                                                                                     2007/2446



27.   The applicant shall ensure that the development will not adversely impact on the drainage
      conditions on other properties. As the there will be significant filling and a potential for
      obstruction to the natural stormwater runoff from adjoining properties, where applicable
      appropriate stormwater drainage pipes shall be installed within the site to collect and
      discharge stormwater runoff from adjoining properties to prevent additional ponding/flooding
      on other properties or diversion of stormwater runoff onto other properties. A Development
      Permit for Operational Works shall be required.
28.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
      provided on site prior to being permitted to discharge into Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor/gross pollutant trap. To this end, a detailed maintenance plan shall be
      prepared for the proposed grease/oil arrestors/gross pollutant trap, which shall be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the on going maintenance scheme
      for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use. A Development Permit for Building Works shall not be
      granted until a Development Permit for Operational Works has been issued in regard to the
      drainage scheme.
29.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
30.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
31.   The existing sewer main that traverses the site and the sewer main that runs in the adjoining
      property at the rear of the site and the ‘zone of influence’ (taken as the area within a 45-
      degree angle measured from the invert of the sewer main to the finished surface level) shall
      be accurately located and determined by a licensed Surveyor and shown on all plans
      submitted for Operational Works approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected
      from risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the
      greater. As such the applicant shall amend Operational Works plans including Building
      plans to ensure compliance.

Service Easements (Sewer)
32.   A registered easement shall be created over the zone of influence of all sewers within the
      subject site and over those parts of the subject site that are impacted upon by sewers on any
      adjoining sites. The easements shall generally be parallel to and centred over the sewer
      main and be equivalent in width to twice the depth to invert level of the sewer at the deepest
      point within the allotment (measured from the finished surface) and be no less than 3.0m
      wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
      determine the necessary width of the easement, which shall be shown on any plans
      submitted for Operational Works / Building Works approval. To this extent the surveyor shall
      certify that the sewer and the zone of influence is wholly contained within the easement to be
      created.




                                                                                   Page 5 of 16

Used in these records

About this file

File size
90 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Decision Notice - 010.2007.00002446.001 [As Published].pdf · 90 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.