              Environment                the public awareness campaign                                                                                                weed control.
         2023 focusing on education and awareness                                  has started. A restoration program
         of the social and environmental values of                                 is underway within available budget    1.5.2    Review the Conservation Land Plan/Policy to       Strategy and               To be reported to Council in
         foreshores, and key management issues.                                    and resourcing, and the beach                   provide a clear methodology for identifying       Environment                September 2025. Some delays
                                                                                   infrastructure access manual is                 land parcels for consideration of purchase                                   in delivery due to further review
                                                                                   nearing completion (80%).                       (via the Environment Levy) for inclusion in the                              requirements following a Councillor
                                                                                                                                   Voluntary Conservation Agreement program                                     workshop.
1.3.4    Implement the Encroachments Policy             Strategy and               Ongoing implementation program                  or the Land for Wildlife program.
         and Operational procedure, including the       Environment                underway. Recovery plans have
         development of a community education and                                  been developed for the esplanade        1.6.1   Finalise and initiate implementation of the       Strategy and               Delayed to FY2025/26. This
         awareness campaign to guide community                                     south of the ferry – associated                 Noosa River Catchment Management                  Environment                initiative will now be advanced
         use and management of council managed                                     works to be undertaken in FY25/26.              Plan to help protect catchment values and                                    as part of the SEQ Resilient
         land.                                                                     Works at Lorikeet Dr, Peregian                  ecosystem services                                                           Rivers Program for preparing a
                                                                                   Beach, have been completed.                                                                                                  Catchment Action Plan. Council is
                                                                                                                                                                                                                being supported with funding via
 1.7.3   Manage flying fox impacts on the community     Strategy and               SoMI implemented for the Kin                                                                                                 Resilient Rivers and resourcing to
         in accordance with the Noosa Council           Environment                Kin roost, following community                                                                                               assist in preparing the Noosa River
         Statement of Management Intent (SoMI) and                                 concern due to seasonal increase                                                                                             Catchment Management Plan.
         through community education.                                              in flying fox population. Additional                                                                                         Community engagement on a Draft
                                                                                   resources being applied to                                                                                                   plan will occur in 2026.
                                                                                   monitoring and impact assessment
                                                                                   in Q1 of FY25/26.                       1.7.1   Initiate implementation of the Noosa              Strategy and               Action Plans for Koala
                                                                                                                                   Threatened Fauna Roadmap including the            Environment                Conservation and Sea Turtle are
 1.8.1   Complete the review of the Noosa               Strategy and               Draft Design Principles document                development of 2 action plans per year for                                   nearing completion (95%).
         design principles including incorporating      Environment                prepared and presented at                       priority threatened species identified in the
         sustainable design to embed climate                                       Councillor workshop in April 2025.              Noosa Threatened Fauna Roadmap.
         resilience, nature positive and low carbon                                Kabi Kabi engagement completed
         considerations into the principles, and                                   in July 2025. The draft document        1.7.2   Initiate a review of the Koala Conservation       Strategy and               The final draft has been completed
         promote and increase awareness with key                                   is now finalised for external                   Plan to ensure recovery and conservation          Environment                and is undergoing internal review in
         stakeholders.                                                             key stakeholder engagement                      strategies are aligned with contemporary                                     Q1 FY25/26.
                                                                                   (designers and industry                         populations and threats.
                                                                                   organisations).

1.8.2    Continue to implement best practice            Development and            Implementation continuing.
         Development Assessment services that           Regulation
         deliver the strategic outcomes of the Noosa
         Plan 2020.

                                                           58                                                                                                                           59

Section 31

Theme 2 — Liveability                                                                                                       Key Actions

                                                                                                                            No.   Description                                          Comment                                                % Complete

                                                                                                                             1    Develop and implement updated master and             NLC’s Needs & Options Study is complete, NAC              45
                                                                                                                                  business plans for Council’s major community         Upgrade Plan is complete, Libraries Plan is
                                                                                                                                  facilities: the Noosa Leisure Centre (NLC),          currently in draft, Cemeteries Plan is currently in
                                                                                                                                  Noosa Aquatic Centre (NAC), The J, Libraries,        draft. Work will be ongoing across the life of the
Highlights                                                                                                                        Cemeteries and Noosa Community Support.              Corporate Plan.

                                                                                                                             2    Complete community infrastructure audit and          Major delay due to lack of funding and resources for       0
— Floating Land 2025 Biennale: Completed all preparatory activities for the successful delivery of the                           needs assessment to determine current and            the Community Strategy. Anticipated to commence
                                                                                                                                  future needs.                                        in FY25/26 and progress over 12 months.
  Biennale Floating Land 2025 event, facilitating a dynamic platform that brings contemporary arts and
  culture to the community. This included coordinating logistics, engaging artists and stakeholders, and                     3    Complete the feasibility of the potential ReGen      Feasibility is complete. Major project will not           100
                                                                                                                                  Physical and Wellbeing Hub and commence              progress however concept and components have
  promoting community participation to ensure a vibrant and impactful cultural experience.                                        implementation of outcome.                           been incorporated into the Leisure Centre Options
— Wastewater treatment system auditing program: A proactive audit of properties in Kin Kin with                                                                                       Study. Some elements also included in Noosa
                                                                                                                                                                                       District Sports Complex grant applications.
  Wastewater Treatment Plants (WTP) was completed and further audits are planned across the Shire to
                                                                                                                             4    Complete Non-Powered Water Sports Feasibility        Completed and adopted. Concepts incorporated              100
  ensure WTPs are working effectively and keeping our waterways and community safe.                                               Project.                                             into ongoing work such as Noosa Foreshore
— Pathways & Cycleways: Council maintained pathway standards through the renewal program and                                                                                          Infrastructure Master Plan.
  delivered the Cycling and Walking Implementation Plan to guide the planning, development, and                              5    Develop plan to guide and increase arts and          Partially complete. Council’s Public Art Policy           50
  promotion of active transport networks across the shire. environmental impact.                                                  culture in public spaces.                            complete and adopted. New Cultural Plan is
                                                                                                                                                                                       currently in draft. Work will be ongoing across the
                                                                                                                                                                                       life of the Corporate Plan.

