2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

     (d) ensures no net increase in site
         cover or gross floor area of
         buildings or structures;
     (e) uses materials, natural finishes
         and colours that blend with the
         surrounding natural landscape;
         and
     (f) reflects the character and
         setting of the locality (such as
         timber and tin construction
         with a traditional pitched roof
         design).
PO3                                         No acceptable outcome provided.   The applicant has not specifically   The Project is not a landing
All commercial activities including, the                                      addressed the Waterways works        therefore PO3 is not applicable.
loading and unloading of passengers                                           code.
and boat docking is confined to the
commercial lease areas of the
respective commercial operation.

Editor’s Note— The commercial lease
area is the lease area at the time of
gazettal of this plan
Car parking                               No acceptable outcome provided.     The applicant has not specifically   The Project does not require
PO4                                                                           addressed the Waterways works        carparking therefore PO4 is not
Sufficient car parking is provided on                                         code.                                applicable.
site to accommodate the number and
type of vehicles likely to be generated
by the use
Siting – prescribed tidal works outside Noosa Waters Estate
PO5                                       No acceptable outcome provided.     The applicant has not specifically   The Project does not include
The construction of new jetties,                                              addressed the Waterways works        jetties, wharves or boardwalks
wharves and boardwalks on freehold                                            code.                                on freehold land therefore PO5
                                                                                                                   is not applicable.
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.