Performance outcome Acceptable outcome Applicant response Assessment
(ii) for a lot connected to
works for which there is
no water allocation area
—are no closer than
1.5m to that lot’s side
boundary or extended
side boundary;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
Infrastructure, including, access, parking, sewerage and water services
11.1 Prescribed tidal works have The infrastructure for prescribed Complies with Performance The applicant has demonstrated
appropriate infrastructure, tidal works is consistent with each Outcome 11.1 compliance with PO11.1.
including, in particular, road relevant planning scheme The nature of the works Infrastructure including access,
access, parking facilities, standard. (i.e. restoration of oyster parking, sewerage and water
sewerage services and water ecosystems) is such that services are not relevant to the
services, having regard to the infrastructure, parking, operational phase of the Project
following— sewerage and water given the nature of the works.
(a) the nature and scale of the services are not required. However where the project
works; interfaces with existing
(b) the number of people that infrastructure during the
may be on or at the works construction phase (particularly at
at any given time; the load-out facility), appropriate
(c) the number of vehicles that management and separation of
may be on or moored at the project activities from existing
works at any given time; infrastructure has been considered.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.