Skip to the record
Accept no imitations.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

       provided to the jetty head
       (Refer Figure 9.4.9.3D).

AO19.3
Jetties have independent support
structures and are not supported by
the revetment wall.

AO19.4
Seep holes in the revetment wall are
not obstructed by any jetty.

AO19.5
For lots comprising a dwelling house
or dual occupancy, a maximum of
one jetty per development is
constructed.

AO19.6
Multiple dwellings with common
property along the waterway
frontage meet the following—
    (a) a maximum of 2 jetties per
        multiple dwelling;
    (b) jetties are shared between
        unit owners;
    (c) a minimum of 20 metres
        separation is provided
        between each jetty;
    (d) the jetty is setback a
        minimum of 3 metres from
        the prolongation of
        boundaries; and
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.