Corporate Plan 2023 – 2028 Performance Progress                                                                              6    Complete investigations of both Cooroy and           Investigations are complete and presentations are         90




                                                                                                                                                                                                                                                           Noosa Council Annual Report 24/25
                                                                                                                                  Noosa Shire Business centre transit hubs.            scheduled in the near future with Councillors to
                                                                                                                                                                                       share outcomes.

 Signature Projects                                                                                                          7    Redevelop Noosa Heads Bus interchange as an          Design Options report was completed in 2023.               10
                                                                                                                                  iconic arrival point to Noosa Heads.                 Further investigation has not commenced and
                                                                                                                                                                                       awaiting precinct planning outcomes as the
 No.   Description                                       Comment                                               % Complete                                                              project cannot be designed in isolation to the
                                                                                                                                                                                       adjacent Noosa Parade, Lions Park, Maze Carpark
  1    Deliver Noosa Housing Strategy.                   Progressing well, noting this is a 5 to 10-year          50                                                                   and Main Beach Reserve.
                                                         Strategy.
                                                                                                                             8    Accelerate delivery of Cycling and Walking           The Noosa Biosphere Trail Network has been                50
  2    Develop Community Strategy.                       Major delay due to lack of funding and resources,         0              Implementation Plan and Noosa Trails                 significantly advanced through the grant funding
                                                         some resourcing to be provided in FY25/26 to                             Implementation Plan.                                 and Council co-contribution with Woondum and
                                                         commence development and progress over two                                                                                    Wahpunga Trails receiving significant funding.
                                                         to three years.                                                                                                               Walking and cycling paths have advanced with
                                                                                                                                                                                       the grant funded program for the replacement
  3    Deliver Living Well Program.                      Living Well Program established and now ongoing.         50
                                                                                                                                                                                       of the Noosa Drive pathway, completion of the
                                                         Program is being expanded in FY25/26 due to
                                                                                                                                                                                       Noosa Parade Stage 2 Cycle Path Design and the
                                                         success in obtaining external funding.
                                                                                                                                                                                       Peregian Beach Active Street. Council funded
  4    Implement Master Plan for Cooroy Sports           Minor infrastructure issues resolved e.g., fencing.      20                                                                   program include the Local Links program of other
       Complex.                                          Major infrastructure upgrades underway e.g.,                                                                                  $1million per year in construction of missing link
                                                         expansion of gym, lighting upgrade, tenure, and                                                                               footpaths.
                                                         boundary elements under review. Work will be
                                                                                                                             9    Investigate and implement a new revenue system       Progressing - Increase to differential rate for           50
                                                         ongoing across the life of the Corporate Plan.
                                                                                                                                  which ensures visitors contribute to the provision   transitory completed as part of budget, ensuring
  5    Implement Master Plan for Noosa District Sports   Major delay due to lack of success in funding             15             and maintenance of transport facilities and          short stay properties contribute more. Draft
       Complex.                                          applications. Some implementations in ancillary                          services they utilise.                               Parking Management Plans prepared, including
                                                         areas e.g., Olive Donaldson, Netball clubhouse.                                                                               indicative paid parking areas. Visitor charge and
                                                         Work will be ongoing across the life of the                                                                                   paid parking will be tested through the Destination
                                                         Corporate Plan.                                                                                                               Management Plan.

  6    Prepare a new Movement Strategy and               The Transport and Traffic Team have now                  50        10    Continue to implement the Short Stay Letting         Significant progress has been made implementing           100
       Connectivity Strategy (implementation plan for    been fully recruited following two years of                              Local Law to manage the impacts of short-term        the local law, capturing all properties, undertaking
       Noosa Transport Strategy for FY25-27).            significant vacancies. Two workshops have been                           letting.                                             compliance and development of reporting
                                                         undertaken with Councillors to define priority                                                                                dashboards. An operational review has significantly
                                                         transport projects in the next two years, pending                                                                             progressed with input from stakeholder to further
                                                         major review of the Transport Strategy. The                                                                                   enhance the effectiveness of the local law and
                                                         implementation plan is currently being drafted                                                                                managing the impacts from SSL
                                                         and presented to Councillors in a subsequent
                                                         workshop.


                                                          60                                                                                                                             61

Section 32

Operational Plan 2024 – 2025 Performance Progress                                                                            On Track Initiatives

