v. no queuing of trucks is permitted on residential streets;
b. maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures;
c. works programme identifying key components of the works and their respective
durations;
d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues;
e. include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details;
f. include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details;
g. identification of complaint management procedures including:
i. contact details for the on-site manager; and
ii. dispute resolution procedures.
Any damage to the existing road system as a result of haulage operations shall be fully
repaired at the applicant’s expense.
C. Include an additional advisory note 19 to read as follows:
Removal of Existing Trees and Vegetation
19. Council has no objections to suitable felled timber being retained or removed from the site
for beneficial reuse, including for milling.
Page 9 of 9
Document Set ID: 25207630
Version: 3, Version Date: 02/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.