2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                           Acceptable outcome                    Applicant response            Assessment
                                              (ii) for a lot connected to
                                              works for which there is
                                              no water allocation area
                                              —are no closer than
                                              1.5m to that lot’s side
                                              boundary or extended
                                              side boundary;
                                              (b) if a relevant planning scheme
                                              standard is more stringent
                                              than the standard mentioned
                                              in paragraph (a)—the
                                              relevant planning scheme
                                              standard, to the extent it is
                                              more stringent than the
                                              standard mentioned in
                                              paragraph (a).
Infrastructure, including, access, parking, sewerage and water services
11.1 Prescribed tidal works have              The infrastructure for prescribed     Complies with Performance     The applicant has demonstrated
appropriate infrastructure,                   tidal works is consistent with each   Outcome 11.1                  compliance with PO11.1.
including, in particular, road                relevant planning scheme              The nature of the works       Infrastructure including access,
access, parking facilities,                   standard.                             (i.e. restoration of oyster   parking, sewerage and water
sewerage services and water                                                         ecosystems) is such that      services are not relevant to the
services, having regard to the                                                      infrastructure, parking,      operational phase of the Project
following—                                                                          sewerage and water            given the nature of the works.
(a) the nature and scale of the                                                     services are not required.    However where the project
works;                                                                                                            interfaces with existing
(b) the number of people that                                                                                     infrastructure during the
may be on or at the works                                                                                         construction phase (particularly at
at any given time;                                                                                                the load-out facility), appropriate
(c) the number of vehicles that                                                                                   management and separation of
may be on or moored at the                                                                                        project activities from existing
works at any given time;                                                                                          infrastructure has been considered.
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.