Council archive · source document
2010 SCC Decision Notice · REC14/0015
Attached to the e-mail REC14/0015 Previous Decision Notice Email 3 of 3.
2009/843 Any changes required by Council's Solicitor must be corrected immediately. ‘Frontage Works 18. 19. 20. Footpath improvements suchas topsoiling, grassing, and tree planting are required to the Starboard Avenue and Eumundi Noosa Road frontages of the site and to the access T-Shaped handle in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds. A Development Permit for Operational Works shall be required. All paths and driveways shall be designed and. constructed to ensure pedestrian safety using . non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility. All redundant vehicular crossings to the site shall be removed and replaced by footpath paving and landscaping such as trees and grasses in accordance with Council's Standard specifications prior to commencement of the use permitted by this permit. Vegetation 2 ate 22. 23. 24, Existing trees on site and within the road reserve are to be retained, except where required to be removed due to a building approval or the conduct of an approved use. Driveways and buildings sites should be designed to avoid the removal of native vegetation. In this regard, trees located within the access easement shall be retained where practicable. Any vegetation to be retained within the site and within the road reserve shall be protected from interference resulting from clearing or construction activities by: 22.4. Clearly marking vegetation to be retained with flagging tape; 22.2. Installing protective fencing around the dip line ‘of the vegetation; 22.3. Stockpiling, storage and vehicle parking occurs in already cléared areas and does not cause interference with vegetation; and -22.4. Low impact construction techniques are used around vegetation to minimise interference with the vegetation. Trees to be retained shall be clearly identified prior to any pre-start meetings and the commencement of any clearing. All protection measures must be in place prior to the commencement of any construction works. : Vegetation removal, tree felling and lopping shall be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation, trees and habitat. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- 24.1, Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. 24.2. Disposal for firewood. 24.3. Disposal for landscaping purposes. 24.4. Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. 24.5. Re-use for construction materials. Reproductive components of any environmental weed species cleared from the site shall not be mulched, with the material to be removed from the site and disposed of in a Council approved refuse tip. The disposal method for clearing works is to be submitted in conjunction with an application for a Development Permit for Operational Work. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The Applicant is advised that burning off is an unacceptable method of disposal. 4 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2010 SCC Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.