2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
response to monitoring of
habitat development.
(f) Stability of rock
structures has been
determined in accordance
with best practice
guidelines. It is not
intended for the works to
be trafficable by
pedestrians as this would
negatively impact on the
habtitat.
(g) The design considers
that the works will be
underwater at times and
subject to hydrostatic
pressures, but given the
nature of the works this is
not critical to the design.
(h) The stability of
individual rocks has been
determined based on
internationally recognised
world’s best practice
guidelines. Rock structure
are inherently flexible and
able to accommodate
some movement or
displacement of individual
boulders, which may occur
during a design event. This
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.