Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment the character and amenity of planning scheme standard. (a) The works are of a scale and size of the works is their location, having regard to height, scale and size that considered consistent with the the following— is consistent with natural natural features of the seabed of the (a) the height, scale and size of oyster reefs which have Noosa River. the natural features of the historically been present works’ immediate within the Noosa River. surroundings and the Crest heights are relative to locality within which the tidal levels (Mean High works are located; Water Springs) for (b) the height, scale and size of individual sites. the existing buildings or (b) The works are of a other structures in the lower height and level than works’ immediate other rock structures surroundings and the within the Noosa River locality within which the although extend further works are located; seaward than seawall type (c) if the relevant planning structures in order to scheme states the desired provide larger area of height, scale or size of habitat. buildings or other structures in the works’ immediate surroundings or the locality within which the works are located—the stated desired height, scale or size Character and amenity (materials and colours) 4.1 The materials used for, and the The materials used for, and Complies with Performance The applicant has demonstrated colours of, prescribed tidal colours of, the prescribed tidal Outcome 4.1 compliance with PO4.1. The works are compatible with the works are consistent with each The works include the ‘materials and colours’ of the works character and amenity of the relevant planning scheme placement of locally are considered consistent with the works’ location, having regard standard. sourced rock and oyster planning scheme given that the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.