NOOSA COUNCIL IDAS Development Application Decision Notice                                                    4 of 8


15.   The transportation of all materials to and from the site shall be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
      be covered to prevent materials including dust being windblown from the vehicle..

16.   The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
      Manual using soaked CBR tests of the subgrade.

      The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager -
      Land Development for approval prior to placement of pavement material.

17.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
      first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
      These devices are to remain in place during the civil works and construction phases of the development.
      The location and type of device to be installed shall be established at the “pre start” meeting with
      Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
18.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
      intention to commence works to arrange a “pre start” meeting regarding the civil works.

19.   The principal contractor must have all the appropriate insurance and public liability documentation to carry
      out the works. The principal contractor is also responsible to ensure that any sub contractors also have
      the appropriate insurance and public liability documentation.

20.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
      signed approved drawings and conditions by the applicant.

21.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
      (This person will be the contact for the project).

22.   Council standards shall apply to these works unless otherwise modified herein.

23.   The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
      during the construction of the engineering works to ensure that Council property, road pavements or
      facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
      furniture etc.) are protected against any damage or interference whatsoever.

      If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
      Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-Land
      Development and shall forthwith rectify the damage to that property or facility at its cost and to the
      satisfaction of the Manager-Land Development, prior to the commencement of the use or, alternatively,
      the Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
      being paid by the Applicant to the Council prior to the commencement of the use, provided that in the
      case of emergency the Council shall be entitled to rectify such damage at the cost of the Applicant, such
      cost being paid prior to the commencement of the use.

      A management strategy to ensure no damage occurs to Council services shall be given to Council for
      assessment prior to the pre start meeting.

24.   The development of the site shall be carried out in such a manner as to prevent dust and/or sand
      nuisance to residents and/or tenants in the vicinity of the development.

25.   Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
      pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
      hours are approved by the Manager-Land Development or his nominee.

26.   All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
      Traffic Control Devices and Traffic Infrastructure (Roads) Act.

27.   Safe pedestrian access on Peregian Esplanade shall be maintained at all times. Should footpath / road
      closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410
      512 505) must be notified prior to the proposed closure.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Used in these records

About this file

File size
33 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00001304.001 [As Published].pdf · 33 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.