Approved Plan & Document OPW21-354

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   NOOSA COUNCIL
 APPROVED DOCUMENT
OPW21/0354 28 MAR 2020


[OCR of page images]
 

NOOSA COUNCIL

 

North Coast APPROVED DOCUMENT
MAsivroamenta OPW21/0354 28 MAR 2020
Services

 

 

Environmental Management Consultants

PROJECT: J000988

 

Friday, 26 November 2021

Tony Rossiter

Via Email: [email protected]

Dear Tony,
RE: Proposed Dam impact to Native Vegetation — 8 Robin Place Lake MacDonald QLD

North Coast Environmental Services undertook a site investigation on Monday 22"4 November 2021
to assess the ecological values present within and adjoining the proposed dam footprint at 8 Robin
Place Lake MacDonald (Lot 13 SP315578). Lot 13 was recently created as part of a rural residential
subdivision (Council Ref: OPW20/0051) and vegetation at the rear of the lot was subsequently
registered under conservation covenant. It is understood you are the new owner of Lot 13 and you
wish to construct a dam in the north of the lot within approximately 20m of the covenant edge. The
plan of the dam presented to us for assessment purposes is presented as Attachment 1.

No material impact is expected to the covenant vegetation given its separation of 20m from the
nominated position of the dam. It is noted that you informed us that the dam linework in Attachment
1 represents the centre of the top of bank of the dam. Further, the geotechnical assessment by
Tectonic has recommended the batters of the dam be constructed at 1:3 grade on the downslope
side of the dam and 1:2 on the high side. We have therefore assessed that the required downslope
batter of the dam would extend approximately 6m from the delineated top of bank in Attachment 1
on the assumption that the top of bank RL would be approximately 2m above ground RL Yas per
your advice on site). Consequently, approximately 14m separation is anticipated post dam
construction between the toe of the dam batter and the adjacent covenant boundary.

Whilst the covenant vegetation will not be impacted, a small copse of native trees are present
between the nominated dam location and the covenant boundary and are captured under the Noosa
Plan as being within a native vegetation area. These trees were not captured in the covenant under
the subdivision due to their non-remnant status and given they were scattered amongst a slash pine
infestation which has since been cleared to satisfy the DA conditions. Plate 1 identifies the conditions
within and abutting the proposed dam and the extent of trees anticipated to be directly impacted.
The trees comprise regrowth trees over a grassy understorey dominated by /mperata cylindrica
along with some regrowth saplings of mixed native species.

PO Box 9566 Pacific Paradise QLD 4564
ABN 60 625 108 625
1 | Page
Log in to download the original file

Approved Plan & Document OPW21-354.pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