Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
- Gaps between reef
patches to be 1-4m wide to
allow for careful transit of
monitoring personnel and
public. This gap widens at
water level due to batter
slopes. A wider gap
(minimum 4m) is provided
where land-based access is
viable and
educational visits could be
considered (including at
Tewantin see NROR-2021-
04).
- Monitoring and
Maintenance.
A Safety in Design
assessment has been
undertaken.
Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected to prescribed tidal works
10.1 Prescribed tidal works that are The design and construction of the Not applicable. The Project is not for private
for a private purpose do not prescribed tidal works is The works are not for a purposes therefore PO10.1 is not
adversely affect navigable consistent with the following private purpose. applicable.
access to, or navigable egress standards—
from, any lot that adjoins, or is (a) subject to paragraph (b),
in the immediate surroundings prescribed tidal works—
of, a lot connected to prescribed (i) for a lot connected to the
tidal works. works for which there is
a water allocation area
—are not constructed
outside the water
allocation area; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.