                                                                                                                             OP Ref   Initiative                                       Lead Service Area Status   Comments
Completed Initiatives
                                                                                                                              2.1.1   Continue to implement key actions of the         Strategy and               The Housing Strategy update and
OP Ref   Initiative                                                      Lead Service Area         Status   Date Delivered            Noosa Housing Strategy including:                Environment                proposed Housing Monitoring
                                                                                                                                      – Development of a Housing Monitoring                                      program were reported to Council
 2.2.3   Maintain the standard of pathways throughout the shire          Infrastructure Services             30/06/2025                  program.                                                                 in March 2025. Housing Monitoring
         through the delivery of the pathway’s renewal program.                                                                       – Partnering with State Housing Department,                                report is being prepared and
                                                                                                                                         Community Housing providers and industry                                 external service provider engaged
                                                                                                                                         to advance the planning and development                                  for data analysis.
 2.3.1   Finalise and commence implementation of the Public Art          Community Services                  14/03/2025
                                                                                                                                         of affordable housing.
         Policy to improve the character and aesthetics of public
                                                                                                                                      – Continue site investigations at Lake                                     Engagement with the State
         spaces.
                                                                                                                                         Macdonald Drive, Cooroy, for affordable                                  government for State-driven
                                                                                                                                         housing outcomes.                                                        development continues. The
 2.3.2   Prepare for the delivery of the biennale Floating Land 2025     Community Services                  30/06/2025
                                                                                                                                      – Identifying grant and funding opportunities                              State government confirmed a
         event which brings arts and culture to a contemporary
                                                                                                                                         for affordable housing outcomes.                                         social housing development of 32
         community.
                                                                                                                                                                                                                  dwellings in Tewantin and purchase
 2.4.3   Deliver the Cycling and Walking Implementation Plan to guide    Infrastructure Services             30/06/2025                                                                                           of an additional site.
         Council’s planning, development and promotion of bike and
         walking networks in the future.                                                                                                                                                                          Site investigations completed
                                                                                                                                                                                                                  at 62 Lake Macdonald Drive,
 2.5.3   Complete community halls Disability Discrimination Act          Development and                     01/02/2025                                                                                           community engagement
         (DDA) compliance and asset management condition                 Regulation                                                                                                                               undertaken and report submitted
         assessments to ensure quality, accessible and fit for purpose                                                                                                                                            to Council presenting revised site
         community facilities.                                                                                                                                                                                    option. Tender process has been
                                                                                                                                                                                                                  completed, and the report will be
 2.6.2   Review and complete the Community Grants program and            Community Services                  23/01/2025                                                                                           presented to Council in July 2025.




                                                                                                                                                                                                                                                          Noosa Council Annual Report 24/25
         policy to further support community organisations to deliver
         community development initiatives.                                                                                                                                                                       Tenders under review for master
                                                                                                                                                                                                                  planning of Council sites for
 2.8.1   Deliver the Living Well Noosa program to improve the health     Community Services                  01/02/2025                                                                                           affordable housing using grant
         and well-being of the community.                                                                                                                                                                         funding; proposed planning
                                                                                                                                                                                                                  scheme amendments on housing
 2.8.2   Undertake a proactive auditing programme of wastewater          Development and                     30/06/2025                                                                                           affordability awaiting Minister’s
         treatment systems to keep community safe and maintain           Regulation                                                                                                                               sign-off submitted February 2025.
         water quality and the health of waterways.
                                                                                                                              2.1.2   Continue to implement and monitor the Short      Development and            Short Stay Local Operational
                                                                                                                                      Stay Letting Local Law to manage the impacts     Regulation                 Review has significantly progressed.
                                                                                                                                      of short-term letting.                                                      The stakeholder survey has been
                                                                                                                                                                                                                  completed and the feedback
                                                                                                                                                                                                                  reviewed. Stakeholder roundtable
                                                                                                                                                                                                                  session completed, feedback from
                                                                                                                                                                                                                  roundtable included completed
                                                                                                                                                                                                                  briefing to Council. Report with
                                                                                                                                                                                                                  recommendations to be presented
                                                                                                                                                                                                                  at August 2025 round of Council
                                                                                                                                                                                                                  meetings.

                                                                                                                              2.2.1   Complete the upgrade of the Woondum              Infrastructure             Project Reference Group has been
                                                                                                                                      and Wahpunga trails in accordance with           Services                   re-established to guide scope
                                                                                                                                      the Noosa Biosphere Trails Master Plan                                      of works. On the ground works
                                                                                                                                      to improve the condition of trails, increase                                has commenced, with ongoing
                                                                                                                                      connectivity between Cooran, Kin Kin and                                    procurement and scope refinement
                                                                                                                                      Lake McDonald, and recreational activity.                                   underway for remaining works
                                                                                                                                                                                                                  to meet grant obligations. QPWS
                                                                                                                                                                                                                  permit Section 34 application for all
                                                                                                                                                                                                                  trails progressing well. This project
                                                                                                                                                                                                                  is funded until November 2026.

                                                                                                                              2.4.1   Complete and deliver the Movement                Strategy and               Review of actions included in
                                                                                                                                      and Connection Delivery Plan to improve          Environment                the Transport Plan and Cycling
                                                                                                                                      transport links, walking and cycling                                        and Walking Strategy has been
                                                                                                                                      connections and movements.                                                  undertaken. A draft Delivery Plan
                                                                                                                                                                                                                  has been prepared for internal
                                                                                                                                                                                                                  review. The draft was discussed at
                                                                                                                                                                                                                  Councillor workshop in April 2025.



                                                             62                                                                                                                           63

Section 33

On Track Initiatives                                                                                                             Disrupted Initiatives

OP Ref   Initiative                                         Lead Service Area Status   Comments                                 OP Ref Initiative                                        Lead Service Area Status   Comments

2.4.2    Commence a Northern Sunshine Coast Public          Infrastructure             The Noosa Shire Council Parking           2.2.2   Finalise the Noosa Botanic Gardens              Infrastructure             Stakeholder Reference Group, meetings &
         Transport Strategy including advocating            Services                   and Transport Strategy (NSCPTS)                   Master Plan to help guide future                Services                   initial public consultation complete. Draft to be
         with DTMR for the finalisation of the strategy                                is progressing as scheduled. Team                 improvements and enhance the visitor                                       submitted to Council in September 2025 for
         and undertaking investigations into the                                       members have actively participated                experience.                                                                endorsement and final public consultation.
         Cooroy and Shire transit hubs to improve                                      in a recent workshop, contributing
         public transport connectivity in the shire for                                to the development of key                 2.4.4   Develop the Noosa Parking                       Infrastructure             The Parking Management Plan is currently on
         residents and visitors.                                                       priorities. Community consultation                Management Plan to guide our                    Services                   hold, pending the outcomes of the community
                                                                                       is anticipated to take place in                   approach to the management of                                              consultation for the Destination Management
                                                                                       September 2025, ensuring public                   parking throughout the shire.                                              Plan. The findings from that process will
                                                                                       views are integrated into the next                                                                                           help inform the direction and priorities of the
                                                                                       phase of strategy development.                                                                                               Parking Management Plan moving forward.

