2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
is to be addressed through
maintenance if required.
The oyster shell is not
inherently stable in the
design site conditions, but
shell stability has been
optimised by the use of
whole shell, the mixing of
shell with the rocky
substrate to secure it
within the rocky matrix,
the placement of loose
oyster cultch as a single
layer by hands into
interstitial voids and the
capping of the volume of
loose shell placed to
10kg/m3. Refer ICM
drawing NROR-2021-02
Notes 3 & 5 for placement
requirements. Where
monitoring identifies
displaced shell that is more
than 5m outside the
Restoration Site, it is to be
removed in the event that
it is resulting in negative
impacts. Refer ICM drawing
NROR2021-00 Note 4.2 and
Project Restoration Plan.
12.2 Prescribed tidal works do not The design and construction of the Complies with Performance The applicant has demonstrated
adversely affect the structural prescribed tidal works is Outcome 12.2. compliance with PO12.2. Given the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.