Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Attachment 3 - Construction Management Plan

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                     Westcon Site Management Pty Ltd



6.0        Workshop Activities

          The Director and Cabinetmaker are responsible for ensuring that environmental aspects of
          the workshop are maintained including:

           • Safe collection and disposal of oils and contaminated waste water
           • Safe collection and disposal of metal and timber swarf
           • Control of any workshop air quality
           • Reduction of noise levels


           The Director and Cabinetmaker are required to ensure that any other company personnel
           entering the workshop comply with the abovementioned conditions.




Issue 2              July 1                                                       Page 14
Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 259 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.