Attachment 3 - Construction Management Plan

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                         Westcon Site Management Pty Ltd


                            CONSTRUCTION MANAGEMENT PLAN

1.    Introduction

1.2 Scope of the CMP

      Project Name: 9 Ann Street, Noosaville, Qld, 4566

      This Construction Management Plan (CMP) provides an outline of the environmental
      protection measures that will be applied to the above-named project to meet any
      specification, relevant laws and regulations and other requirements of:

      Client Name: Australian Residential and Commercial Developments Pty Ltd

      Issues which will be controlled at the project include:

          • Emission to air
          • Release to water
          • Noise
          • Waste management
          • Management of land (weed management)
          • Use of raw materials and natural resources
          • Local environmental and community issues


1.3 Application of CMP

      This Construction Management Plan applies to all activities of Westcon Site Management
      and its subcontractors to ensure that all construction work and site activities are carried out
      in a systematic and controlled manner to eliminate or minimise the possibility of damage to
      the environment in regards to:

          • Site establishment
          • Construction
          • Testing and commissioning
          • Demobilization
          • Site clean up


      The CMP and supporting documents are reviewed regularly and are required to meet the
      requirements of contract specifications. New procedures are developed for the construction
      of the above named project as required. Westcon Site Management is responsible for
      monitoring all stages of the implementation and execution of this CMP through the
      application of regular inspections.

      The practices stated in this CMP are required to be implemented in respect of all work
      undertaken by the company in fulfilling the contract scope of work.



Issue 2               July 1                                                         Page 3
Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 259 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.