Council archive · source document
2010 SCC Decision Notice · REC14/0015
Attached to the e-mail REC14/0015 Previous Decision Notice Email 3 of 3.
2009/843
General
49. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications. for all engineering works which shall be submitted in conjunction with an
application for a Development Permit for Operational Works. In this regard a DXF/DWG file on
GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
application for Operational Works.
50. Digital detailed designs including drawings, calculations, specifications and a schedule of works,
shall be submitted with any application for a Development Permit for Operational Works. The -
design shall be in accordance with Council’s Planning Scheme Policy PSP05 = Engineering
Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground
pipes or services, alll _ existing and proposed services required by the development shall be
shown on the plans.
51. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are.available at www.adac.com.au).
52. .Aconstruction management plan/strategy to ensure no damage occurs to Council services shall
be prepared by a suitably qualified Registered Professional Engineer and submitted to Council
in conjunction with any application for Operational Works.
53. Any damage caused to any public utility during the course of construction shall be repaired to
“Council's standards and at no cost to Council.
54. Any alteration of any public utility or other facilities necessitated by the development of the land
or associated construction works external to the site shall be at no cost to Council.
55. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road.» All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
56. The development must be undertaken and operatéd in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions. :
57. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available-at www.adac.com.au). .
Approval of works shall not be granted until all As Coristructed information has been supplied
and accepted by Council.
REFERRAL AGENGY CONDITIONS _
Not applicable.
ramteemummert gene
ES
: “Plan No. Rev. Plan / Document Name _ | Date =
“07021 3T/PSI. A Plan of Proposed Subdivision of Lot 74 on /RP iz 4 51 & ~ 30/1 1/09
Part of Lots 73 & 83 on RP 71151, i
8 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2010 SCC Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.