”         3
          INTEGRATED PLANNING ACT 1997                                                                       IDAS Assessment Checklist, Version 15.0, 18 November 2005
          Major hazard facilities or possible       16.  Does the application involve a material change of use for a major hazard facility or possible
          major hazard facilities                        major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
          For more information refer to Guide 17.         S
          Ifyou answered “YES* to 086, the application        NO
          E         Senees (OES),                         (_] YES - complete Part L of Form 1
          requires assessment by the Department of                 .
          If an agency other than DES is the assessment
          manager for the application, DES is a concurrence
          agency for the application in relation to this matter.
          Water related development under the       |7.  The application involves:
         Water Act 2000                                   1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
           For more information about items {a) - (d), refer fo   (tick applicable box/es)
           Guide 15. For more Information about item (e),                  ,                              .
           refer to Guide 14 Does my application involve          [-] (a)  in a watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
         assessment of a referable dam?                                    a pump, gravity diversion, stream re-direction, weir or dam) - complete Part K2, Ks, Ks, Ke, or Ks of
            is you answered “none of the above” to Q7, the                 Form 1 whichever is applicable;
              ication requires assessment by the Department                            .                     .
          of Natural Resouroes and Mines PRAM                     [_] (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
           If an agency other than NR&M is the assessment                  K; of Form 7;
           manager for the application, NR&M is aconcurrence                              .         '
           agency for the application in retation to this mater.  [J (c)   for a subartesian bore, in declared groundwater area’, for use for purposes other
                                                                           than stock and/or domestic use - complete Part K: of Form 1;
                                                                  (J (d) for a subartesian bore, in certain declared groundwater area, for use for stock
                                                                           and/or domestic purposes - complete Part K: of Form 1,
                                                                  (J (e) for constructing a referable dam® or that will increase the storage capacity of a
 @                                                                         referable dam by more than 10% - complete Part Ks of Form 1; Of
                                                                  (J (f)   for taking or interfering with overland flow water - complete Parts Ke and G of Form 1
                                                              (ii) none of the above.
           Removal of quarry material froma         |8.   Does the application involve development for the removal of quarry material from a watercourse?
          watercourse                                     requiring an allocation notice under the Water Act 2000?
          For more information refer to Guide 16.         By NO
           If you answered “YES" to Q8, the application
           requires assessment by the Department of Natural J YES - complete Parts Kr and G of Form 1
           Resources and Mines (NR&M}.
           Hf an agency other than NR&M is the assessment
           manager for the application, NR&M is a concurrence
           agency for the application in relation to this matter.
           Note: Part G of Form 7 is required to be completed
           as the activity of removing quarry material from a
           watercourse is also an Environmentally Relevant
           Activity (ERA).
           Operational works in a tidal areaor      |9.   The application involves operational work that \s: (tick the applicable box/es)
         coastal management district                     ([1(i) _ tidaf work" as defined under the Coastal Protection and Management Act 1995 (the
            ‘ot more information refer to Guide 18. Far more                         :             .     :                                   :
           information about prescribed tidal work in local       Coastal Act) that ts not prescribed tidal work - complete Part M of Form 1; or
           goverment tidal areas refer to Guide 24           (ii) tidal work that is prescribed tidal work"' other than in a canal’? -complete Part P of Form 1; Of
           Unless you answered “none of the above" to Q9, the .       ;         a                                      ol.
 ©         application requires assessment by the        (_] {iii} carried out within a coastal management district under the Coastal Act and for - complete
          Environmental Protection Agency (EPA).                  Part M of Form 1 if any box/es (a) to (i) below are ticked.
           manager fr te cppizaon, EPA's a concurence             (J (a)    constructing or installing works in a watercourse between MHWS and HAT (ie.
           agency for the application in relation to this matter.           other than those works in tidal water} where the development has been determined not
           Local government Is the assessment manager for all               to be assessable against the Water Act 2000 ;
           prescribed tidal work.                                                     .             .                                :
                                                                  (J (b)    constructing a canal"2 intended to be connected to tidal waters;
                                                                  [1 (c)    constructing an artificial waterway;
                                                                  (J (d}    rectaiming land under tidal water;
                                                                  [J (e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                                  [J (f     interfering with quarry material on State coastal land above high-water mark;
                                                                  (J (g)    draining or allowing drainage or flow of water or other matter across State
                                                                            coastal land above high-water mark;
                                                                  (J (h)    removing or interfering with coastal dunes on land, other than State coastal land,
                                                                            that is in an erosion prone area and above high-water mark;
                                                                  (3 (i)    constructing a bank or bund wall to establish a ponded pasture on land, other
                                                                            than State coastal land, above high-water mark; or
                                                         [XI (iv)  none of the above.

          7  The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
          B  Referable dam is defined under the Water Act 2000.
          9  Watercourse is defined in sch 10 of the IPA.
           10 Tidal work is defined in sch 40 of the IPA.
           11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
           12 Canal means canal as defined under the Coastal Protection and Management Act 1995
                                                                                          Page 3

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00153163.001.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.