PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Car Parking
15. A minimum of 10 car parking spaces must be provided on the site. The works must
include in particular:
a. 2 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use
b. Dimensions, crossfalls and gradients in accordance with Australian Standard
AS/NZS2890.1:2004
16. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Pedestrian Facilities
17. Pedestrian facilities must be provided for the development. The works must include in
particular a 1.8 metre wide footpath within the road verge for the entire length of the
site’s frontage to Opal Street. In this regard, the existing path must be removed and
replaced with the new path.
Stormwater Drainage
18. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken generally in accordance with the
approved plans.
Electricity and Telecommunication Services
19. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
20. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
21. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
22. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
23. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
24. All earthworks must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Page 6 of 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.