2010 SCC Decision Notice · REC14/0015

Attached to the e-mail REC14/0015 Previous Decision Notice Email 3 of 3.

of 11

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2009/843

 

Any changes required by Council's Solicitor must be corrected immediately.

‘Frontage Works

18.

19.

20.

Footpath improvements suchas topsoiling, grassing, and tree planting are required to the
Starboard Avenue and Eumundi Noosa Road frontages of the site and to the access T-Shaped
handle in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
Grass shall be couch, free of weeds. A Development Permit for Operational Works shall be
required.

All paths and driveways shall be designed and. constructed to ensure pedestrian safety using .
non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the
Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility.

All redundant vehicular crossings to the site shall be removed and replaced by footpath paving
and landscaping such as trees and grasses in accordance with Council's Standard
specifications prior to commencement of the use permitted by this permit.

Vegetation 2

ate

22.

23.

24,

Existing trees on site and within the road reserve are to be retained, except where required to
be removed due to a building approval or the conduct of an approved use. Driveways and
buildings sites should be designed to avoid the removal of native vegetation. In this regard,
trees located within the access easement shall be retained where practicable.

Any vegetation to be retained within the site and within the road reserve shall be protected from
interference resulting from clearing or construction activities by:

22.4. Clearly marking vegetation to be retained with flagging tape;
22.2. Installing protective fencing around the dip line ‘of the vegetation;

22.3. Stockpiling, storage and vehicle parking occurs in already cléared areas and does not
cause interference with vegetation; and

-22.4. Low impact construction techniques are used around vegetation to minimise interference

with the vegetation.

Trees to be retained shall be clearly identified prior to any pre-start meetings and the
commencement of any clearing. All protection measures must be in place prior to the
commencement of any construction works. :

Vegetation removal, tree felling and lopping shall be undertaken in an environmentally sensitive
manner to avoid damaging surrounding vegetation, trees and habitat. Cleared vegetation is to
be suitably processed by one of the following methods and removed from the site:-

24.1, Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum
of 10 metres between edges of heaps.

24.2. Disposal for firewood.
24.3. Disposal for landscaping purposes.

24.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.

24.5. Re-use for construction materials.

Reproductive components of any environmental weed species cleared from the site shall not
be mulched, with the material to be removed from the site and disposed of in a Council
approved refuse tip.

The disposal method for clearing works is to be submitted in conjunction with an application for
a Development Permit for Operational Work. The Applicant is advised that other methods may
be considered provided full details of the method are submitted.
The Applicant is advised that burning off is an unacceptable method of disposal.

4 of 13

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2010 SCC Decision Notice.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.