Council archive · source document
2010 SCC Decision Notice · REC14/0015
Attached to the e-mail REC14/0015 Previous Decision Notice Email 3 of 3.
20097843 ’ CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following satisfactory completion of construction:works. The developer will be responsible for the full cost of CCTV inspection, including any additional inspection necessary following defect identification and rectification. This charge is payable prior to the issue of Operational Works approval and will be determined on the unit rate basis current at the time of approval. Town Water Supply and Sewer Mains 32. 33. - 34, 35. 36. 37. 38. 39. 40. 41. 42. All proposed lots.shall be connected to Council’s water and sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements.at no cost to Council Reticulated water must be provided to each lot in the development. This must include: 33.1. Ensuring that existing internal water pipes are wholly contained within the lot they will serve. 33.2. An approved water meter for each lot in accordance with Sunshine Coast Water Standard Drawing SCW 350. 33.3. Upgrading the existing water meter serving Lot 48 to Council standards. in accordance with Council Standard Drawing SCW 350. 33.4. Provision of 25mmNB water services from the 150mm diameter main in Starboard Avenue to service proposed Lots 49,50,51 in accordance with Sunshine Coast Water Standard Drawings SCW 350, 355 and 360. 33.5. Provision of pipeline conduits under Starboard Avenue in accordance with Sunshine Coast Water Standard Drawing SCW 355. The existing 150mm diameter water main must be extended gars the existing 150mm diameter water main in Starboard Avenue to a location adjacent to the northern boundary of the access way. Reticulated sewerage must be provided to each lot in the development in accordance with The Noosa Plan. This includes ensuring existing sewer house drains are wholly contained within the Lot they will serve. Written approval to enter and construct must be obtained from property owners where external sewerage works are required to be undertaken within private property. This must be submitted with lodgement of the associated development application for Operational Works. A minimum 3.0 metre wide easement must be provided over all Council sewers located in private property. A 4.0 metre wide easement must be provided over Council sewers greater than 3.0 metres aeep (where approved by Council): Easements must be located centrally over the main. Stormwater retention systems and gross pollutant traps must maintain a minimum clearance of 1.5 metres from Council water supply and sewerage infrastructure. Construction works undertaken in the vicinity of Council water supply or sewerage infrastructure must not adversely affect the integrity.of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. Connection to Council live water mains and the Council live sewer system must be undertaken by Council at the applicants cost. Water meters must be located on alternative boundaries to power boxes. Individual 25mmNB water service pipes are required up the accessway to Lots 49, 50 and 51 with water meters located at the road boundary (100mm diameter main within the accessway is not required). Earthworks 43. All earthworks required on site shall be carried out in accordance with Council's Planning Scheme Policy PSP5 — Engineering Design Standards, so as not to cause the additional 6 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2010 SCC Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.