Attachment 3 - Construction Management Plan

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                     Westcon Site Management Pty Ltd

3.3       Communication

          Responsibilities, environmentally sensitive activities and environmental issues will be
          communicated to the relevant personnel through:

           • Initial project induction
           • Site project meetings
           • Tool box meetings


          Communications received from external parties will be maintained as normal records. All
          complaints relating to the construction activities must be recorded on the appropriate
          Action List with the following details:

           • Time, date and nature of complaint including urgency and significance
           • Type of communication (telephone, letter, personal etc)
           • Name, contact address and contact telephone number of complainant (note: if the
             complainant does not wish to be identified then ‘not identified’ is to be recorded)
           • Response and investigation undertaken as a result of the complaint
           • Names of persons responsible for receiving and/or investigating complaint
           • Action taken as a result of the complaint investigation and signature of responsible
             person

3.4       Records

          In order to provide evidence that environmentally sensitive activities are carried out in
          compliance with contract requirements and demonstrate effective operation of the
          Environmental Management System. Records are to be progressively generated and
          maintained for:

           • Manufacturer safety data sheets
           • Permits and licenses
           • Monitoring data
           • Training
           • Nonconformances and environmental infringements
           • Complaints
           • Corrective and preventative actions


4.        Management of Environmental Impacts

4.1       Land management

          The purpose of land management is to ensure that the extent of disturbance to land is to be
          the minimum required for the construction activities, and to prevent the contamination of
          land on or around the site.




Issue 2                 July 1                                                       Page 7
Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 259 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.