2.4.5    Embed the Go Noosa program including the           Infrastructure             The Go Noosa program was                  2.5.2   Continue to undertake the staged                Community                  Noosa District Netball Clubhouse rebuild
         free weekend and holiday bus program, as           Services                   delivered for the 2024/25 FY.                     implementation of Master Plans for              Services                   underway with an anticipated completion
         part of the Transport Strategy to reduce traffic                              An evaluation report was presented                the Cooroy and Noosa District Sports                                       in August 2025. Internal road upgrade at
         congestion and reduce emissions.                                              to Council in August 2025.                        Complexes (NDSC) to improve sport                                          NDSC subject to design and external funding
                                                                                                                                         and recreation facilities and increase                                     opportunities. Cooroy Sports Complex:
2.4.6    Undertake investigations into the Noosa            Infrastructure             Consultant has been appointed to                  participation in sports.                                                    - Field lighting upgrades to be completed and
         Woods Jetty as potential ferry stop location       Services                   lead the investigation and targeted                                                                                              handed over by August 2025.
         as a means of public transportation, and to                                   stakeholder engagement has                                                                                                    - Gymnastics and multi-use area upgrades
         provide increased access to Noosa Woods.                                      occurred to inform consultants initial                                                                                           detailed design has been completed, now
                                                                                       findings. Councillor workshop was                                                                                                awaiting final costings and approval to go to
                                                                                       undertaken in July 2025 to present                                                                                               tender for construction.
                                                                                       the Phase 1 findings. This will lead                                                                                          - Internal road and car park upgrades on hold
                                                                                       into Phase 2 Concept Design                                                                                                      until capital works allocation allocated.




                                                                                                                                                                                                                                                                        Noosa Council Annual Report 24/25
                                                                                       development and subsequent
                                                                                       broader community engagement.             2.5.5   Finalise the review of community                Development and            A second Councillor workshop has been held,
                                                                                                                                         purpose land and the Infrastructure             Regulation                 during which the need for further external
 2.5.1   Complete a new Noosa Libraries Business            Community                  As of Q4, the Libraries Plan has                  Tenure Policy to provide a consistent                                      stakeholder consultation was identified. The
         Plan to ensure the delivery of a well-planned      Services                   been graphically designed and is                  framework to ensure the equitable                                          additional consultation extends the timeframe,
         service that meets community needs.                                           undergoing final edits before being               use of community purpose land and                                          with completion of the review and adoption
                                                                                       implemented in early FY25/26.                     infrastructure within is utilised to its full                              of the updated policy expected to occur in FY
                                                                                                                                         potential.                                                                 25/26.
2.5.4    Commence the design process for an                 Infrastructure             Design Brief and amenities siting
         Accessible Adult Change Facility as part of        Services                   completed. Consultant has                 2.6.1   Undertake the preparatory phase for             Community                  No internal staffing or funding for external
         the Noosaville Foreshore Management Plan.                                     completed a Concept Design. A                     the proposed development of a new               Services                   resourcing is available to begin this piece of
                                                                                       Councillor briefing on the concept                Community Strategy which outlines                                          work this quarter and this is unlikely to change
                                                                                       scheduled for July 2025 with                      the community’s vision for Noosa and                                       for the remainder of the financial year.
                                                                                       targeted stakeholder engagement                   guides planning and decision making.
                                                                                       to follow.
                                                                                                                                 2.7.1   Complete Noosa Cemeteries Plan                  Community                  Consultation has been undertaken with key
2.5.6    Provide inclusiveness coaching support to          Community                  Council’s Inclusion Coach continues               to guide the future management                  Services                   stakeholders. Draft has been completed and
         community groups to increase community             Services                   to implement and deliver the                      of council’s cemeteries and ensure                                         is currently under internal review. Progress
         participation for people with disabilities.                                   Sport4All program across the shire                cemetery services meet future                                              constrained by available resourcing.
                                                                                       working with schools and clubs.                   demand.

