Performance outcome Acceptable outcome Applicant response Assessment
12.4 Prescribed tidal works are The design and construction of the Complies with Performance The applicant has demonstrated
designed and constructed using prescribed tidal works is Outcome 12.4. compliance with PO12.4. Given the
materials suitable for marine consistent with the following The rock utilised is to be nature of the Project and the
environments, having regard to standards— suitable for use in the materials proposed, the works are
their ability to resist the (a) subject to paragraph (b), each marine environment. It is suitable for the marine environment
following— Australian Standard relevant not vulnerable to attack by and comply with relevant Standards.
(a) attack by marine to the materials that should be marine organisms,
organisms; used, or the measures that corrosion, deterioration,
(b) corrosion; should be taken to treat abrasion, immersion in
(c) deterioration or breakage materials used, for structures, seawater or wave action
resulting from exposure to to the extent the requirements within the life of the works.
environmental conditions stated in the Standard apply For specifications, refer
including, for example, the to structures located in a ICM drawing NROR-2021-
following— marine environment; 02 Note 2.1.
(i) abrasion; (b) if a relevant planning scheme The cured oyster shell was
(ii) immersion in standard is more stringent originally sourced from
seawater; than the standard mentioned within the marine
(iii) wave action in paragraph (a)—the environment and is
relevant planning scheme suitable for use in the
standard, to the extent it is Noosa River subject to
more stringent than the curing in accordance with
standard mentioned in relevant legislation. For
paragraph (a). specifications, refer ICM
drawing NROR-2021-02
and Project Restoration
Plan.
12.5 Prescribed tidal works are The design and construction of the Complies with Performance The applicant has demonstrated
designed and constructed in a prescribed tidal works is Outcome 12.5. compliance with PO12.5. The works
way to ensure they do not consistent with the following The works are seaward of are satisfactorily located in order to
adversely affect the operation or standards— MHWS and will not avoid impact to existing stormwater
maintenance of any existing (a) subject to paragraph (c), adversely affect the outlets.
stormwater outlet. vessels moored at prescribed operation or maintenance
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.