INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?
If you answered "YES" to Q15, the apptication & NO
triggers referral to the Queensiand Heritage Council
@s Concurrence agency for the application. (_] YES - complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Ac? 2000 and
For more information, including a list oft the sectaod involves: (tick the applicable box/es)
atchment ithin Queensland, refer to . . . . vo
3 rea eee CES. LJ {i) reconfiguring a fot, if any jot resulting from the reconfiguration is less than 16 hectares;
mess ne rene asin ty tr ais, [1 (ii) development assessable against the planning scheme involving the establishment or
Doce recto Neural Reeawes and Mines expansion of a waste water disposal system, other than a disposal system for carrying
(NR&M). out an environmentally relevant activity under the Environmental Protection Act 1994;
if an ther than NR&M is tha assessment sae .
manager for the appizafon, NRAM isa concurrence XI (ili) none of the above
agency for the application in relation to this matter.
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use and / ; j ‘i _
of reconfiguting a lot may tigger ths referral DO (i) reconfiguring a lot for which all of part of the premises are
For more information refer to Guide 5. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
Unless you answerad ‘none of the above" to Q17, e item 5, including the exemption otherwise provided for by paragraph (d);
ihe 9 apelicaton requires Se eta e item 6, including the exemption otherwise provided for by paragraph (e); or
ign Agency (EPA). . a : : : a .
ageney ofker tan EPA I the nex (EPA) manager * item 7, including the exemption otherwise provided for a mining activity or petroleum
for the application, EPA will be a concurrence activity; or
@ agency for tha application in relation to this matter. (b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
J (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessabie against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
(X1 {iii} none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the IP (C1 (i) reconfiguring a fot where any part of the lot is -
Unless you answered “none of the above" to Q18, ° subject to an easement in favour of a distribution entity or transmission entity under the
the application triggers referral to the agency to Electricity Act 1994 and the easement is for a transmission grid or supply network under
which the easement is granted in favour of as advice that Act; or
saeny * situated within 100m of a substation site;
[1] (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
e any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
© grid or supply network under that Act; and
e any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
(1 (iii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
[_] (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
e the work is located wholly or partly within 10m of a substation site;
(v) none of the above.
21 Strategic port tand tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00153163.001.pdfRelated documentPublic source context ↗
06/1101 - Op Works Landscaping, Stormwater, Silt & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.