Original source · versioned page text
Synergy Property Partners- Noosaville- Town Planning Report_REVA
Attached to the e-mail MCU15/0095 & REC15/0022 IDAS Forms, Report & Plans (1 of 3).
TfA Project Group Pty Ltd Synergy Property Partners- Noosaville- Town Planning Report
The proposal is therefore considered to adequately address all relevant aspects of this code.
5.4.11. Waste Management Code
The proposed development has been able to demonstrate compliance against all relevant acceptable outcomes of the
Waste Management Code. The key findings of this assessment have been summarised below:
The proposed development including construction and operational works will comply with PSP1131 as required.
A waste storage area will be provided for all waste materials in their specific waste streams during construction,
operational and demolition works as applicable.
The refuse storage area will be located at the eastern boundary adjacent to the petrol building. It will be suitably
screened from the street with barriers and is appropriately set back from adjoining uses, the refuelling forecourt
area and areas of high pedestrian activity.
Waste collection and fuel delivery vehicles can conveniently access the site, stand wholly within the service bay
area whilst undertaking their operations and then exit the site in a forward gear.
The proposal is therefore considered to adequately address all relevant aspects of this code.
5.4.12. Water Sensitive Design Code
The proposed development has been able to demonstrate compliance against all relevant acceptable outcomes of the
Water Sensitive Design Code. The key findings of this assessment have been summarised below:
The development complies with water quality standards for Water Sensitive Urban Design and all other
Australian Standards where applicable to the site.
The proposal is therefore considered to adequately address all relevant aspects of this code.
5.4.13. Water Supply and Sewerage Reticulation Code
The proposed development has been able to demonstrate compliance against all relevant acceptable outcomes of the
Water Supply and Sewerage Reticulation Code. The key findings of this assessment have been summarised below:
The proposal is considered to comply with best practice techniques as recommended in the PSP6 –
Engineering Design Standards — Water and Sewerage.
Construction drawings will be designed in accordance with the PSP6 – Engineering Design Standards — Water
and Sewerage where applicable.
The proposal is therefore considered to adequately address all relevant aspects of this code.
Page 24 of 30 6/10/2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.