                                              Officer:            Tracy Arthur
                                              Direct Telephone:   5449 5228
                                              Response Address:   PO Box 141, Tewantin QLD 4565
                                              Email:              [email protected]
                                              Our Reference:      2008/831
                                              Your Reference:
29 May 2008

Building Surveying Professionals Qld Pty Ltd
PO Box 1632
BUDERIM QLD 4556




Dear Sir/Madam

                                 Information Request
                                Integrated Planning Act 1997

I refer to your application and wish to advise that we require further information to satisfactorily
assess the proposal. Please provide 4 copies of all information to be supplied, including an A3 set of
plans and a CD copy.

1     APPLICATION DETAILS

 Application No:            2008/831

 Proposal:                  Operational Works
 Street address:            247, 249 & 253 David Low Way, Peregian Beach
 Real property              Lot 1 and 2 RP 903222 and Lot 26 RP 9315
 description:
 Planning Scheme:            The Noosa Plan

2     INFORMATION REQUIRED

The information requested is set out below:
Land Use
1.    The landscaping plans do not make provision for one native canopy tree every 6 car parking
      spaces within the car parking area located at ground level in accordance with Condition 4.2 of
      the MCU approval (2006/2689).
2.    Dense screen planting is required along the southern side boundary of the site to protect the
      amenity of the adjoining residential property as per Condition 4.3 of the MCU approval
      (2006/2689). The plants proposed (ie. Callistemon endeavour, Grevilla robyn Gordon and
      Lomandra longifolia) in this location will not, on maturity, achieve a height above the fence.
      The landscaping plans are required to demonstrate screening vegetation in this location.
      Further, the bin storage area restricts landscaping opportunities along this boundary and
      therefore is not supported.
3.    Planting within the eastern front setback generally comprises species that on maturity will
      have low height (ie. approximately 1.5 metres) and will not provide some screening of the
      development. Landscaping in this location should provide for species with a greater height to
      assist in softening the 8 metre high buildings.
Full text of the other 3 pages

Page 2

                                                 -2-


4.    The Plant Schedule does not include details on the three Pandanus Pedunculatus species,
      which are proposed in the front setback on the landscaping plans.
5.    Archontophoenix cunninghamiana species and Poa labillardieri species are not native, and
      therefore not supported.
6.    Provide details of landscaping proposed under the stairwells of the buildings.
7.    The Landscaping Plan is required to illustrate the location of bicycle racks at ground floor
      level.
8.    Demonstrate how disabled access will be provided between the ground floor and upper floor
      levels of the building, and between the differing levels of the ground floor.
9.    Demonstrate that a maximum of 18 car parking spaces have been designated for staff parking
      in accordance with Condition 23.1.1.1 of the Material Change of Use approval (2006/2689).
      The current proposal shows 19 spaces for staff parking.
10.   Demonstrate that a minimum of 29 car parking spaces have been designated for customer
      parking in accordance with Condition 23.1.1.2 of the Material Change of Use approval
      (2006/2689). The current proposal shows 28 spaces for customer parking.
Environmental Health
11.   Demonstrate that sufficient space has been provided within the development for bin storage
      (waste and recycling for 18 tenancies) and bin wash down area in accordance with Council’s
      policy, and Condition 66 of the MCU approval (2006/2689). Note, that the current location of
      the bin storage area is unacceptable due to the loss of landscaping opportunities in this
      location.
12.   Provide a Waste Management Plan in accordance with Condition 68 of the MCU approval
      (2006/2689).
Land Development
13.   Please note that the Security Bond referred to in Condition 13 of the MCU approval
      (2006/2689) must be received by Council before a Development Permit for Operational Works
      can be issued.
14.   Please note that the Proof of Title (re: lot amalgamation) referred to in Condition 17 of the
      MCU approval (2006/2689) must be received by Council before a Development Permit for
      Operational Works can be issued.
15.   With regard to Condition 18 of the MCU approval (2006/2689) please show on the appropriate
      drawings, the “Existing concrete footpath and access” on the David Low Way frontage of
      the development site. It is noted that the “Crossover-Commercial 4000 wide” shown on Drg
      M3087-C04-A can be deleted as it has now been constructed.
16.   Please provide a plan showing appropriate sight lines as requested in Condition 20 of the
      MCU approval (2006/2689).
17.   With regard to Condition 23.2 of the MCU approval (2006/2689) please provide additional
      information on the headroom that is expected to be available within the basement especially in
      those areas affected by supporting beams and mechanical ducting.
18.   Please indicate on the relevant plans the traffic control and directional features as described in
      Condition 26 of the MCU approval (2006/2689).
19.   Please show the new kerb turnout at the northern end of the development site, together with
      Council’s new stormwater infrastructure. The development’s proposed stormwater design
      shown on drawing M3087-C05-A should be amended to suit that new work. Please also
      confirm that the proposed stormwater drainage design does not conflict with Council’s
      existing infrastructure, particularly sewer mains, by showing those services on the
      longitudinal section on drawing M3087-C06 A.

