Performance outcome                         Acceptable outcome                  Applicant response             Assessment
                                            not roofed unless they              Restoration Zones have
                                            are the main access to              been developed based on
                                            land;                               Habitat Suitability
                                            (d) if a relevant planning scheme   parameters and
                                            standard is more stringent          Restoration Suitability
                                            than the standard mentioned         parameters as detailed in
                                            in paragraph (a), (b) or            the Project Restoration
                                            (c)—the relevant planning           Plan.
                                            scheme standard, to the             (a) The Restoration Zones
                                            extent it is more stringent         include large areas of the
                                            than the standard mentioned         Noosa River and as such
                                            in paragraph (a), (b) or (c);       are adjacent to multiple
                                            e) any other relevant planning      Lots.
                                            scheme standard that is not         (b) The Works are expected
                                            inconsistent with the               to be implemented
                                            standards mentioned in              progressively with Phase 1
                                            paragraphs (a) to (d).              currently planned and
                                                                                Phase 2 to occur over time
                                                                                as funds become available.
                                                                                As such, Phase 2 could
                                                                                include extension of Phase
                                                                                1 reef habitat which could
                                                                                include placement of
                                                                                additional works of their
                                                                                type adjust to the frontage
                                                                                of the same lots as Phase 1.
                                                                                (c) The works are not
                                                                                roofed.
Character and amenity (height, scale and size)
3.1 Prescribed tidal works are of a        The height, scale and size of the    Complies with Performance The applicant has demonstrated
height, scale and size to ensure           prescribed tidal works is            Outcome 3.1               compliance with PO3.1. Given the
the works are compatible with              consistent with each relevant                                  nature of the Project, the height,
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.