6.0 Workshop Activities
The Director and Cabinetmaker are responsible for ensuring that environmental aspects of
the workshop are maintained including:
• Safe collection and disposal of oils and contaminated waste water
• Safe collection and disposal of metal and timber swarf
• Control of any workshop air quality
• Reduction of noise levels
The Director and Cabinetmaker are required to ensure that any other company personnel
entering the workshop comply with the abovementioned conditions.
Issue 2 July 1 Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.