Attachment 3 - Construction Management Plan

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                           Westcon Site Management Pty Ltd



           • Specialist consultants are engaged to advise on particular environmental issues where
             required.

3.1.2 Employees

          All site personnel have the responsibility to:

           • Apply environmental principles to all daily activities.
           • Adhere to the environmental procedures provided in this CMP.
           • Report environmental accidents or incidents to the Director or Site Manager without
             delay.

          All site personnel are to be held accountable for compliance of environmental management
          in their activities.

3.1.3 Subcontractors

          All subcontractors operating on the site are required to comply with the requirements of
          this CMP, which will include:

           • Make their personnel available for induction and familiarization with the requirements
             of the CMP developed for the site.
           • Comply with work methods/procedures stipulated for their particular work areas.
           • Ensure that their plant and equipment conforms to the requirements stipulated for the
             site.
           • Meet regularly with the Director or Site Manager to discuss environmental management
             issues.
           • Subcontractor’s activities will be inspected from time to time to ensure compliance.


3.2       Training

          To ensure that all employees and contractors are aware of each of their individual
          responsibilities, training and awareness sessions will be provided, where required, which
          will include:

           • Initial project induction; and
           • Before environmentally sensitive activities are commenced.




Issue 2               July 1                                                       Page 6
Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 259 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.