Page 3

                                                  -3-


20.     Please provide stormwater drainage calculations confirming that there is no net increase in
        stormwater runoff from the subject site, in accordance with Condition 35 of the MCU
        approval (2006/2689).
21.     Please provide duly prepared reports, including stormwater drainage calculations, which
        address the requirements of Condition 36 of the MCU approval (2006/2689).
22.     Please provide a detailed maintenance plan for the proposed grease/oil arrestors in
        accordance with the requirements of Condition 37 of the MCU approval (2006/2689).
23.     Please amend drawings so that the development complies with Condition 38 of the MCU
        approval (2006/2689) and Noosa Planning Scheme Policy 5 – 4.3 (a) (i), in that no
        mechanical features (such as pumps) are to be used to dispose of stormwater.
24.     Please show on the appropriate drawings, the existing sewer main and its ‘zone of
        influence’, in accordance with of Condition 40 of the MCU approval (2006/2689).
25.     Please demonstrate, by showing on the appropriate drawings and supplying any relevant
        documents, that the requirements of Conditions 42 and 43 of the abovementioned Decision
        Notice pertaining to the relocation of the existing sewer infrastructure to Lot 22 P9315
        have been satisfied.
26.     Please address all the requirements of Condition 49 of the abovementioned Decision Notice
        with regards to all sewers, proposed easements and associated zones of influence.
27.     Please provide a copy of the letter of authority, as required under Condition 50 of the
        abovementioned Decision Notice.
28.     With regard to Conditions 52-55 and 57-58 of the MCU approval (2006/2689) please provide
        additional detail on the proposed construction and site stability methods to be undertaken on
        site. Please submit to Council the relevant documents and letters of authority (where
        applicable).
29.     Please provide a copy of the Construction Management Plan in accordance with Condition
        59 of the abovementioned Decision Notice.
30.     Please note that the Contributions towards Council Infrastructure referred to in Condition
        62 of the MCU approval (2006/2689) must be received before a Development Permit for
        Operational Works can be issued. Please also note that the estimated contribution amount is
        subject to variations in the CPI, All Groups Brisbane from July 2007 until the date of
        payment.
31.     The Water and Sewer Plan estimation fee ($930.00 minimum fee) is to be paid when
        submitting the amended drawings.
Sewer
32.     Existing sewer connection is at IL 9.53 (Council Records). Please amend on Drg H-03 and
        confirm that all sewer lines can still drain to connection point.
33.     Drawing D-02-02 indicates existing manhole lid level is to be lowered to RL 10.5. Council
        records indicate lid level to be RL 10.56 (MP 20/03/07). Please confirm lid level can remain “as
        is”.
34.     All works to cap and seal existing sewer in northern corner of site to be carried out by Council
        at the Applicant’s cost. Please provide relevant notation on the plans.
Water
35.     Water connection to Council Main to be provided by Council at the Applicant’s cost. The
        configuration of connections to provide separate fire and domestic flows, including a 150mm
        dia. fully testable single detector check valve with 25mm dia. metered bypass. Please amend
        drawing H-03 to suit.
36.     Please note that only hydrants and sprinkler systems are permitted to be connected to
        dedicated Fire Service. All domestic flows and fire hose reels to be connected to domestic
        meter.

Page 4

                                                 -4-




Under the provisions of the Integrated Planning Act 1997, you have three options available in
response to this Information Request. You may give the assessment manager (in this instance
Council) and each referral agency (if any):
1.    all of the information requested; or
2.    part of the information requested together with a letter asking the assessment manager and
      each referral agency to proceed with the assessment of the application; or
3.    a letter:
      (i)    stating that you do not intend to supply any of the information requested; and

      (ii)   asking the assessment manager and each referral agency to proceed with the
             assessment of the application.

Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to
respond to any information request within 12 months of the request or otherwise, the application
lapses.
A response to the above is required to be submitted, prior to further assessment of the application. If
any further matters arise as part of assessment of this application, you will be advised accordingly.

Should you have any further queries in relation to the above, please do not hesitate to contact Tracy
Arthur on the above number.

Yours faithfully,



Tracy Arthur
SENIOR PLANNING OFFICER

Used in these records

About this file

File size
18 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request for Further Information - 010.2008.00000831.001 [As Published].pdf · 18 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.