PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
8. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like, except where required
to satisfy any privacy condition of this Decision Notice.
Protection of Privacy
9. To ensure privacy is protected between adjoining properties, any window/s, deck or
the like that overlooks or has the potential to overlook the private open space or
habitable room windows of neighbouring properties must either:
a. have a minimum window sill height or 1.5 metres above floor level
b. be fitted with translucent glazing
c. be fitted with a fixed external screen positioned in such a way to obscure direct
view
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Building Appearance
11. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
External Works
12. Opal Street must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice
b. remarking of the existing on-street parking bays
c. linemarking of the access driveway signage.
13. The access driveway to the site from Diamond Lane must include the construction of
a passing opportunity for vehicles traversing Diamond Lane. The overall width of the
lane formation and the passing opportunity must be sufficient to allow vehicles to
pass.
Site Access and Driveways
14. A sealed access driveway must be provided from Opal Street and Diamond Lane to
all parking and manoeuvring areas of the development. The works must include in
particular:
a. a driveway crossover in Opal Street generally in accordance with RS-051
b. a vehicle crossover in Diamond Lane generally in accordance with the
approved plans. The crossover must not cause additional ponding of
stormwater in Diamond Lane or direct runoff onto the subject site or any
adjoining property.
Page 5 of 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.