land in largely undeveloped sections of
a watercourse is avoided.
PO6                                       No acceptable outcome provided.       The applicant has not specifically   The Project does not include
The construction of new jetties and                                             addressed the Waterways works        jetties or wharves on public land
wharves on public lands is avoided                                              code.                                therefore PO6 is not applicable.
unless there is a clear demonstrated
community benefit and community
support.
PO7                                       AO7                                   The applicant has not specifically   The Project satisfactorily
Prescribed tidal works are not located    Refer to Figure 9.4.9.3M— Noosa       addressed the Waterways works        complies with PO7. The Noosa
on the southern bank of the Noosa         Heads Lions Park to Weyba Bridge.     code.                                Sound East site and the Noosa
River and tributaries between the                                                                                    Sound west site are located
Noosa Heads Lions Park and Weyba                                                                                     between the Noosa Heads Lions
Bridge (Refer to Figure 9.4.9.3M).                                                                                   Park and Weyba Bridge.
                                                                                                                     However given the nature of the
                                                                                                                     Project being located on the
                                                                                                                     seabed not the bank of the
                                                                                                                     Noosa River it is considered that
                                                                                                                     the intention of this
                                                                                                                     Performance Outcome is met.
PO8                                      No acceptable outcome provided.       The applicant has not specifically    The Project does not include
Prescribed tidal works do not include                                          addressed the Waterways works         extensions of on-site
extensions of on-site recreational areas                                       code.                                 recreational areas therefore
unless there is a clear demonstrated                                                                                 PO8 is not applicable.
community benefit and community
support.
Character, amenity & access - prescribed tidal works outside Noosa Waters Estate
Site Responsive Design                   AO9.1                                 The applicant has not specifically    The Project satisfactorily
PO9                                      For lots with waterway frontage       addressed the Waterways works         complies with PO9. Given the
Prescribed tidal works are designed      greater than 15 metres in width,      code.                                 nature of the Project, lot
and sited to ensure—                     jetties and pontoons are setback a                                          boundaries and vessel berthing
                                         minimum of 3 metres from the                                                are not applicable.
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.