240920 - 33 Ross Crescent RFI Response · MCU24/0094
DEVELOPMENT ON SLOPING SITES
RESPONSE | PO20
5 6 7 8 9
proposed reduction in bulk apperance (shown red)
PO20 | By establishing the height limitations above
the natural contour the proposed carves out from,
rather than projects into, the allowable envelope.
This reduces the bulk and scale while enabling
amenity by way of external space for residents to
TOW 27.800 enjoy.
The southern elevation for the proposed
rnd01 development remains within the allowable height
limits and at no point does the home exceed
allowable heights. Additionally, roofing the ground
floor with a conventionally pitched roof that
parallels the natural contour not only adds bulk but
it eliminates any opportunity for views and amenity
for the first floor occupants to the east.
TOW 24.300
roof
RL24.100
mts01 con02
3100
bal01 height limit projected (8m) above (ngl)
dashed red
TOW 21.300
first floor
RL21.000
con02
gls01 gls01 gls01
mts01
3500
seat
con02 line of natural ground (ngl)
ground level dashed red
RL17.500
alu01
TOW 16.550
con03
4000
lower ground
RL13.500
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV
PROJECT NO 0427
33 Ross Crescent, Ross Crescent Family site study SD 110.01 SCALE As
indicated
southern elevation
Sunshine Beach Trust RFI schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
[OCR of page images]
a)
DM
~~
8)
DK _2000
‘OW 27.804
fan}
«K 5740
, os
WV i240)
12700
proposed reduction in bulk apperance (shown red)
‘OW 24.301
8500
PO20 | By establishing the height limitations above
the natural contour the proposed carves out from,
rather than projects into, the allowable envelope.
This reduces the bulk and scale while enabling
amenity by way of external space for residents to
enjoy.
The southern elevation for the proposed
development remains within the allowable height
limits and at no point does the home exceed
allowable heights. Additionally, roofing the ground
floor with a conventionally pitched roof that
parallels the natural contour not only adds bulk but
it eliminates any opportunity for views and amenity
for the first floor occupants to the east.
+
100
first floor a,
WV R121.000
height limit projected (8m) above (ngl)
dashed red
i -
y
i
a ?
| ( f
f $2 Tt 7
H ; t
g — t t cK t
a | 7y ~|g
Y XN
Z
ground level
W._ Ru7.500
£ q
9 t 4
g bf 4
g fi
lower ground
W. RL13.500
shaun lockyer architects
www.lockyerarchitects.com.au . 07 3257 7288
nominated architect: Shaun Lockyer 3455 QLD . 9377 NSW
DRAWN REV DATE
ISSUE
PROJECT
33 Ross Crescent,
Sunshine Beach
CLIENT
Ross Crescent Family
Trust
line of natural ground (ngl)
dashed red
DRAWING NAME
site study
southern elevation
RFI
PHASE DWG NO REV
SD 110.01
schematic design
Ror \a 3
FETC)
PROJECTNO 0427
ry
indicated
A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
240920 - 33 Ross Crescent RFI Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.