Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Plan (CEMP) as per Council
approval conditions.
The Connecting Habitat Areas
identified on Map SFM-
Biodiversity will not be
impacted.
PO32 AO32 The applicant has not specifically The applicant has demonstrated
Development maintains and protects Open space corridors identified as addressed the Noosaville Local Plan compliance with PO32. The
an integrated open space network Ecological Linkages and Major Code. Project seeks to enhance items
throughout the locality to— recreation areas on Map SFM-1- listed at (c) and (d) through
(a) provide for both passive and Settlement and Map SFM-4- restoration of oyster reef
active recreational pursuits; Biodiversity (Strategic Framework) habitats in Noosa River. The
(b) provide connectivity for are enhanced and protected from Project will not impact on the
pedestrians and cyclists; fragmentation and encroachment by open space network nor
(c) provide habitat connectivity for development. interact with the open space
wildlife and fish passage; corridors identified on Map
(d) protect watercourses and SFM-1-Settlement and Map
drainage lines; SFM-4-Biodiversity.
(e) protect vegetation on steep
slopes; and
(f) for a scenic backdrop for
residential development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.