Skip to the record
The only place to find full transcripts.

Council archive · source document

00153163.001

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

.           .
           ?
           INTEGRATED PLANNING ACT 1997                                                                                IDAS Assessment Checklist, Version 15.0, 18 November 2005
            Operational work below high water          | 10.   The application involves operational work that is: (tick the applicable boxes)
          mark                                                       )   ti          43                                             i
           For more information refer to Guide 18. For more     CZ  (i) tidal work’?   as defined under the Coastal Protection and Management Act 1995 (the
            information about prescribed Sdal work in local             Coastal Act) that is not prescribed tidal work - comptete Part M of Form 1; oF
            goverment dal areas refer to Guide 24,             1 (ii) tidal work that is prescribed tidal work’ - complete Part P of Form 1; Of
            Uniess you answered “none of the above” to Q70,          ”       .         sas                                 vas
            the application triggers referral to Queensland    C1 (iii) carried out within a coastal management district's under the Coastal Act and for -
            Transport (OT) {Maritime Safety Qid) as a                               .      .                    ;              .                 cote g
            concurrence agency.                                         [-] (a)    disposing of dredge spoil or other solid waste material in tidal water — complete Part
           Local government is the assessment manager for all                      M of Form 1;
            prescribed tidal work.                                                      _.                    .
                                                                        [J (b)     reclaiming land under tidal water — complete Part M of Form 1; or
                                                                        (J (c)     constructing a canal"6, if the canal is associated with reconfiguring a lot - complete
                                                                                   Part M of Form 1;
                                                               [XJ (iv)   none of the above.
            Coastal management                           11.   The application involves: (tick the applicable box/es)
          ‘heen information refer to Guide 18.                 C1(i)      amaterial change of use assessable under a planning scheme involving operational
             nless you answered “none of the above” te Q11,                                                            i                                ietrirfi5
            the application requires assessment bythe                     work carried out completely or partly in a coastal management district
           Environmental Protection Agency (EPA),              (-] (ii)   a material change of use assessable under a planning scheme involving building
            Hf an agency other than EPA is the assessment                 work, carried out completely or partly in a coastal management district that is -
            manager for the application, EPA ts a concurrence                              :                    :      .
            agency for the application in retation to this matter.        « the construction of anew premises with a GFA’? of at least 1000m?
                                                                          e the enlargement of the GFA of existing premises by more than 1000m?
 ©                                                             (] (iii)   reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
                                                                          completely or partly in a coastal management district
                                                               ] {iv)     reconfiguring a fot'* assessable under schedule 8 of the IPA and in connection with
                                                                          the construction of a canal‘ - complete Part M of Form 1
                                                                    (v)   none of the above
           Development within the limits of a             12.  Does the application involve development below high water mark’? and within the limits of a port
           port                                                under the Transport infrastructure Act 1994?
            For more information refer to Guide 18, For             NO
            information about prescribed fidat work refer to    co
           Guide 24.                                              J YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
            If you answered "YES" to Q12, the appiication
            triggers referral to the Port Authority.
            The Port Authority is a concurrence agency i the
            development is -
            *  within 200m of a shipping channel or an entry
               and exit shipping corridor for the port
            © within 1000m of a swing basin, a commercial                                   ,
               shipping wharf, a mooring, anchorage or spoil
               grounds;
            © within 1000m of a planned port facility identified
               in aland use plan approved under the Transport
               Infrastructure Act 1994.
 @          In all other situation the Port Authority is an advice
            agency.
            Marinas                                       13.   Does the application involve operational work that is tidal work for a marina®? with more than 6
           For more Information refer to Guide 18. For          vessel berths?
            information about whether a marina is prescribed
            tidal work refer to Guide 24. The local government  K NO
          sie assessment manager for al proscribed Ha           LJ YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
            If you answered “YES” to Q13, the application
            triggers referral to Queensland Fire and Rescue
            Service as an advice agency.
            Tidal works in strategic port land tidal|     14.   Does the application involve tidal works within a strategic port land tidal area2*?
            areas                                               XJ NO
             For more information refer to Guide 18.             oO  YES - complete Part M of Form 1
             Unless you answered “NO” to Q14, the relevant Port
            Authority Is the assessment manager for the
             application and the Environmenta! Protection
            Agency (EPA) and Queensland Transport (QT) are                      .
            concurrence agencies for the application.

            13 Tidal work is defined in sch 10 of the IPA.
            14 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
            15 Coastal management district is defined in sch 10 of the !PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
               coastal management district under section 47(2} of that Act                                        ‘
            16 Canal means canat as defined under the Coastal Protection end Management Act 1995
            17 GFAis defined in sch 14 of the IPA ta mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
            18 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
               accompanied by the application for the operational works to construct the artificial waterway.
            19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
            20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
                                                                                                   Page 4

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00153163.001.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.