(d) ensures no net increase in site
cover or gross floor area of
buildings or structures;
(e) uses materials, natural finishes
and colours that blend with the
surrounding natural landscape;
and
(f) reflects the character and
setting of the locality (such as
timber and tin construction
with a traditional pitched roof
design).
PO3 No acceptable outcome provided. The applicant has not specifically The Project is not a landing
All commercial activities including, the addressed the Waterways works therefore PO3 is not applicable.
loading and unloading of passengers code.
and boat docking is confined to the
commercial lease areas of the
respective commercial operation.
Editor’s Note— The commercial lease
area is the lease area at the time of
gazettal of this plan
Car parking No acceptable outcome provided. The applicant has not specifically The Project does not require
PO4 addressed the Waterways works carparking therefore PO4 is not
Sufficient car parking is provided on code. applicable.
site to accommodate the number and
type of vehicles likely to be generated
by the use
Siting – prescribed tidal works outside Noosa Waters Estate
PO5 No acceptable outcome provided. The applicant has not specifically The Project does not include
The construction of new jetties, addressed the Waterways works jetties, wharves or boardwalks
wharves and boardwalks on freehold code. on freehold land therefore PO5
is not applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.