                                                                                       To date, 21 sports clubs and four         2.7.3   Investigate a new revenue system                Infrastructure             Paid parking and congestion charging
                                                                                       schools have engaged with the                     which ensures visitors contribute to            Services                   were investigated as part of the Parking
                                                                                       program. Assisted skateboarding                   the provision and maintenance of                                           Management Plan and in line with the project
                                                                                       was included in the recent Noosa                  transport facilities and services they                                     scope and findings presented to Councillors in
                                                                                       Skate 2025 Peregian Day in the Park               utilise.                                                                   a series of workshops. Further refinement will
                                                                                       with a specialised frame enabling                                                                                            be informed by findings from the community
                                                                                       wheelchair-bound participants                                                                                                consultation process from the Destination
                                                                                       the opportunity to experience                                                                                                Management Plan.
                                                                                       skateboarding.
                                                                                                                                 2.7.4   Continue to progress asset                      Community                  Building condition assessment reports
 2.7.2   Complete a needs assessment for the Noosa          Community                  NLC Needs Assessment completed                    management planning for council’s               Services                   (BCARs) 40% completed with further BCARs
         Leisure Centre (NLC) and Noosa Aquatic             Services                   with further work required to                     community services buildings and                                           delayed due to resourcing. Additional BCARs
         Centre (NAC) to provide a basis on which                                      progress project into next stages                 community infrastructure to ensure                                         expected to recommence by the end of
         the sporting needs of the community are                                       and NAC project at latter stages of               their ongoing suitability to meet the                                      August 2025 with one due for completion
         determined.                                                                   delivery.                                         functional needs of current and future                                     by December 2025. 28% of comprehensive
                                                                                                                                         users.                                                                     Asset Management Plans (AMPs) near
                                                                                                                                                                                                                    completion. Progress constrained by available
                                                                                                                                                                                                                    resourcing.



                                                               64                                                                                                                                     65

Section 34

Theme 3 — Prosperity
                                                                                                                               Operational Plan 2024 – 2025 Performance Progress

                                                                                                                               Completed Initiatives

                                                                                                                               OP Ref   Initiative                                                            Lead Service Area          Status     Date Delivered

Highlights                                                                                                                      3.1.3   Progress the embedding of sustainable procurement
                                                                                                                                        practices into Council’s procurement of services and
                                                                                                                                                                                                              Corporate Services                     30/06/2025

                                                                                                                                        products, through the adoption of a formal policy position,
                                                                                                                                        as well as developing an education, measurement, and
— Sustainable Procurement: Embedded sustainable practices into Council’s procurement processes
                                                                                                                                        reporting framework.
   through adoption of a formal policy position, alongside the development of education, measurement, and
                                                                                                                                3.2.1   Progress investigation of a future skills learning hub and            Strategy and                           25/04/2025
   reporting frameworks.                                                                                                                Skills Plan to identify current and future skill needs for priority   Environment
— Waste & Resource Recovery: Procurement initiated for the design, construction, commissioning, and                                    Noosa businesses.
    handover of a green waste composting facility. Feasibility study and technical enquiries for a solar farm                   3.6.1   Complete stage 3 of the Regional Art Gallery Feasibility              Community Services                     02/12/2024
    completed. Development plans and application for the Transfer Station redesign submitted.                                           Project including a Business Plan for council’s consideration.




Corporate Plan 2023 – 2028 Performance Progress
                                                                                                                               On Track Initiatives

 Signature Projects                                                                                                            OP Ref   Initiative                                           Lead Service Area Status        Comments

                                                                                                                                3.1.2   Implement the Noosa Economic Development             Strategy and                    Ongoing delivery of Noosa Smart




                                                                                                                                                                                                                                                                       Noosa Council Annual Report 24/25
 No.   Description                                         Comment                                                % Complete
                                                                                                                                        Smart Biosphere Strategy (NEDS) Action               Environment                     Biosphere Economic Development
  1    Regional Art Gallery Project Feasibility Project.   Stage 2 Feasibility Study Complete; Stage 3               60                 Plan and identify and advance priority                                               (Action) Plan and priorities including:
                                                           Business Case Complete; Stage 4 Funding                                      projects including the activation of strategic                                        - Development of Destination
                                                           Options and Staging Plan to be undertaken in                                 employment land.                                                                         Management Plan (November
                                                           FY25/26. Work will be ongoing across the life of the                                                                                                                  2025 adoption anticipated)
                                                           Corporate Plan.                                                                                                                                                    - Gold Eco-Destination
                                                                                                                                                                                                                                 Accreditation (Ongoing)
  2    Transform waste management practices in line        Waste Plan is complete and is ongoing with waste          100                                                                                                      - Development of Noosa Council
       with the new Waste Strategy.                        diversion target being met. Council is actively                                                                                                                       Events Strategy (First draft moved
                                                           seeking partnership funding to implement                                                                                                                              to Q2 FY25/26)
                                                           innovative waste management technologies at its                                                                                                                    - Implementation of Green
                                                           Resource Recovery Area supported by a new site                                                                                                                        Economy Plan, including
                                                           Master Plan to support new practices.                                                                                                                                 activation of Circularity Precinct
                                                                                                                                                                                                                                 in collaboration with Waste
  3    Finalise Green Economy Industry Development         Complete                                                  100                                                                                                         Management, building capacity
       Plan.                                                                                                                                                                                                                     in green businesses and auditing
                                                                                                                                                                                                                                 Noosa’s Electric Vehicle capacity
 Key Actions                                                                                                                                                                                                                     and enabling infrastructure
  1    Complete the next stage of the Peregian Digital     Complete - Successfully providing ongoing                 100                                                                                                         needs in collaboration with
       Hub and continue to invest in the ongoing           support to tech and innovation.                                                                                                                                       Waste Management Branch
       development of Noosa’s position as a technology                                                                                                                                                                           (Circularity Precinct Ongoing/EV
       and innovation hub.                                                                                                                                                                                                       Infrastructure Audit Q1 FY25/26)
                                                                                                                                                                                                                              - Industry Development Plans -
  2    Complete Shire Wide Employment Land Review          Complete - implementation of actions underway.            100                                                                                                         including Food & Beverage and
       and implement actions from this plan.                                                                                                                                                                                     Education (Ongoing)
                                                                                                                                                                                                                              - Food and Agribusiness Hub Proof
  3    Develop a Food and Agribusiness Industry            Delayed.                                                   0                                                                                                          of Concept scheduled for Q1
       Development Plan.                                                                                                                                                                                                         FY25/26
                                                                                                                                                                                                                              - Business Support Programs
  4    Advance sustainable procurement policies and        Progressing - Scope is currently being finalised.         20
                                                                                                                                                                                                                                 (Business Boost/ECDEV Grant/
       practices for Council’s procurement of services
                                                                                                                                                                                                                                 Capability Workshops and
       and products.
                                                                                                                                                                                                                                 Industry Communications
                                                                                                                                                                                                                                 completed for FY24/25




