Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

        development (building, filling       (b) does not include shrubs.
        or excavation) ensuring—
    -   the 4.5 metre setback area is     AO23.4
        predominantly soft                Side boundary fences within 4.5
        landscaping;                      metres of the revetment wall taper
    -   a maximum of 25% of the area      down to a maximum height of 1.2
        is impervious;                    metres at the revetment wall and no
    -   dominant impervious areas         more than 1.5 metres at a distance
        and masonry retaining walls       of 2.25 metres from the revetment
        are avoided;                      wall.
    -   retaining structures and the
        like are light weight, low rise
        and screened by landscaping;
    -   natural materials such as
        timber or rock are used rather
        than manufactured materials;
    -   the acoustic privacy and access
        to sunlight of surrounding
        development is protected; and
    -   views are not impeded.
PO24                                      No acceptable outcome provided.       The applicant has not specifically   The Project is not within the
No shore side anchor points are                                                 addressed the Waterways works        Noosa Waters Estate waterways
installed within 4.5 metres of the                                              code.                                therefore PO24 is not
centre line of the revetment wall.                                                                                   applicable.
PO25                                      No acceptable outcome provided.       The applicant has not specifically   The Project is not within the
No mooring, anchoring, tying or                                                 addressed the Waterways works        Noosa Waters Estate waterways
docking of vessels occurs adjacent to                                           code.                                therefore PO25 is not
the revetment wall.                                                                                                  applicable.
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.