Skip to the record
Accept no substitutions.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PO17                                     No acceptable outcome provided        The applicant has not specifically   The Project is not within the
Landings are not roofed.                                                       addressed the Waterways works        Noosa Waters Estate waterways
                                                                               code.                                therefore PO17 is not
                                                                                                                    applicable.
Design, Construction and Safety for Jetties within Noosa Waters Estate waterways
PO18                                      No acceptable outcome provided.     The applicant has not specifically    The Project is not within the
Structures such as handrails, light                                           addressed the Waterways works         Noosa Waters Estate waterways
bollards, piers and pumping equipment                                         code.                                 therefore PO18 is not
for semi-submersible floating docks                                                                                 applicable.
have a maximum height of 1100mm
above the jetty floor.
PO19                                      AO19.1                              The applicant has not specifically    The Project is not within the
Development is designed and               Jetties—                            addressed the Waterways works         Noosa Waters Estate waterways
constructed for the sole purpose of       are a maximum width of 1.5 metres; code.                                  therefore PO19 is not
providing access to vessels and are       a maximum length of a jetty head is                                       applicable.
sited and designed to avoid—              not more than 7 metres (Refer
     (a) cluttering of waterways;         Figure 9.4.9.3C);
     (b) excessive traffic volumes        constructed predominantly of
         within foreshore areas, on       timber;
         adjoining lands and within the   are not constructed parallel to the
         waterway; and                    revetment wall; and extend a
     (c) unacceptable risks to personal maximum of 10 metres past the
         and public safety.               quayline.

                                         AO19.2
                                         For “Y” and “T” shaped jetty heads
                                         or other shaped jetty heads—
                                             (a) a maximum area of 10.5m²
                                                 excluding any walkway is
                                                 provided; and
                                             (b) a walkway with a minimum
                                                 length of 3 metres is
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.