Council archive · source document
Noosa Council Annual Report 24/25
Very large file (20.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 84, section 1. The text section number identifies this passage in the reader.
Noosa Council
Notes to the Financial Statements
for the year ended 30 June 2025
Note 15. Property, Plant and Equipment (continued)
Index applied
Last (change in index Other interim
Valuation Comprehensive Key assumptions and estimates last applied to revaluation
Asset Class and Fair Value Hierarchy Approach Valuation Date Valuer engaged (related data sources) asset class) adjustment
Buildings (Level 2) Market Approach 30/06/2025 Australis Asset Derived from market transaction ABS Producer Nil
2025: $0.72m Advisory Group evidence involving comparable assets. Price Index 3020
2024: $0.0m Net method applied where accumulated Non-Residential
depreciation is eliminated against the building
gross amount of the asset. Data sources construction,
involve registered sale transactions, Queensland. No
agent advice on sales and lease indexation has
agreements or registered lease been applied as
transactions. Value of asset apportioned this asset class is
over relevant building components. subject to
comprehensive
revaluation in the
current year.
166
Buildings (Level 3) Current 30/06/2025 Australis Asset No active market due to the specialised ABS Producer Nil
2025: $83.1m replacement cost Advisory Group nature of the assets and the services Price Index 3020
2024: $75.0m local government buildings provide. Non-Residential
Valuations are determined using unit building
rates for construction taking into construction,
consideration industry standard cost Queensland. No
guides, project costs from recently indexation has
completed buildings. been applied as
Other inputs to cost, useful life and this asset class is
remaining life include economic value, subject to
legal and commercial obsolescence, comprehensive
industry standards, asset condition and revaluation in the
consumption rating applied. All buildings current year.
are separated into different components
with value determined based on a range
of interrelating factors. i.e. sub-structure,
superstructure, roof, electrical and
lighting, fitout and fittings, fire services,
HVA, mechanical and security services.
continued on next page ... Page 28 of 62
Noosa Council
Notes to the Financial Statements
for the year ended 30 June 2025
Note 15. Property, Plant and Equipment (continued)
Index applied
Last (change in index Other interim
Valuation Comprehensive Key assumptions and estimates last applied to revaluation
Asset Class and Fair Value Hierarchy Approach Valuation Date Valuer engaged (related data sources) asset class) adjustment
Other Infrastructure Assets (Level 3) Current 30/06/2021 Australis Asset No active market due to the specialised Indexation of Nil
2025: $66.1m replacement cost Advisory Group nature of services these assets provide. 6.85% applied in
2024: $54.1m Unit rates are developed by estimating FY25 equivalent
labour and materials required for asset to 2 years since
replacement. Base rates were sourced last
using actual contract prices for recently comprehensive
completed projects or supply quotes for valuation was
similar assets based on age, size, undertaken in
location and condition. Other inputs FY23. Indexation
considered include obsolescence, asset rate adopted from
condition and useful life. external valuer's
Where costs are not available, rates report prepared by
were obtained from the valuer's Australis Asset
167
database or the Rawlinson's Australian Advisory Group
Construction Handbook, 2021 Edition.
Roads (Level 3) Current 30/06/2023 Stantec Unit rates are developed using actual Indexation of Nil
2025: $498.4m replacement cost contract prices for recently completed 7.63% applied to
2024: $457.0m projects or supply quotes for similar bus stops and
assets based on age, size, location and 6.50% applied to
condition. other road assets
A first principles approach has been in FY25
applied to developing unit rates by equivalent to 2
estimating plant, material and labour years since last
inputs required for design and comprehensive
construction. valuation was
Where costs are not available rates were undertaken in
obtained from the valuer's database or FY23. Indexation
the Rawlinson's Australian Construction rate adopted from
Handbook, 2017 Edition. external valuer's
Roads are categorised as sealed or report prepared by
unsealed and separated into segments Stantec
with three location factors for urban, rural
and commercial/industrial. All segments
are then componentised into sub-classes
that make up each segment. i.e. road
surface, road pavement base, road
pavement sub-base, formation, kerb,
footpath, signage, etc. Other inputs
considered include obsolescence, asset
condition and useful life.
continued on next page ... Page 29 of 62
Noosa Council Annual Report 24/25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.