                                                            66                                                                                                                                   67

Section 35

On Track Initiatives                                                                                                      On Track Initiatives

OP Ref   Initiative                                      Lead Service Area Status   Comments                              OP Ref   Initiative                                      Lead Service Area Status   Comments

 3.3.1   Advance the preparation of a Food and           Strategy and               Industry Development Plan (Sched-      3.8.1   Initiate scoping and seek grant or external     Strategy and               The grant application for Cities Deal
         Agribusiness Industry Development Plan          Environment                uled for completion in Q1 FY25/26).            funding to advance the concept of Noosa         Environment                funding to create a smart mobility
         and progress key actions with the Food and                                                                                Shire as a ‘Living Lab’ – partnering with                                  lab in the Peregian Digital Hub
         Agribusiness Network (FAN).                                                Food and Agribusiness Network                  industry and research organisations to                                     precinct was unsuccessful. Council
                                                                                    (FAN) Partnership Agreement com-               investigate, use data and technology to                                    continues to work with the adjacent
                                                                                    pleted and signed.                             develop innovative solutions for Noosa.                                    landowner within the innovation
                                                                                                                                                                                                              precinct about synergies with the
 3.7.1   Develop the Noosa Landfill and Resource         Infrastructure             Key projects within stage 1 of the                                                                                        proposed development of that site.
         Recovery Facility Master Plan to provide        Services                   Masterplan have advanced with a
         future direction in the management of the                                  Development Application lodged                                                                                            The scope and opportunity for
         Resource recovery centre and maximise                                      in February 2025 for Council                                                                                              advancing Living Lab is progressing
         waste diversion and minimisation practices.                                consideration to provide for a                                                                                            through the development of the
                                                                                    shovel ready project. Grant funding                                                                                       investment Road Map to Net Zero
                                                                                    application has been submitted                                                                                            Emissions and implementation of
                                                                                    with the Federal Government. High                                                                                         Smart Biosphere Strategy priorities.
                                                                                    level concept designs completed.                                                                                          Formalising this program will require
                                                                                    Waiting on funding update.                                                                                                further consideration.

3.7.2    Implement best practice waste management        Infrastructure             Waste Plan 2023-2027 action
         practices and continuous improvement            Services                   tracker has been developed with a
         across all waste functions and assets to                                   project plan to support delivery of
         support the principles of the waste hierarchy                              key milestones. This is monitored     Disrupted Initiatives
         and actions in the Waste Plan.                                             monthly by the team. Recent
                                                                                    environmental performance             OP Ref   Initiative                                      Lead Service Area Status   Comments
                                                                                    reporting has shown ongoing




                                                                                                                                                                                                                                                      Noosa Council Annual Report 24/25
                                                                                    reduction in carbon emissions and      3.1.1   Advance the Sustainable Procurement             Corporate                  Sustainable Procurement (SP)
                                                                                    waste diversion consistent with                Policy and establish practices for Council’s    Services                   Matrix review underway and SP
                                                                                    Waste Plan targets. A project plan             procurement of services and products.                                      ‘Pillars’ have been included on
                                                                                    for FY25/26 key waste plan actions                                                                                        Contract Number Request Forms
                                                                                    is being developed and will guide                                                                                         to commence capturing some
                                                                                    the monthly action plan reporting.                                                                                        data/information.
3.7.3    Complete feasibility studies and development    Infrastructure             Procurement process underway          3.4.1    Scope, prepare and initiate a pre-feasibility   Strategy and               Minor delay due to competing
         plans for new waste infrastructure projects     Services                   specific to compost facility, with             for a Food and Agri Business HUB                Environment                priorities - Initial scoping and
         incl. anerobic digestion, composting, biochar                              invitation to the open market to                                                                                          project plan scheduled for
         and solar and utilisation of landfill gas and                              design, construct, commission                                                                                             completion Q1 FY25/26.
         explore options and funding mechanisms.                                    and handover of a green waste
                                                                                    composting processing plant.          3.5.1    Complete amendments to Noosa Plan               Strategy and               Final amendments submitted to
                                                                                                                                   2020 to support and enable the Innovation       Environment                State February 2025, now awaiting
                                                                                    Feasibility study and preliminary              precinct at the Shire Business Centre to                                   Ministerial approval for adoption
                                                                                    technical enquiry for a solar farm             develop.                                                                   and commencement.
                                                                                    have been completed.
                                                                                                                                                                                                              Activation discussions continue
                                                                                    Development Plans and Application                                                                                         with Stockwell Group.
                                                                                    for the Transfer Station Redesign
                                                                                    have been submitted to DA.

                                                                                    Feasibility study for anerobic
                                                                                    digestion, biochar and utilisation
                                                                                    of landfill gas will be undertaken
                                                                                    as part of Stage 2 Master Planning
                                                                                    Activities.




