Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

2010 SCC Decision Notice · REC14/0015

Attached to the e-mail REC14/0015 Previous Decision Notice Email 3 of 3.

of 11

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2009/843

 

44.

ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.

Earthworks and civil works carried out on site shall not affect the structural integrity of any of the
existing fences or structures that border the development site. Fences that are affected shall be _
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any”
fences to be replaced shall be clearly shown on the plans submitted for Operational Works
approval.

Power Supply and Telecommunication

45.

46.

An underground electricity service shall be provided to each allotment if not already provided.

In this regard, an approved Electrical Design Consultant shall work in conjunction with Council
to prepare detailed designs of the electrical proposal.

The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey. .

Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant's expense and shall not entail a financial encumbrance on. future
purchasers of the prapoasd lots. A Development Permit for Operational Works shall be
required.

The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to the proposed lots. In: this regard written confirmation
from an approved telecommunication agency shall be submitted to the Council prior to Council

endorsing the Plan of Survey.
‘

Erosion and Sediment Control

47.

Any person acting on this permit shall prevent erosion and sediment export from leaving the

site. Site control measures such as silt fencing, controlled gravel access to the site and

controlled disposal of waste, will be necessary. In this regard, plans detailing the methods of
controlling erosion and sediment shall be submitted to the Council for approval. A Development
Permit for Operational Works shall be required. :

Contributions Toward Council Infrastructure

48.

Monetary contributions shall be paid to Counell towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the
contribution amounts under the current Council policies and requirements is outlined in the table
below:

 

 

 

 

 

 

 

 

 

 

 

PSP12 — Public Open Space Contributions (Park) $6,464

PSP16 — Sewerage Headworks Contributions ‘| $7,579

PSP17 — Water Supply Headworks Contributions $8,043

PSP20 — Pathway Trunk Network Contributions $1,453

TOTAL Contribution Amount = : $23,539

Please note, that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from September 2009 until the date of payment.

 

All contributions must be paid prior to the endorsement of the plan of survey by Council.

7 of 13

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2010 SCC Decision Notice.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.