Original source · versioned page text
2021-07-06 Planning & Environment Committee Meeting Agenda
The original of this document is very large (14.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 JULY 2021 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Environment Committee Meeting dated 6 July 2021 regarding Application No. RAP21/0016 for a Referral Agency Response for a Dwelling house (filling beyond 3m of the footprint of building) situated at 11 Church Street, Pomona and request the assessment manager (private building certifier) to grant a development approval subject to the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date J206156 01A Contour Survey Plan, prepared by Kevin Holt Consulting 04/11/2020 S4486 Sheet 02 NA Site Plan, prepared by Stylemaster 21/01/2021 S4486 Sheet 04 NA Elevations, prepared by Stylemaster 21/01/2021 S4486 Sheet 05 NA Elevations, prepared by Stylemaster 21/01/2021 Sunset Clause for Referral Agency Response 3. This Referral Agency response is no longer valid if the use has not commenced within 4 years of the date of this notice, unless otherwise extended in writing by Council. Nature and Extent of Approved Use 4. The approved development is limited to the extent of fill proposed on the site. The proposed dwelling house does not form part of this approval. Flood Immunity, Drainage and Earthworks 5. All cut and fill must be in accordance with the Approved Plans. 6. Fill material placed over services must not impose any additional surcharge loading on the service. 7. Excavation must not be carried out within 600mm of any utility infrastructure (to top, sides and base of services). A retaining wall must be provided to support the soil surrounding utility infrastructure where proximate to excavation activities. 8. Compaction with a vibrating roller must not be carried out within 600mm of any utility infrastructure. 9. Other than for accessways, filling must not extend more than the fill/batter line as shown on Approved Site Plan, prepared by Stylemaster and dated 21 January 2021. 10. Earthworks required on site must be carried out in accordance with Council’s Planning Scheme Policy PSP6 - Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. Page 23 of 105
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.