Attachment 3 - Construction Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Westcon Site Management Pty Ltd
CONSTRUCTION MANAGEMENT PLAN
1. Introduction
1.2 Scope of the CMP
Project Name: 9 Ann Street, Noosaville, Qld, 4566
This Construction Management Plan (CMP) provides an outline of the environmental
protection measures that will be applied to the above-named project to meet any
specification, relevant laws and regulations and other requirements of:
Client Name: Australian Residential and Commercial Developments Pty Ltd
Issues which will be controlled at the project include:
• Emission to air
• Release to water
• Noise
• Waste management
• Management of land (weed management)
• Use of raw materials and natural resources
• Local environmental and community issues
1.3 Application of CMP
This Construction Management Plan applies to all activities of Westcon Site Management
and its subcontractors to ensure that all construction work and site activities are carried out
in a systematic and controlled manner to eliminate or minimise the possibility of damage to
the environment in regards to:
• Site establishment
• Construction
• Testing and commissioning
• Demobilization
• Site clean up
The CMP and supporting documents are reviewed regularly and are required to meet the
requirements of contract specifications. New procedures are developed for the construction
of the above named project as required. Westcon Site Management is responsible for
monitoring all stages of the implementation and execution of this CMP through the
application of regular inspections.
The practices stated in this CMP are required to be implemented in respect of all work
undertaken by the company in fulfilling the contract scope of work.
Issue 2 July 1 Page 3