Attachment B - Proposed Plans · MCU19/0049.01
Plans and drawings: the text below has words only, no drawings.
NOTE: SOME ITEMS MAY NOT BE USED
LINETYPES KEY SYMBOLS - FIRE ABBREVIATIONS GENERAL NOTES
eCW COLD WATER AREA NOT COVERED BY BOOSTER ASSEMBLY DPH DOUBLE PILLAR HYDRANT. 1. ISOLATION VALVE AT WATER METER ASSEMBLY TO BE SECURED IN THE OPEN POSITION
HYDRANT OR HOSE REEL. e EXISTING. BY A PADLOCKED METAL STRAP AND AN ENGRAVED NON FERROUS METAL LABEL
eFH FIRE HYDRANT PUMP SET FH FIRE HYDRANT. ATTACHED. LABEL TO BE ENGRAVED WITH 8mm UPPER CASE WORDING: "FIRE SERVICE
FHR FIRE HOSE REEL. VALVE - CLOSE ONLY TO SERVICE FIRE HOSE REELS".
COLD WATER 10m EXCLUSION ZONE VALVE SET
FROM BUILDING 2. ALL SERVICES INSTALLED ADJACENT THE BUILDING ARE TO BE LOCATED OUTSIDE THE
FIRE HYDRANT TEST POINT ZONE OF INFLUENCE AS PER AS3500.
ALARM STROBE
FH 30m INTERNAL FIRE HYDRANT RUN HYDRANT BOOSTER IN LINE 3. ALL HYDRANT PIPEWORK TO BE BLUE BRUTE CLASS 16 INGROUND OR GALVANIZED
OF SIGHT OF FRONT ENTRY SINGLE PILLAR HYDRANT (INTERNAL) STEEL ABOVE GROUND TO COMPLY WITH AUSTRALIAN STANDARDS. ALL BLUE BRUTE
FH 60m EXTERNAL FIRE HYDRANT RUN
PIPEWORK TO BE SUPPORTED BY THRUST BLOCKS.
DOUBLE PILLAR HYDRANT (EXTERNAL)
10m FIRE HYDRANT SPRAY
4. WHERE PIPEWORK IS LIKELY TO BE EXPOSED TO FIRE IN AN AREA WITHIN A BUILDING
H STREET HYDRANT THAT IS NOT PROTECTED BY SPRINKLERS, PIPE-SUPPORTS SHALL BE INSTALLED WITH A
FHR 36m FIRE HOSE REEL RUN
MINIMUM FRL NOT LESS THAN 60/-/-. THE PIPE-SUPPORTS ARE REQUIRED TO HAVE A
FIRE HOSE REEL TEMPERATURE RESISTANCE OF NOT LESS THAN 500°C WHEN TESTED IN ACCORDANCE
4m FIRE HOSE REEL SPRAY
WITH AS1530.4.
THRUST BLOCK
FIRE FIRE FIRE FIRE WALL
FIP FIRE INDICATOR PANEL
SMOKE SMOKE SMOKE WALL
WATER PRESSURE - UNITYWATER
FIRE TRUCK (MUST BE LOCATED MINIMUM
10m FROM BUILDING & MAXIMUM 20m 150mm WATER MAIN IN TESTED: 29/01/26
FROM FEED HYDRANT).
SUMMARY RESULTS FLOW L/S PRESSURE kPa
STATIC PRESSURE (kPa) 0 296.45
0.66 295.87
5 291.55
10 285.27
20 265.45
30 245.74
MAXIMUM FLOW OBTAINED
DURING TEST: 56.5 158.13
(litres/second)
STATEMENT IS VALID UNTIL: JANUARY 2027
FIRE HYDRANT SERVICE DESIGN
FIRE HYDRANT COVERAGE IS ACHIEVED COMPLETELY VIA ON-SITE EXTERNAL
ATTACK HYDRANTS.
BUILDING CLASSIFICATION 9a
RISE IN STOREY >2
FIRE COMPARTMENT FLOOR AREA 4,760m2
PRESSURE REQUIRED 250kPa
WATER REQUIRED 20L/s
MINIMUM PRESSURE IN MAIN 265kPa
LENGTH OF RUN 100m
PIPING PRESSURE LOSS 75kPa
LOSS THROUGH DDCA 70kPa
LOSS OF FITTINGS (20%) 50kPa
VERTICAL RISE LOSS 20kPa
TOTAL PRESSURE LOSS 215kPa
PRESSURE AT TOP HYDRANT 50kPa
A PUMP IS REQUIRED
MECHANICAL ELECTRICAL HYDRAULIC FIRE ENERGY NABERS STORMWATER SECTION J BEEC
This drawing is not to be used for any construction purpose unless noted Project Drawing Title Discipline Scale N.T.S @ A1
otherwise in the issue column. Marline Newcastle pty ltd. accept no responsibility
EDEN PRIVATE HOSPITAL LEGEND & NOTES
for any unauthorised use of drawings issued on a "information and discussion"
only basis. A 13.04.26 FOR CONSTRUCTION ZM CB DW
50 MAPLE STREET, COOROY QUEENSLAND FIRE HYDRANT SERVICES
This drawing is copyright and is the property of Marline Newcastle pty ltd and must
2 27.01.26 REVISED AS REQUESTED ZM CB
not be retained, copied or used without written consent of marline newcastle. Job No. Drawing No. Rev
1 16.12.25 100% ISSUE FOR REVIEW ZM CB
[email protected] www.marline.com.au (02) 4925 9300 0 25mm
50mm 100mm ON A1 ORIGINAL
Rev Date Reason for Issue Drawn Design Verify MN16443 FH-00-001 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment B - Proposed Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 518 KB (small file)
- File type
No other editions are linked here.