Skip to the record
Accept no imitations.

Council archive · source document

Decision Notice - 010.2006.00001304.001 [As Published] · 142006.1304

of 8

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                               5 of 8


28.   Sediment and erosion control measures must be in place prior to works commencing. If such measures
      are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
      sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
      natural waterways. Although the sediment and erosion control measures have been approved on drawing
      No. 7494/1-SW4-B, Council’s Manager – Land Development may request further controls to be installed
      should approved measures be inefficient.

29.   The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps in
      accordance with the manufacturers specifications.

30.   The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on a
      weekly basis and after each storm event.

      The owners of the subject property shall enter into an ongoing maintenance contract with a Registered
      Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a regular three
      monthly cycle and on a “On Call” basis in the case of an emergency.

      The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be included in
      the maintenance program for the completed development.

31.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
      on construction works during the maintenance period, which is a minimum period of 12 months duration.
      Such bond must be lodged by, and shall only be accepted from the Developer for the works.

32.   The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
      completed.

33.   These works are also to be in compliance with the relevant conditions of Development Permit No.
      2006/0273.

34.   Notwithstanding that Council has checked the plans with due care, where it is found during construction
      that variations from Council's standards exist, then Council standards shall apply




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Used in these records

About this file

File size
33 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00001304.001 [As Published].pdf · 33 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.