                                                            68                                                                                                                        69

Section 36

Theme 4 — Future                                                                                                         Key Actions

                                                                                                                         No.      Description                                          Comment                                                % Complete

                                                                                                                          1       Continue to adequately plan for, prepare and         Ongoing. The Management Program has been                   100
                                                                                                                                  resource for, disaster management and recovery.      supplemented by the delivery of the dedicated
                                                                                                                                                                                       Local Disaster Co-ordination Centre. Disaster
                                                                                                                                                                                       reconstruction from 2022 (21 projects) has largely
Highlights                                                                                                                                                                             been delivered, especially the Black Mountain
                                                                                                                                                                                       Landslide Repair with the remaining project at
                                                                                                                                                                                       Schreibers Road to be completed in coming
— Engagement with Traditional Owners: Throughout the report year, 41 formal engagements were held                                                                                     months. Recovery improvements include an audit
   with KKPAC and the Kabi Kabi Land & Sea Rangers. Council has also finalised the internal Aboriginal                                                                                 of primary and secondary evacuation centres and
                                                                                                                                                                                       staged improvements to these e.g., upgrade of
   Cultural Heritage Act training program in partnership with KKPAC, which is scheduled for delivery                                                                                   bathroom facilities at the NLC, implementation of
   starting in FY25/26.                                                                                                                                                                Guardian Recovery module to improve planning,
                                                                                                                                                                                       delivery, and monitoring of recovery actions. Work
— Tourism Noosa: Council approved a revised 12-month agreement with Tourism Noosa to continue                                                                                         will be ongoing across the life of the Corporate
   joint efforts in managing tourism and to develop a roadmap outlining the future collaboration and                                                                                   Plan.

   arrangements between the two organisations.                                                                            2       Continue to adequately plan, prepare and resource    Ongoing                                                    50
                                                                                                                                  for climate change resilience.
— Disaster Recovery Plan: Reconstructed Back Mountain Road following a significant landslide, restoring
  full access and ensuring the road meets safety, resilience, and engineering standards. The works                        3       Uphold, monitor, maintain and amend the Noosa        Ongoing                                                    100
                                                                                                                                  Plan as required to ensure it remains contemporary
  included stabilisation, drainage improvements, and resurfacing to enhance long-term durability and                              and responsive to other Council strategies and
  reduce future risk.                                                                                                             community needs.

                                                                                                                          4       Complete an Advocacy Plan that addresses top 10      Complete                                                   100




                                                                                                                                                                                                                                                             Noosa Council Annual Report 24/25
                                                                                                                                  shire-wide issues and infrastructure needs.
Corporate Plan 2023 – 2028 Performance Progress                                                                           5       Identify and implement a contemporary revenue        Progressing and ongoing                                    40
                                                                                                                                  diversification and strategic investment approach
                                                                                                                                  that identifies innovative and alternate revenue
 Signature Projects                                                                                                               streams for Council.


 No.   Description                                     Comment                                              % Complete

  1    Reconciliation Action Plan (RAP) project.       RAP delayed in consultation with Kabi; Kabi Kabi         10
                                                       Commitment complete, Relationship Agreement
                                                       nearly finalised - major progress on relationship,
                                                       engagements and Kabi Commitment. Work will be
                                                       ongoing across the life of the Corporate Plan.                    Operational Plan 2024 – 2025 Performance Progress
  2    Develop an Olympics and Paralympics Plan.       Pre-planning and stakeholder engagement work             15
                                                       underway. More formalised preparation will
                                                       commence in FY25/26 with the employment of a                      Completed Initiatives
                                                       dedicated project officer.

  3    Complete and implement the Destination          Draft for Engagement nearing completion.                60        OP Ref      Initiative                                                      Lead Service Area          Status      Date Delivered
       Management Plan (DMP)
                                                                                                                          4.4.2      Complete the Advocacy Plan that addresses top 10 Shire          Strategy and                            01/04/2025
  4    Advance the Sunshine Coast and Noosa Regional   Complete - Project finalised as at June 20 2025.        100                   wide issues and infrastructure needs.                           Environment
       Climate Action Roadmap.

  5    Develop an Urban Greening Program.              Phase 1 complete - Future phase on hold pending         25         4.6.2      Develop and maintain relationships with key Brisbane 2032       Community Services                     30/06/2025
                                                       funding.                                                                      stakeholders

  6    Implement Noosa Placemaking Program.            Program implemented - Policy developed and              75         4.8.2      Deliver Disaster preparedness, Resilience and Recovery          Infrastructure Services                 31/03/2025
                                                       endorsed - Pilot Program complete. Pomona Place                               activities to support Council and the broader community.
                                                       Plan complete - now moving into implementation




                                                        70                                                                                                                               71

