20. Please provide stormwater drainage calculations confirming that there is no net increase in
stormwater runoff from the subject site, in accordance with Condition 35 of the MCU
approval (2006/2689).
21. Please provide duly prepared reports, including stormwater drainage calculations, which
address the requirements of Condition 36 of the MCU approval (2006/2689).
22. Please provide a detailed maintenance plan for the proposed grease/oil arrestors in
accordance with the requirements of Condition 37 of the MCU approval (2006/2689).
23. Please amend drawings so that the development complies with Condition 38 of the MCU
approval (2006/2689) and Noosa Planning Scheme Policy 5 – 4.3 (a) (i), in that no
mechanical features (such as pumps) are to be used to dispose of stormwater.
24. Please show on the appropriate drawings, the existing sewer main and its ‘zone of
influence’, in accordance with of Condition 40 of the MCU approval (2006/2689).
25. Please demonstrate, by showing on the appropriate drawings and supplying any relevant
documents, that the requirements of Conditions 42 and 43 of the abovementioned Decision
Notice pertaining to the relocation of the existing sewer infrastructure to Lot 22 P9315
have been satisfied.
26. Please address all the requirements of Condition 49 of the abovementioned Decision Notice
with regards to all sewers, proposed easements and associated zones of influence.
27. Please provide a copy of the letter of authority, as required under Condition 50 of the
abovementioned Decision Notice.
28. With regard to Conditions 52-55 and 57-58 of the MCU approval (2006/2689) please provide
additional detail on the proposed construction and site stability methods to be undertaken on
site. Please submit to Council the relevant documents and letters of authority (where
applicable).
29. Please provide a copy of the Construction Management Plan in accordance with Condition
59 of the abovementioned Decision Notice.
30. Please note that the Contributions towards Council Infrastructure referred to in Condition
62 of the MCU approval (2006/2689) must be received before a Development Permit for
Operational Works can be issued. Please also note that the estimated contribution amount is
subject to variations in the CPI, All Groups Brisbane from July 2007 until the date of
payment.
31. The Water and Sewer Plan estimation fee ($930.00 minimum fee) is to be paid when
submitting the amended drawings.
Sewer
32. Existing sewer connection is at IL 9.53 (Council Records). Please amend on Drg H-03 and
confirm that all sewer lines can still drain to connection point.
33. Drawing D-02-02 indicates existing manhole lid level is to be lowered to RL 10.5. Council
records indicate lid level to be RL 10.56 (MP 20/03/07). Please confirm lid level can remain “as
is”.
34. All works to cap and seal existing sewer in northern corner of site to be carried out by Council
at the Applicant’s cost. Please provide relevant notation on the plans.
Water
35. Water connection to Council Main to be provided by Council at the Applicant’s cost. The
configuration of connections to provide separate fire and domestic flows, including a 150mm
dia. fully testable single detector check valve with 25mm dia. metered bypass. Please amend
drawing H-03 to suit.
36. Please note that only hydrants and sprinkler systems are permitted to be connected to
dedicated Fire Service. All domestic flows and fire hose reels to be connected to domestic
meter.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2008.00000831.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18 KB (small file)
- File type
No other editions are linked here.