Attachment 3 - Construction Management Plan

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                        Westcon Site Management Pty Ltd

2.    Preparation of the CMP

2.1 Introduction

      Each activity that has an impact on the environment will be planned at the earliest possible
      stage to ensure that it can be managed effectively and will be monitored and reviewed for
      environmental effects during the implementation of the work for the project listed in section
      1.2. This will be achieved through:

          • Identification     of environmental aspects as applicable to our activities and contract
           specifications.
          • Determination of legal and other requirements.
          • Development    of procedures to provide measures that will be incorporated into the
           activities to ensure that they are controlled.

2.2 Initial Environmental Review

      The following list is to be used to determine which environmental aspects are to be managed
      during the project.

             Noise
             Air Quality
             Water Quality
             Excavation and soil stripping
             Soil handling, stockpiles
             Off-site movement of soil
             Construction activity
             Maintenance Activities
             Handling and storage of oils, greases, fuels and chemicals
             Vehicle Movements
             Site Clean-up

2.3 Legal Requirements

      Consideration will be given to obtaining licenses and permits for at least the following
      activities, were applicable:

          • Disposal of regulated waste.
          • Handling and storage of hazardous materials.
          • Construction activities in environmental sensitive areas.
          • Disruption of traffic or services.


      Permits and other licences may be required based on contractual or local government
      requirements and the need for these will be assessed before the project commences.




Issue 2               July 1                                                         Page 4
Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 259 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.