Section 37

On Track Initiatives                                                                                                          On Track Initiatives
                                                       Lead Service                                                                                                                  Lead Service
OP Ref   Initiative                                                   Status   Comments                                       OP Ref   Initiative                                                   Status   Comments
                                                       Area                                                                                                                          Area
 4.1.1   Continue to engage with our traditional       Strategy and            Forty-one (41) formal engagements              4.8.4    Continue the implementation of the Coastal    Strategy and            Phase 2 of the Coastal Wetland
         owners and ensure cultural heritage and       Environment             held over FY24-25 with KKPAC and                        Hazards Adaptation Plan (CHAP), including     Environment             Restoration Project with University of
         indigenous values are incorporated into key                           the Kabi Kabi Land & Sea Rangers. The                   planning for Living Foreshores Noosa,                                 Queensland and KKPAC is underway.
         projects.                                                             Relationship Agreement and Kabi Kabi                    Coastal Wetland Restoration Project.                                  An initial site assessment on Cooloothin
                                                                               Commitment Implementation Plan are in                                                                                         Creek Nature Refuge has been
                                                                               final draft form. Council has also finalised                                                                                  undertaken and grant funding is being
                                                                               the internal Aboriginal Cultural Heritage                                                                                     sought through QCoast2100 Round 3.
                                                                               Act training program in partnership                                                                                           The Living Foreshores Noosa project
                                                                               with KKPAC and scheduled for delivery                                                                                         continues to progress, with works at Hilton
                                                                               starting in FY25/26.                                                                                                          Esplanade scheduled to recommence in
                                                                                                                                                                                                             Q1 FY25/26.
 4.2.1   Complete the Destination Management           Strategy and            Individual Project Control Group (PCG)
         Plan, integrating community feedback for      Environment             and External Reference Group meetings           4.9.1   Progress the development of a program for     Strategy and            Internal revenue diversification working
         Council endorsement, and commence                                     (15 meetings) were undertaken. Feedback                 long term implementation of contemporary      Environment             group continue to meet, to advance a
         cross-council implementation of priority                              from these meetings were included in the                revenue diversification and a strategic                               pipeline of work supported by the new
         actions.                                                              draft DMP document and presented to                     investment approach for innovative and                                Strategic Land Policy. Commercial
                                                                               Council for further consideration. Special              alternate revenue streams for council.                                diversification portfolio now sits within
                                                                               Meeting scheduled for August 2025 to                                                                                          the Economic Development team in
                                                                               endorse the draft DMP for the next phase                                                                                      Environment and Strategy Department.
                                                                               of community engagement.

 4.3.1   Develop initiatives/concept to facilitate     CEO Office              The process has been initiated to
         youth engagement in community                                         establish a Community Engagement
         engagement and decision making with the                               Feedback Panel, with steps being taken
                                                                                                                              Disrupted Initiatives




                                                                                                                                                                                                                                                           Noosa Council Annual Report 24/25
         goal of increasing youth representation.                              to ensure representation from a diverse
                                                                               cross-section of the community. Youth                                                                 Lead Service
                                                                               participation is being actively sought to      OP Ref   Initiative                                                   Status   Comments
                                                                               incorporate younger perspectives into the                                                             Area
                                                                               decision-making and feedback process.
                                                                                                                              4.2.2    Undertake a review of the Tourism Noosa       Strategy and            Council endorsed a revised 12-month
 4.5.1   Complete the Place Pilot Program in           Strategy and            Final Pomona Place Plan endorsed by                     Partnership Agreement to align with DMP       Environment             agreement at a Special Meeting in May
         Pomona and share learnings to improve         Environment             Council March 2025. Evaluation report to                outcomes.                                                             2025. Partnership Agreement (including
         the future of the program and inform future                           be submitted to Council in August 2025.                                                                                       Road Map) under review.
         planning for Pomona.                                                                                                                                                                                Awaiting Q4 Report from Tourism Noosa
                                                                                                                                                                                                             to enable Annual Review.
 4.6.1   Undertake preliminary planning for the        Community               Evaluation of the latest developments and
         Brisbane Olympics and Paralympics 2032        Services                actions on Games planning is continuing         4.4.1   Finalise the amendments to the Noosa Plan     Strategy and            Final amendments submitted to
                                                                               through CoMSEQ and broader Games                        2020 and seek to implement the Noosa          Environment             state in February 2025, now awaiting
                                                                               committees. Internal discussions with                   Housing Strategy 2022 to address housing                              Ministerial approval for adoption and
                                                                               relevant impacted portfolios have                       challenges faced by our residents.                                    commencement.
                                                                               commenced; however, the establishment
                                                                               of an internal working group has been           4.7.1   Develop the Emissions Offset strategy/plan    Strategy and            Roadmap to Net Zero Emissions project
                                                                               paused pending greater clarity on                       and road map towards Zero emissions for       Environment             is underway with a series of Councillor
                                                                               the overall Brisbane 2032 strategic                     council services.                                                     workshops. Minor delays experienced due
                                                                               direction. Council staff resourcing has                                                                                       to FY25/26 budget uncertainty for Waste
                                                                               been allocated in the 2025/26 budget to                                                                                       and Recovery Centre master planning,
                                                                               progress planning.                                                                                                            staff resource limitations, procurement,
                                                                                                                                                                                                             and grant applications. Completion is
4.8.3    Complete the implementation of the            Community               Majority of reconstruction projects                                                                                           anticipated for end of Q2 FY25/26
         Disaster Recovery Plan for the 2022 Floods    Services                complete including major Black Mountain
         & Rain Event.                                                         landslip. Final reconstruction project near     4.8.1   Advance the Sunshine Coast and Noosa          Strategy and            Project is complete and final reports
                                                                               completion. Human social Recovery Plan                  Regional Climate Action Roadmap by            Environment             have been received. QRA grant has been
                                                                               completed.                                              delivering the Regional Cascading Risks                               acquitted. Final Executive Steering Group
                                                                                                                                       and Critical Infrastructure Failure Project                           meeting was postponed to August 2025
                                                                                                                                       with Sunshine Coast Regional Council.                                 to align with Executive team availability.
                                                                                                                                                                                                             Report to ET and Council anticipated for
                                                                                                                                                                                                             September 2025.

                                                                                                                              4.8.5    Advance flood resilience projects including   Strategy and            The Climate Change Adaptation Program
                                                                                                                                       updating the Noosa River Flood Study, Six     Environment             Lead role has now been filled with most
                                                                                                                                       Mile Creek Flood Study and Noosa Flood                                flood projects back on track apart from
                                                                                                                                       Management Plan.                                                      Lake Entrance Blvd Flood Study Phase
                                                                                                                                                                                                             2. Noosa River & SMC Catchment Flood
                                                                                                                                                                                                             Study Updates have experienced delays.

                                                              72                                                                                                                            73

The text continues on section 38.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.