The slipway at 238 Gympie Terrace,                                                                                    Terrace therefore PO27 is not
Noosaville serves as important                                                                                        applicable.
infrastructure for small vessels.
Environment, natural resources and recreation
PO31                                     AO31                                   The applicant has not specifically    The applicant has demonstrated
Development has no significant           Connecting Habitat Areas as            addressed the Noosaville Local Plan   compliance with PO31.
adverse effects on biodiversity, natural identified on Map SFM-4-Biodiversity   Code.                                 Given the nature of the works
vegetation, native fauna habitat,        (Strategic Framework) are protected                                          (placement of additional
landscape quality, water quality or      from fragmentation and                                                       oyster/rock substrates on the
cultural heritage values, including      encroachment by development.                                                 seabed) there is the potential
those related to—                                                                                                     for short-term impacts to water
    (a) changes to natural drainage;                                                                                  quality and movement of
    (b) disturbance to any wetland                                                                                    sediments.
         system;                                                                                                      The Project demonstrates
    (c) management of fire risk;                                                                                      appropriate mitigation and
    (d) erosion and the transport of                                                                                  management measures have
         sediments off site;                                                                                          been considered through the
    (e) unmanaged public access;                                                                                      Noosa Oyster Ecosystem
    (f) changes to fauna habitat and                                                                                  Restoration Project – Project
         behaviour.                                                                                                   Restoration Plan. In addition, as
                                                                                                                      required under condition 21 of
                                                                                                                      SARA Decision Notice, the
                                                                                                                      Inspection and Monitoring
                                                                                                                      Program will monitor any
                                                                                                                      potential impacts and provide
                                                                                                                      management measures to
                                                                                                                      remediate any adverse impacts
                                                                                                                      should they occur.
                                                                                                                      Furthermore, the works must be
                                                                                                                      undertaken in accordance with
                                                                                                                      an approved Construction
                                                                                                                      Environmental Management
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.